i OPERATING DATA REPORT DOCKET NO 50-333 DATE F#EFUA?Y 1931 COMPLETED BY E-
"7 ET TELEPilONE ( 315 i f"i-38h0 f
OPERATING ST AT US N
5 FitzPatrick
- 1. Unit Name:
310101-81Cl31
- 2. Reporting Period:
20N
- 3. Licenwd Thermal Power (MWI):
- 4. Nameplate Rating (Gross 31We):
D
- 5. Design Electrical Rating (Net MWe):
300
- 6. Masimum Dependable Capacity (Gross MWe):
310
- 7. Masimum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gise Reasons:
None
- 9. Power Level To which Restricted,if Any (Net MWe):
None
- 10. Reasons For Restrictions.lf Any:
This Month
. Yr..to Date Cumulatise IUU 744 NO361 II. Hours In Reporting Pen *od
- 12. Number Of Hours Reactor Was Critical Ah2 3 Ah2.9 71h96.9 0
0 0
- 13. Reactor Reserve Shutdown Hours 516.7 516.7 32alg.5
- 14. Hours Generator On-Line 0
0 0
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1140~04 11gc70h Anthoocp 405290 405290 22234800 17 Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 392240 3c22ho 21517320 60,h%
60.44 67.0%
- 19. Unit Senice Factor 69.4%
69.4%
67.0%
- 20. Unit Availability Factor o 5. l '.
c5.1%
o 0. 2 '.
- 21. Unit Capacity Factor (Using MDC Net)
C ". C+
6u.2%
54.2%
- 22. Unit Capacity Factor lUsing DER Net) 70.6#
10.Ae 7Q. g
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior o Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCI AL OPER ATION CIO2170goj,
l AVER ACE D AILY UNIT POWER LEVEL 3.*#_117 DOCKET NO.
--s
- Ar"en T - --
UNIT rr=
t'"a=v
, 0 2,
. T 'L'
- ~ ~ ' ' * -
.,r.--.,,
COMPLETED dY 1
12 r n -
/ 2 ' ; 3 0 a 2_ ; *% 0 TELEPilONE
" ^ * ' ' ^ g *f 3 -03
- .vev.
~~
-?'-
510NTM DAY AVER ACE DAILY POWER LEVEL DAY AVER ACE DAILY P0hER LEVEL (51We Net)
(3!We Netj 20:
3 1
--s
'J 2
-21 13 32; 19 3
'9 4
o f '*
20 007 eg
--s 5
O 6
32' 0
0:4 y
y 0
8 322 24 0 ',,
25 0
9
,n 2-*
26
-s c
10 Cep-2 ll 500 327
,S 13 10 "o;
29 13
--c s0--
30
'4 14 a,
430 31
+--
15 a4 ;
16 c c.,.n:u :
s.e un4.t operated at near 100', of rated ther:nal ecwer for
^
the first 17 days of this reporting period.
The unit scra:..ed on January 17, 1931 due to loss of the U?S.
The unit was back on line on January 26, 1931 and pcwer was increased at the pre-conditioning rate.
i
' 'l UNIT SilOTDOWNS AND POWER REDUCIlONS DOCKET NO.
UNIT NA*:c; J AI'III P i
OATE FEBRUARY, 1981 JANUARY 1981 COMPLETED BY M-XIIF El /l' REPORT MONTil TELEPilONE (ll6I14?-1840 i
i
's w e!:.
i
~
S c
~
.2 _e s
,.s 'A Licensee ev c
a.
Cause & Corrective o
N. i.
Date g
3.=.
g
,g g 5 Event u?
E.3 Action to s
3.
u j
Report =
in U eo Prevent Recurrence o C.
0:
3 173 g
6
\\
1 810117 F
227.3 11 4
Per sonnel er r ot-caused loss NA NA flA of UPS 1
i I
2 3
4 F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee J
~
C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operatur Training & License Examination F-Administ rative 5
G Operational Error (Explain)
Exhibit 1 -Same Souree Il-Other (Explain) 1 w.
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES JANUARY 1981 During this reporting period, the unit operated at near 100%
rated thermal power for the first 16 days.
