ML19345E741

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-285/80-21 on 801101-30.No Noncompliance Noted
ML19345E741
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/18/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Jones
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML19345E742 List:
References
NUDOCS 8102050829
Download: ML19345E741 (2)


See also: IR 05000285/1980021

Text

7/C

  • f .. .. 6',,

UNIT [D STATES

[w

'[

NUCLEAR REGULATORY COMMISSION

-

i Q), . @t

  • .

3

.r#/ . J

nt croN IV

b]

611 RYAN PLAZ A DRIVE. SulTE D00

,-

ARUNGloN. TEXAS 7fio11

') ,

eceder 18, M80

In Reply Refer To:

~

Docket No. 50-285/80-21

[Q

h

/

/

Omaha Public Power District

/W ikI-

g t.

ATTN: Mr. W. C. Jones, Division Manager -

C

W',u

L-

~~i

'

  1. Df'

h * "Su", g

f/

Production Operations

1623 Harney Street.

Omaha, Nebraska 68102

Q

-/

i

Gentiemen:

ki --

This refers to the inspection conducted under the Resident Inspection Program

by Mr. D. L. Kelley of this office, covering the period of November 1-30, 1980,

of activities authorized by NRC Facility Operating License DPR-40, and to the

discussions of the finding by the inspector with members of your staff at the -

conclusion of each segment of the inspection.

Areas examined during the inspection and the findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

,

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

A

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement'of the reasons

why it is claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained in an

l

enclosure to the application, since the application without the enclosure will

l

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

I

l

!

l

l

l

,

81020506Rq

G

.

.

Omaha Public Pcwer District

2

December 18, 1980

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

$IfVlG

,G. L. Madsen, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

IE Inspection Report No. 50-285/80-21

cc w/ enclosure:

S. C. Stevens, Manager

Fort Calhoun Station

Post Office Box 98

_ . -

Fort Calhoun, Nebraska 68102

.

4

4

l

.

.