A CONSUMERS POWER COMPANY Docket'50-155 Request for Change to the Technical Spe _ifications License DPR-6' For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in the Facility Operating License DPR-6, Docket 50-155, issued to Consumers Power Company on May 1,196k, for the Big Rock Point Plant be changed as described in Section I below:
I.
Chances i
l Add a new paragraph (i) to section 11.h.5.3.A.1, Emergency Power Sources as-follows:
"1.
Test and calibrate the three (3) single-rhase Under-Voltage Relays 127-10 XY, XZ, and YZ."
Add a new section (B) to section 11.3.5.3, Emergency Power Sources as follows:
"B.
During power and refueling operations, the three (3) ' single, phase Under-Voltage Relays 127-10 XY, XZ, and YZ shall be operable, except as specified below:
1.
One (1) relay may be taken out of service for any length of time if the output of the relay is placed in a tripped condition. "
Add a new sentence to the Bases for D:ergency-Power Sources as follows:
At the end of the first paragraph after "... switching period." add "An under-voltage trip-isolates the 2h00 volt bus prior.to any postu-lated equipment degradation."
II.
Discussion The'above proposed Technical Specifications changes,are requested to L
nake the Technical Specifications accurately reflect _the Under-Voltage -
Protection modification which was recently completed. _ This modifica-tion was made pursuant to NRC letter-dated June 3, 1977 which provided i
guidance with respect to under-voltage protection.
The addition of the second level of under-voltage protection for station -
power was installed to protect plant equipment from sustained degraded 9
voltage resulting from offsite power source conditions. The requested Technical Spec 3 fications changes. designate the operability and' surveil -
~
lance requirer.ents for_ the newly added equipment. Additionally, the modification is reflected in the Bases for Emergency Pover Sources.
+
k TlOh0606lI-
2 III. Conclusion Based on the foregoing, both the Big Rock Point Plant Review Committee and the Safety and Audit Review Board have reviewed these changes and find them acceptable.
CONSU!ERS PO'4ER COMPA'iY
'N By r/.l J.lLC 14(
'ls R B De'4itt, Vice President Nuclear Operations Sworn and subscribed to before me this 3rd day of February 1981.
r 1
/ ) s71 gig
!) / :( c W'='7Hj Linda K Carstens, Notary Public Jackson County, Michigan My co==ission expires June 10, 1981.