Text
J e
r.
C00SilmBIS i POW 0r i
Ccmp2ny c n.r.i one..: m w..t u.cnia.n 4v.nw., seew.on. uicna.n.omoi. 4,.. coa. si7 7ee.osso t
a s r-Q
/%
August 9, 1977
'pC.
N
'v,,
& c.~* '
- 6 Q
.f r?
(
~
h&
h N V hg/g,'.
Mr Samuel J Chilk
- /
Secretary of the Commission
\\'h'h','N\\/
US Nuclear Regulatcry Cc==ission 6'
- 'ashington, DC 20555 n
DOCKLT 50-155 - LICENSE DPR BIG ROCK POINT PLANT - RESPOIiSE TO SECTION (3)(11) 0F ME'40RANDUM AND CRDER DATED MAY 26, 1976 The purpcse of this letter is to document actions taken by Consumers Power Company in co=pliance with the Co= mission's Memorandum and Order dated May 26, 1976.
l!
_t.
"(3) Prior to return to operation following the refueling outage currently scheduled for spring 1977, Consumers Power shall:
(ii) Provide test data showing the adequacy of the no::le spray system to provide adequate spray distribution during expected usage conditions or modify the nos le spray system to provide adequate spray distribution."
Response
In order to facilitate the testing required, Consumers Power Company contracted the General Electric Company to develop a full scale model and perform a detailed test program for the Big Rock Point Emergency Core Cooling System (EOCS) no::le.
The General Electric Company then subcontracted the NUS Corporation to conduct the actual spray distribution tests.
In total, over 500 tests utilizing 80 different no::les were conducted. The cost of the project, to date, is more than $600,000.
Rather early in the testing program it was apparent that the core spray no::le presently installed at Big Rock Point did not provide adequate spray distributicn I
at elevated pressures. Therefore, it was necessary to develop a suitable replace-ment no::le. This no::le has been fabricated. Attachment 1 is the NUS report i
detailing the testing apparatus, the testing methodology and the test results en the ECCS core spray no::le to be utilized at Big Rock Point.
l g_w ;,.f'[rE
-a 2/Mo@36~
O 2
The test parameters chosen to qualify the ECCS spray no::le were those submitted in Appea*iix A of a Big Rock Point Technical SIecifications change request dated July 25, 1975, and approved in the Safety Evaluation Report of Amendment 10 to the Big Sock Point Technical Specifications dated June h, 1976.
In general, the acceptance criteria stipulated a minimum spray flew of one (1) gallen per minute to each assembly at reactor vessel pressures ranging from 0 to 75 psig.
Cor-responding ECCS header flow rates (utilizing the vorst single failure conditions) ranged from h67 gpm to 296 gpm, respectively.
It must be noted that the ECCS spray no::le to be installed at Big Ecek Point is the actual no::le utilized in the attached tests. Thus, the modification to the steam baffle plate handles cited in the report vill to made.
- L
'... W W S Skibitsky Nuclear Licensing Engineer CC:
JGKeppler, USERC
(
)
)."n", ' " ' ' "
30 - AS*f NRO DISTRIBUTION cm PART 50 DOCKET MATERIAL T_:
FROO DATE cP occVMENT l
Consumers Power Company gfgj77 Mr. Samuel J. Chilk Jackson, Michigan DATER C t
W. S. Skibitsky gp j]
(LETTEa C NoyomizED P R oP INPUT PORM NUMBER oF COPIES RECElv50 25:CINAL
[f U NC LASSIF I E D QCoPr
/d/(,.o 60 3ESCRIPTIEN E NCLoSU RE Big Rock Point Core Spray Test Report-Single Nozzle Test and Development Program-
,'*,,i-August 1977 i
h)
I'
{?[
./
.p/t
,.i'
\\
(2-P)
(3/ 4")
i PLANT NIO!E:
Big Rock Point RJL 8/15/77 h6M SAFETY FOR ACTION /INFORMATION BRANCH CHIEF: (7) 3..DAVlS I
l 1
8 f
~~%
INTERNAL DISTRIBUTION I
I d EG FILE j NHv rsh ICE (2) t OELD HANAUER CHECK STELLO l
EISENHUT i
SHA0 BAER BUTLER GRIMES i
J. COLLINS O
S. CH//.K l
l I
I EXTERN AL DISTRIBUTION CONTROL NUMBER I
ILPDR: MAflL&t2IX f)/ Y.
(-'
(
O.
s C
16 CYS ACFS SENT CATEGORY 8 i