On January 17, 1981 a worker inadvertantly tripped a breaker on the UPS which caused the plant to scram.
During this outage period, it was decided to perform the scheduled snubber inspection and maintenance that was planned for February.
The inspection and maintenance work was completed on January 26 and the unit was put back on line with power being increased at the p:s-conditioning rate.
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL 8 MECHANICAL M.%INTENANCE
SUMMARY
DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
HOURS 2/19/81 1
14 q,3 g: ailed motor bearing.
Iteplaced motor bearing.
44 g
1/7/81 88 7506
'TIG2~
Ops Wate r in Transmi t t er.
Dried G cleaned. Aligned transmitter 6 receiver.
Iteplaced 24 t/AC P.S., 4 Decoder cards. Itepaired broken wire.
48
~ l 15 Special Inspec-None found.
Special check of valve motor operator
~
tion for seal leaks.
20 1837 1/19/8 14
-g y;12A NA Preventative maintenance.
NA 26 1/19/81 14 1837 bl0V-5A NA Preventat ive blaintenance.
NA 32 1/21/81 27 12326
~ ~MUI ~~ ~
Ops St icky Auxil'inry Cont act in Iteplaced Auxilia ry r_ nt act.
18 Controller.
l/20/81 14 1837 fl0V~~l l A~
NA Preventat ive Flaintenance.
NA 30
~
1/20/81 03 7443 3't 47!~~
Ops l'aulty lleed Switch iteplaced lleed Switch in Control itod
~
Position Probe.
4 i
I/20/81 03 12165 10-39 Ops l'aulty lleed Switch Iteplaced lleed Switch in Cont rol Itod Position l' robe.
2 1/20/81 03 8310 18-11 Ops I:aulty Iteed Switch iteplaced Iteed Switch in Cont rol Itod Position Probe.
2
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
WORK REQUEST #
REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME ENT #
HOURS t/20/81 03 7982 30-07 Ops Faulty Reed Swie:h Replaced Reed Switch in Control Rod Position Probe 3
4 1/20/81 03 7447 11)T1 l~
Ops Faulty Reed Switch Replaced Reed Switch in Control Itod Position Probe.
2 4
1/22/81 93 10514 Droop Switch Ops Faulty Switch (intermittent Replaced switch.
8
!!DG B 6 D 4
1/22/81 93 1 6 437_2 Ops Faulty Switch (intermittent i Replaced switch.
8 t/22/81 03 11623 IICll 10-47 Visual Faulty "O" Ring.
Replaced Detector G "O" Ring 9
i 1/22/81 14 10390 MOV-SA Ops Valve Seat Backed Out.
Reinstalled seat.
21 1/17/h1 27 10800 P-2A Ops Worn Pump.
Iteplaced pump.
5 1/24/81 34 12199
~ ilV-I l l B Ops Failed solenoid valve.
Replaced valve.
18 N
1/24/81 34
_12198 NRV-Illa Ops Failed solenoid valve.
Replaced valve.
16 1/26/81 34 11099 NRV-IllB Visual 1.cating Packing Box, Flange Replaced gasket.
4 Gasket.
1/30/81 10 11739 Ops' Water running down cables Pumped monhole - replaced t ransformer.
12 MOV-3911 caused control panel x-foro r
to burnout.
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT i
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
WORK REQUEST #
REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME f.
It00RS 1/30/81 46 11133 fl0V-101A N/A No malfunction - opened l
bl0V-102A box for QC inspection.
