Forwards IE Insp Rept 50-155/75-04 on 750324-26. Noncompliance Noted
ML19345F206
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/02/1975
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Haueter R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19345F207 List:
References
NUDOCS 8102100001
Download: ML19345F206 (2)


See also: IR 05000155/1975004

Text

--

-

_-

_

_--

0*

>*

'

UNITED STATES

NUCLEAR REGULATORY COMMISSION

,

REGION 111

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

c, f

2 1975

Consumers Power Company

Dochet No. 50-155

ATTN: Mr. Robert L. Bauster

Elsetric Production

Superintendent - Nuclear

i

212 West Michigan Avenue

'}

n

[

g

g

l

l

Jackson, Michigan

49201

Gentlemen:

This refers to the investigation conducted by Messrs. L. Buster and

E. Jordan of this office on March 24-26, 1975, of activities at the Big

Rock Point plant authorised by NRC Operating License No. DPR-6, and to

the discussion of our findings with Mr. Abel and others of your staff at

the conclusion of the investigation and subsequent telecon with Mr.

Hartman of your staff on April 17, 1975.

A copy of our report of this investigation is enclosed and identifies

the area e==fwed during the investigation. Within this area, the

investigation consisted of a selective ===intion of procedures and

representative records, interviews with plant personnel, and observations

I

by the inspectors.

During this investigation, it was found that certain of your activities

appear to be in noncompliance with NRC requiressants. The item and

reference to the pertinent requirements are listed under Enforcement

Action in the Summary of Findings Section of the enclosed investigation

,

report.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2 Title 10, Code of Federal

Regulations. Section 2.201 requires you to substit to this office within

twnty days of your receipt of this notice, a written statement or

explanation in reply, including:

(1) corrective steps which have been

taken by you, and the results achieved; (2) corrective steps which will

be taken to avoid further items of r.oncompliance; and (3) the date when

full compliance will be achieved.

oWT'%

1

9

N>?.. ) 8/o R/o D O O/

f

-.

$

.. .

.

P00R ORIGINAL

-

Consumers Power Company

-2-

MAY

2 1975

Along with your reply to the item of noncompliance we request that you

reply to the deviation which is also identified in the Summary of Findings

Section of the attached report. Further we request that you reply as

to whether you consider the Snyder Hood an approved device for which

you may apply a respiratory protection factor.

If your response is in

the affirmative please provide in your reply the specific NIOSH (National

Institute for Occupational Safety and Health) or BOM (Bureau of Mines)

approval number for the device.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this notice, the

enclosed investigation report, and your response to this notice will be

placed in the NRC's Public Document Room.

If this report contains any

information that you or your contractors believe to be proprietary, it

.

is necessary that you make a written application to this office, within

twenty days of yeur receipt of this notice, to withhold such information

from public disclosure. Any such application must include a full statement

of the reasons for which it is claimed that the information is proprietary,

and should be prepared so the propriatary information identified in the

application is contained in a separate part of the document. Unless we

receive an application to withhold information or are otherwise contacted

within the specified time period, the written material identified in

this paragraph will be placed in the Public Document Room.

Should you have any questions concerning this investigation we will be

glad to discuss them with you.

Sincerely yours,

Caston Fiorelli, Chief

Reactor Operations Branch

Enclosure

IE Investigation Report

No. 050-155/75-04

cc:

C. Sonnenberg, President, w/ encl

bec: IE Chief, FS&EB

IE:HQ (4)

Licensing (4)

ScAtI21_EMfm

IE Files

l

PDR

'

Local PDR

NSIC

TIC

R. Callen

A. Roisnan