COL Docs - FW: Acceptance of LAR-19-010, Auxiliary Building Room Heat-up
ML19345F058
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/11/2019
From:
NRC
To:
NRC/NRR/DNRL
References
Download: ML19345F058 (4)


Text

From: Gleaves, Billy Sent: Wednesday, December 11, 2019 11:59 AM To: Chien, Nan; Tjader, Bob; Neuhausen, Alissa; McConnell, Matthew; Ray, Sheila; Vogtle PEmails Cc: Cusumano, Victor; Wittick, Brian; Rosenberg, Stacey; Martinez Navedo, Tania

Subject:

FW: Acceptance of LAR-19-010, "Auxiliary Building Room Heat-up" (EPID L-2019-LLA-0104)

Hi all, Forwarded for your information is our acceptance letter for Vogtle LAR-19-010.

Sincerely, Billy William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy and are not binding on the Commission.

From: Gleaves, Billy Sent: Wednesday, December 11, 2019 11:49 AM To: Eddie Grant - SoCo Contractor (x2edgran@southernco.com) <x2edgran@southernco.com>

Cc: Arafeh, Yasmeen N. <YNARAFEH@southernco.com>; Hall, Victor <Victor.Hall@nrc.gov>; Patel, Chandu (Chandu.Patel@nrc.gov) <Chandu.Patel@nrc.gov>; Santos, Cayetano

<Cayetano.Santos@nrc.gov>; Butler, Rhonda <Rhonda.Butler@nrc.gov>

Subject:

Acceptance of LAR-19-010, "Auxiliary Building Room Heat-up" (EPID L-2019-LLA-0104)

Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway BIN N-226-EC Birmingham, AL 35243

SUBJECT:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS VOGTLE 3&4, AUXILIARY BUILDING ROOM HEAT-UP (LAR-19-010) (EPID NO. L-2019-LLA-0104)

Dear Mr. Whitley:

By letter dated November 22, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19326D430), Southern Nuclear Operating Company (SNC) submitted a request for a license amendment to Combined License (COL) Numbers NPF-91

and NPF-92, for the Vogtle Electric Generating Plant Units 3 and 4 (VEGP), respectively. The requested amendment proposes changes to depart from Updated Final Safety Analysis Report (UFSAR) Tier 2 information (which includes the plant-specific Design Control Document (DCD)

Tier 2 information), involves related changes to plant-specific Tier 1 information, with corresponding changes to the associated COL Appendix C information). The amendment request proposes changes to address potential effects within AP1000 Auxiliary Building spaces following loss of heating, ventilation and air conditioning (HVAC) or loss of ac power events.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission staffs acceptance review of these requests. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the staff to complete its detailed technical reviews. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of the 10 CFR, an amendment to the license must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 52.79 of the 10 CFR addresses content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment, in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staffs detailed technical review by separate correspondence.

SNC has requested staff approval of this LAR by May 22, 2020. The staff intends to complete this action by May 22, 2020. The staff estimates that it may take 590 total hours to complete this licensing action, which includes resources already expended.

If you have any questions, please contact me at (301) 415-5848 or bill.gleaves@nrc.gov.

Sincerely, Billy William (Billy) Gleaves Sr. Project Manager Vogtle Project Office Office of Nuclear Reactor Regulation Docket No(s): 52-025 52-026

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 509 Mail Envelope Properties (BL0PR0901MB43872DB1BFAC6085AF4F84FB9F5A0)

Subject:

FW: Acceptance of LAR-19-010, "Auxiliary Building Room Heat-up" (EPID L-2019-LLA-0104)

Sent Date: 12/11/2019 11:58:39 AM Received Date: 12/11/2019 11:58:42 AM From: Gleaves, Billy Created By: Bill.Gleaves@nrc.gov Recipients:

"Cusumano, Victor" <Victor.Cusumano@nrc.gov>

Tracking Status: None "Wittick, Brian" <Brian.Wittick@nrc.gov>

Tracking Status: None "Rosenberg, Stacey" <Stacey.Rosenberg@nrc.gov>

Tracking Status: None "Martinez Navedo, Tania" <Tania.MartinezNavedo@nrc.gov>

Tracking Status: None "Chien, Nan" <Nan.Chien@nrc.gov>

Tracking Status: None "Tjader, Bob" <Theodore.Tjader@nrc.gov>

Tracking Status: None "Neuhausen, Alissa" <Alissa.Neuhausen@nrc.gov>

Tracking Status: None "McConnell, Matthew" <Matthew.McConnell@nrc.gov>

Tracking Status: None "Ray, Sheila" <Sheila.Ray@nrc.gov>

Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office: BL0PR0901MB4387.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4835 12/11/2019 11:58:42 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: