Forwards IE Insp Repts 50-518/80-26,50-519/80-23, 50-520/80-26 & 50-521/80-22 on 801101-28.No Noncompliance Noted
ML19345E706
Person / Time
Site: Hartsville  
Issue date: 12/30/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19345E707 List:
References
NUDOCS 8102050639
Download: ML19345E706 (2)


See also: IR 05000518/1980026

Text

,

Y

~

f4c?p ne%'o,

UNITED STATES

["

[j

NUCLEAR REGULATORY COMMISSION

s

,

e

REGION 11

t;f

-

101 MARIETTA ST., N.W., SUITE 3100

o,,

  • -

V j'

ATLANTA, GEORGIA 30303

'

  • ....

OE0 ? + pq

In Reply Re

To:

RIbWBS

'518/80-26

i

-

I

50-519/80-23

50-520/80-26

(

'

~

.-,

//[

f

,

50-521/80-22-

\\\\

?$$g2/Sgg T

"

--,

Tennessee Valley Authority

. u. , k' rig

-

ATTN:

H. G. Parris

5

Manager of Power

500A Chestnut Street Tower II

k,

(/

Chattanooga, TN 37401

g

Gentlemen:

This refers to the inspection conducted by W. B. Swan of this office on November 6

through November 26, 1980, of activities authorized by NRC Construction Permit

Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville facility, and

to the discussion of our findings held with R. T. Hathcote at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative reccrds, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in rue enclosed report.

In accordance with Section 2.790 of the NRC's Rules of Practice", Part 2,

-

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any info rmation that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a fuil statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

8102050f y

.

.

r

.

Tennessee Valley Authority

-2-

DEC 3 C 1987

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

mys C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos.

50-518/80-26, 50-519/80-23

50-520/80-26 and 50-521/80-22

cc w/ encl:

R. T. Hathcote, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. Wills, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

H. J. Green, Division Director

'-