Text
w/4
.
4
3 #%
UNITED STATES
., e
4
NUCLEAR REGULATORY COMMisslON
f
N I,
REGION I
e
3 , W
'g
631 PARK AVENUE
MING OF PRUSSI A, PENN5VI,.V ANI A 19406
,
- '
nc:: a
Docket No. 50-271
f%
&
9)
Vermont Yankee Nuclear Power Corporation
( g ^)-
\\
(
ATTN: Mr. Robert L. Smith
9
Licensing Engineer
%'-
20 Turnpike Road
$ gghN
Westborough, Massachusetts 01581
if
,
t
mmu
Gentlemen:
Q
//
Subject:
Inspection No. 50-271/80-20
4
This refers to the routine inspection conducted by Mr. W. F. Sanders of this
office on November 19-21,-1980 at the Vermont Yankee Nuclear Power Station,
Vernon, Vermont of activities authorized by NRC License No. DPR-28 and to the
discussions of our findings held by Mr. W. F. Sanders with Mr. W. Murphy of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no itens of noncomplisoce were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice." Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this rep::rt contains
any information that yod (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
l
considered by the Comission as listed in subparagraph (b) (4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
~
l
810 2 0 6 0 'M
Q
-
,
._
.
_
'
.
.
.)
Vermont Yankee Nuclear Power Corporation
2
.
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
k ff
4=
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-271/80-20
cc w/ encl:
Mr. Warren P. Murphy, Plant Superintendent
Mr. W. F. Conway, Vice President and Manager of Operations
Mr. J. E. Griffin, President
Mr. L. H. Heider, Vice President
!
<
t
I
r
i
.
-
r
4
y
-T.*+g.
g
9-w-ncw--g-
w
-
y
y
y-r
- e a
w
-,m--gw-g
-
--
y
+
+n-