Forwards Encl 3,evaluation of Evacuation Time Estimate, Inadvertently Omitted from NRC Re Emergency Response Plan Criteria
ML19345F295
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/27/1981
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 8102170134
Download: ML19345F295 (2)


Text

!

.-s 52 Kico

,(

o UNITED STATES g

y, g

NUCLEAR REGULATORY COMMISSION

~;

9 E WASHINGTON, D. C. 20555 o

' +, '

January 27, 1981 Docket No. 50-271 Mr. Robert L. Smith Licensing Engineer Vennont Yankee Nuclear Power Corporation 1671 Worcester Road Framingham, Massachusetts 01701

Dear Mr. Smith:

The enclosed page was inadvertently omitted from your copy of the letter we sent you dated December 9,1980, dealing with criteria for emergency response plans. This page is the facility rating sheet described as to the December 9,1980 letter.

Sincerely, 0 cG m" Thomas A/ Ippolito, Chief Operating Reactors Branch #2 Division of Licensing

Enclosure:

As stated

'.!/ oh,.

l Tgf s'

<3 8. \\ @

l 1

  1. a 1c-

,, *f0 E

,Il l

9-1 8102170\\39 C

i

a EVALUATION OF EVACUATION TIME ESTIMATE Vermont Yankee Item Excel.

Adeg.

Poor None

Background

X A. Area Map X

B. Assumptions X

C. Methodology Demand Estimation X

A. Permanent Population x

B. Transient Population x

C. Special Population f

Traffic Routing X

A. Map of Network X

B. Capacity of Segment Analysis X

A. Components Considered X

B. Adverse Condition Considered X

Overall l

l C

f f

W 6

.t-51

-