ES.30r Slmulator Scenarlo Quallty Checklist Form ES-301-4 Facllity: Byron Date of Exam: 0110712019 Scenarlo Numbers: UAAS Operatlns Test No.:20 l9-30'l QUALITATIVE ARIBUTES lnltlals a
b' cl
- 1. The lnltlal condilions are reallstlc ln that some equlpmnt and/or lnsfumentalion may be out of servlce, but it does not cue the operators lnlo e)eected events.
W4 Sr0 Or4 2, The scenaros conslsl mostly of related events.
rrl s( Ø
- 3. Each event descriplon conslsts of the following:
r the polnt ln lhe scenarlo wlren lt ls to be lnllated o
the malfuncllon(s) or conditions that are entered to lnltlate lhe event the Bymptomg/cuee that wlll be vlslble to the crew r
the expected operalor actlons (by shlft posltlon) r lhe eventlemlnation polnt (if applloable) rt \\rJ 1
- 4. The events are valid u,llh regard to physlcs ard themodynamlcs.
üld
$¿a
-\\
5.
Sequencing and llming of evenB ls reasonable and allou thg xamlnallon team to oblain complete evaluatlon results commensurate with the scenarlo oblectives.
71 q/
kl
- 0. ll time compression technlques are used, the scenario summary clearly so lndicates.
Operators have sufflclent time to carry out elpected activitleE wfthout undue time nstralnts.
Cues are glven.
wr
+t0 ?
- 7. The slmulalor rnodellng ls not altered
ûrttí qrt,P q4 L The scenarlos have bean validated. Pursuant to 10 CFR 55.46(d), any open slmulator performance defrciencles or devlaüons from lhe referenced plant have been evaluated to ensure thal functlonal fldollty ls malntalned wfille runnlng the planned scenarios.
w
$p *1
- 9. Scenarlos are new or slgnlficantly modified ln accordance wlth Sectlon D,5 of ES-301.
wl
$,0 c-1
- 10. All lndividual operator competencies can bo evaluated, as verlfled uslng Form ES-301-6 (submit the fom along with the simulator scnarios).
rø (fo (/)
1 1. The scEnarlo set provldes the opportunity for each applicant to be evaluated ln each of lhe appllcable ratlng lactors. (Competency rallno factors as described on Foms ES-303-l and ES-303-3.)
ûíl ar!
(/.vl 12, Each appllcant will be slgnlrcantly lnvolved ln the mlnlmum number of translents and events spsclllsd on Fom ES-301-5 (submlt the form wlth the slmulator scsnarlo).
tø) ef{
I ry
- 13. Appllcants are evaluated on a slmlla number of preidentifred crltical tasks across scenaios, ulren posslble.
iltul srP lt
- 14. The level of dlfticulty ls approprlate to support llcnslng declslons for each crew posltlon.
Wt s4
â4 Targot Quantltatlve Attrlbute per Scgnarlo ($ee Sectlon D.5.d)
Actual Aürlbutes
- 1.
Malfunctlons after EOP ntry (1-2) 1t1t1l2l2
- 2.
Abnormal events (2-4) 5t4t5l6t3 tbr u1
â-.t
- 3.
MaJor transients (1-2)
'U1t1l1l1
//1/rl iú Llt
- 4.
EOPs entered/requlrlng substantive aclions (1-2) 1tlt1t1l2 (trr
/^â 5.
Entry lnlo a conllngoncy EOP wlth substantlve actlons I per scenario ss0 CrewA-3/B-2 tc-2tD-2tE-2 tbt 0{t tu)
- 6.
Preidentifred øltlcal tasks (¿ 2) 3ls t3l2l2 tllol 0d
' The faclllty llcnse slgnature ls not appllcable for NRC-devoloped tsts.
- An independent NRC revlevwr lnitials ltems in column 'c'; chlef examlner concurencie is requlred.