N/A 3
i i
4 4
1 L
i l
l
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
JANUARY 1981 I&C ACTION TAKEN REPAIR WORK REQUEST #
CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM H
ECTED COMPONENT #
MALFUNCTION MALFUNCTION 9ECURRENCE HOURS 1/8 02-3 10173 Excess pressure Out of toleranc t Troubleshoot LIS-101B I&C from lock screw
& calibrate 12.0 I&C 1/8 02-3 101711 Leaky Replaced Overheat 11.0 Spare power capacitor capacitor 1
supply Could not Replaced &
1/9 02-3 10167 I&C Unknown calibrate calibrated 10.0 LIS-101B 1/8 03 10581 Erronous Troubleshoot UTSC-D OPS Noise alarms found ok 5.0 1/8 03 10176 I&C N/A N/A Check UTSC-A,b,C,D calibration 30.0 1/20 03 80111 OPS Unknown No rod Could not 1.0 Rod 50-27 pern.insive duplicate 11cht problom 1/20 03 10635 OPS Broken No rod out Aepaired Rod 02-19 lead permissive broken lead 10.0 1/20 03 12169 Open transistor can select Repaired probe HMCS OPS on probe buffer nny rod buf fer card 1 11. 0 e n m1 1/30 03 116611 Incorrect full Required probe Rod 30-11 OPS Bad transistor in indication buffer card 3.0 1/20 05 12298 will not Adjusted LS-23B OPS Unknown reset reset 2.0 1/20 06 10372 Recorder goes Could find no FR-96 OPS Unknown downscale problem 10.0 1/211 06 12337 I&C Replaced valse Unequal levels Vented 16.0 LT-52A, B, C Manifold instruments
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
.T A Nil ARY 1981 T&n ACTION TAKEN REPAIR WORK REQUEST #
CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM DETEGED COMPONENT #
MALFUNCTION MALFUNCTION RECURRENCE HOURS 1/211 06 10397 I&C Age /use Valvea leak Ileplaced LT-52C by manit'old 12.0 1/20 07 10S19 flead high when Found LPHMS OPS Unknown bypanned sat.lu t'ac t ory 2.0 He ve r" led Reverned 30.0 i>
OPS Installation 1;l{_3fB/lll-37C leads leads i
1/20 07 12158 Adjunted PR l6A OPS Use Erratic ga1n 2.0 i
1/20 07 1223f OPS Use/ age Will not leplaced HBM-L null
, sticky relay 16.0 1/27 07 10955 OPS Unknown Erratic Tested ok 11. 0 LPHM-28 f5A l
1/30 07 11706 OPS N/A Bypana 1i ht Works as LPHM lill-37C ntays on designed 1.0 1/30 07 11707 OPS N/A Bypass light Worka an 1.0 LPRM l ll-37B staya on designed i
Becomen Card replaced 8.0 1/29 07 11709 OPS De t'ective 2nd inoperable iiBM-B Ig gl,,,mult1-linable to Heplaced &
12.0 1/8 12 10638 1&C Age calibrate calibrated 12-TIS-99 1/8 13 1 0117 3 OPS Sticky Sluggish Heplaced &
13-SPI-1 meter operation calibrated 12.0 I
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT 1
MAINTENANCE
SUMMARY
JANUARY 1981 I&C ACTION TAKEN REPAIR WORK REQUEST #
CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM DETECTED COMPONENT #
MALFUNCTION MALFUNCTION RECURRENCE HOURS 1/20 17 10802 Broken RM-456B OPS Unknown detector Replaced 8.0 1/16 20 12295 I&C Faulty Square Would not Replaced &
SQX-526 rooter calibrate calibrated 21.0 1/20 23 10644 No Repaired 23-TE-94A f&C Installation indication connection 11. 0 1/26 23 12167 Faulty Did not obtain Replaced &
16.0 llPCl OPS controller full speed calibrated controller 1/20 27 12224 OPS N/A Reading high Found 0 AZ-101A natisfactory 18.0 1/30 27 1118 No Replaced RR-104A OPS Age Indication mechanical components 40.0 1/2U 29 10457 OPS Unknown Will not PNS-80A reset Calibrated 16.0 1/8 68 10556 OPS Loose Errat.ic Tight,ened TI-100 connection readings contiection 10.0 1/20 02 10162 I & C' Test equip founi l N/A Performed FT-110H out of calibra-P-ISP-63-1 18.0 tion 1/20 02 11434 No response Replaced FI 2.0 FI-lS9A OPS Drift
& calibrated Tested "" y ""Y 30 1/24 02 10153 I&C Unknown No response 6
bI ~f!isarfok VM-71J a
1/24 02 12301 OPS N/A N/A Reinstalled 15.0 VM-71G after mn I nt enance