ML19345F237

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 801013-1121
ML19345F237
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/22/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19345F236 List:
References
50-443-80-12, NUDOCS 8102130020
Download: ML19345F237 (1)


Text

O APPENDIX A

, NOTICE OF VIOLATION Public Service Company of New Hampshire Docket No. 50-443 This refers to the inspection conducted by the resident inspector assigned to the Seabrook Station, Units 1 and 2, Seabrook, New Hampshire, of activities authorized by NRC License No. CPPR-135.

During this inspection, cor/.ted Octobar 13 - November 21, 1980, the following apparent item of noncomplit ce was identified:

10 CFR 50, Appendiy. 3, Criterion V states, in part, that:

" Activities i

affecting quality shall be... accomplished in accordance with (the prescribed) instructions, procedures, or drawings."

The Seabrook Station PSAR for Units 1 and 2 states, in part, in paragraph 17.1.5 that:

"Each organization is required to perform their respective quality related activities covered by this program in accordance with docu-mented instructions, procedures, or drawings." The Seabrook Station PSAR also commits in Section 3 to the ASME B&PV Code,Section III (1977 Winter Addenda) for piping.

Section III of the ASME B&PV Code, 1977 edition with Winter Addenda, Sub-section NC-2500 refers to the (UE&C) material specification for base metal repairs to pressure retaining material. Also, Subsections NC-2400 and NC-l 4300 require repair welding conformance to ASME Section IX.

l ASME Section IX requires, among other things, that thickness and joint l

design are essential variables.

UE&C Specification 006-248-1, Revision 4, l

indicates that a liquid penetrant test (LPT) is required for the final examination of base metal repair welds on stainless steel.

Contrary to the above, on October 24, 1980, a base metal repair to stainless steel pipe spool E2936-132 was accomplished by welding using a welding procedure specification unqualified for the actual welding process thickness and indicating a type of joint (fillet) inappropriate to the repair. Addi-tionlly, no LPT was scheduled or accomplished on the completed repair weld.

This is an infraction applicable to Docket No. 50-443.

l 8102180 o'2Z>

l

.