Forwards IE Insp Repts 50-245/80-18 & 50-336/80-20 on 801005-1108.No Noncompliance Noted
ML19345F385
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/17/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19345F386 List:
References
NUDOCS 8102170374
Download: ML19345F385 (2)


See also: IR 05000245/1980018

Text

.

.

-

.

-

--

.

. . -

- . . ..

'

7.:r_.

8

%

UNITED STATES

E

NUCLEAR REGULATORY COMMISSION

o

L

j

REGION I

.

,.

,

4

631 PARK AVENUE

.

k

D

'

KING OF PRUSSIA, PENNSYLVANIA 19406

/

. . . . . ,o

DEC 171980

s

Docket Nos. 50-245

'

-

50-336

.

t

,

Northeast Nuclear Energy Company

)[

~)

'

,

ATTN: Mr. W. G. Counsil

- .

Ol ",8

'

Senior Vice President - Nuclear

-

-

Engineering and Operations

'A u.s. - am=on /~

P.O. Box 270

Q

Q

" ' " "

Hartford, Connecticut 06101

/

%

p

"

Gentlemen:

Subject:

Combined Inspection 50-245/80-18 and 50-336/80-20

This refers to the routine inspection conducted by Mr. J. Shedlosky of this

office on October 5 through November 8,1980 at the Millstone Nuclear Power

Station, Waterford, Connecticut, of activities authorized by NRC License

Nos. DPR-21 and DPR-65 and to the discussions of our findings held by

Mr. Shedlosky with Mr. Mroczka and other members of your staff periodically

during the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must be accompanied by an. affidavit executed by the owner of the

infonnation, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subparagraph (b)(4)

of Section 2.790. The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear

from you in this regard within the specified period, the report will be placed

in the Public Document Room.

810217037/

p

-

<

.

.

DEC 171980

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

1

.

E d n J. Brenner, Chief

Reactor Operations and Nuclear

Support Branch

.

Enclosure: -Office of Inspection and Enforcement Combined

Inspection Report Number 50-245/80-18 and 50-336/80-20

cc w/ encl:

J. F. Opeka, System Superintendent Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

.