MONTHYEARML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs ML20197A8421997-12-12012 December 1997 Proposed Tech Specs Re Establishment of Alternate Repair Criteria for Outer Diameter Intergranular Attack in Upper Tubesheet of Unit 1 SGs ML20211C6441997-09-23023 September 1997 Proposed Tech Specs,Modifying RPS & ESFAS Trip Setpoint & Allowable Values for SG Low Pressure ML20211C8911997-09-23023 September 1997 Proposed Tech Specs Reducing Min Required Reactor Coolant Sys Flow Rate Requirements Until ANO-2 SGs Are Replaced ML20151J3371997-07-28028 July 1997 Proposed Tech Specs,Modifying Actions Associated W/Ts Table 3.3-1 for Reactor Protective Instrumentation & Table 3.3-3 for Esfa Sys Instrumentation ML20149K0551997-07-21021 July 1997 Proposed Tech Specs,Revising Surveillance Testing Requirements for Facility EFW Sys as Specified in Specification 4.7.1.2 ML20141C5641997-06-18018 June 1997 Proposed Tech Specs Changes Restoring Table 2 to Table II & Revision to One of Offsite Dose Calculation Manual, Pages Previously Submitted.Also Includes Amended Pages Modified to Amends Issued Since Change Request Submitted ML20141A8001997-05-0808 May 1997 Proposed Tech Specs 3/4.3.1 & 3/4.3.2 Requesting Removal of Reference to CE NPSD-576 ML20138H8521997-05-0202 May 1997 Proposed Tech Specs,Submitting Rev to Original TS Change Request to Reduce Limit Specified in Section 3.1.6.3.b for Leakage Through SG Tubes of Any One Sg,Per SG Tube Insp Surveillance Requirements ML20138D6411997-04-24024 April 1997 Proposed Tech Specs Revising Requirements for Sample Scope Initial Size & Expansion for Inservice Insp of Steam Generator Tube Sleeves ML20141H2621997-04-18018 April 1997 Proposed Tech Specs,Permitting Delay of Scheduled three-yr Inspections of Flywheels on All Four RCPs Until Completion of 2R13 Refueling Outage,Scheduled for Winter of 1998-99 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs 1999-09-07
[Table view] |
Text
'
O ANO-1 BASIS FOR CHANGE This Technical Specification change is required.as a result of the January 1,1981 reorganization of the Arkansas Power & Light Company's Energy Supply Ocpartment and the promotions of two executives. This -
Technical Specification change is totally administrative in nature and will have no effect on plant operations.
4 e
^
8202 0 sa 261 - ._
55
$( -
ARKANSAS POWER & LIGHT COMPANY ARKANSAS NUCLEAR ONE E
U
}
SENIOR VICE PRESIDENT ENERGY SUPPLY SAFETY REVIEW COMMITTEE i i i l l I l
DIRECTOR DIRECTOR ASSISTANT DIRECTOR DIRECTOR DIRECTOR DIRECTOR GENERATION FOSSIL VICE-PRESIDENT GENERATION PROJECTS TECHNICAL & ADMINISTRATION TECHNOLOGY OPERATIONS NUCLEAR ENGINEERING MANAGEMENT
' ENVIRONMENTAL SERVICES &
OPERATIONS
- SERVICES PROJECT SUPPORT I
E
~
GENERAL MANAGER - PLANT E! SAFETY gj OMMITTEE
!5 Figure 6.2-1 Management Organization Chart C
- g. Review of facility operations to detect potential nuclear safety hazards.
- h. Performance of special reviews, investigations and reports thereon as requested by the General Manager.
- i. Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the General Manager.
J. Review of the Emergency Plan and implementing pro-cedures and shall submit recommended changes to the General Manager.
AUTHORITY 6.5.1.7.1 The Plant Safety Committee shall:
- a. Recommend to the General Manag'er written approval or disapproval of items considered under 6.5.1.6(a) '
through (d) above.
1
- b. Render determinations in writing with regard to whether or not each item considered under 6.S.I.6(a) through (e) above constitutes an unreviewed safety question.
- c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Assistant Vice-President, Nuclear Operations and the Saf-ty Review Con.mittee of disagreement between the PSC and the General Manager; however, the General Manager shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.
RECORDS 6.5.1.8 The Plant Safety Committee shall maintain written minutes of each PSC meeting that, at a minimum, document the results of all PSC activities performed under the responsibility and authority provisions of these technical specifications.
Copies shall be provided to the General Manager and Chairman of the Safety Review Committee.
6.5.2 Safety Review Committee (SRC)
FUNCTION 6.5.2.1 The Safety Review Committee shall function to provide in-dependent review and audit of designated activities in the areas of:
- a. nuclear power plant operations
- b. nuclear engieeering
- c. chemistry and radiochemistry 122
- - - . _ - . . - . - - .- - _ - _ - _ - - _ - _ _ _ . - . . . _ _ _ - - - _ _ . . . - . - _ . . . - - _ . - . . . - - - - . . . - ~ . - _ . , - _ - _ _ . _ _ - - . - _ - - - . . . - - . . _ . _ - - - . - - - . . _ - . _ _
f
- d. metallurgy
- e. instrumentation and control
- f. radiological safety
- g. mechanical and electrical engineering
- h. quality assurance practices COMPOSITION 6.5.2.2- The SRC shall be composed of the:
Chairman: Director, Technical and Environmental Services Member: Assistant Vice-President, Nuclear Operations Member: Director, Generation Technology Member: Manager, Quality Assurance Member: Arkansas Nuclear One Plant Safety Committee Chairman Member: Manager, Technical Analysis Member: Arkansas Nuclear One Plant Analysis Superintendent Member: Director, Generation Engineering Member: Manager, Electrical Engineering Member: Manager of System Nuclear Operations
- The Chairman shall designate in writing the alternate chairman in the absence of the SRC Chairman.
ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the SRC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting mem-bers in SRC activities at any one time.
CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the SRC Chairman to provide expert advice to the SRC.
MEETING FREQUENCY 6.5.2.5 The SRC shall meet at least once per calendar quarter during the initial year of facility operation following fuel loa--
ding and at least once per six months thereafter.
QUORUM 6.5.2.6 The minimum quorum of the SRC necessary for the performance of the SRC review and audit functions of these technical specifications shall consist of the Chairman or his desig-nated alternate and at least 4 SRC members including alter-nates. No more than a minority.of the quorum shall have line responsibility for operation of the. unit.
- Middle South Services 123- _. .-- . -
- d. The Facility Emergency Plan and implementing procedures at least once per two years.
- e. The Facility Fire Protection Program and implementing precedures at least once per two years.
- f. The Facility Security Plan and implementing procedures at least once per two years.
- g. Any other area of facility operation considered appro-priate by the SRC or the Senior Vice President, Energy Supply (SRVP, ES).
- h. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified off-site licen-see personnel or an outside fire protection firm.
AUTHORITY 6.5.2.9 The SRC shall report to and advise the Senior Vice President, Energy Supply, (SRVP, ES) on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.
i RECORDS 6.5.2.10 Records of SRC activities shall be prepared, approved and distributed as indicated below:
- a. Minutes of each SRC meeting shall be prepared, approved and forwarded to the Senior Vice President, Energy Supply (SRVP, ES) within 14 days following each meeting.
- b. Reports of reviews encompassed by Section 6.5.2.7 above shall be prepared, gpproved and forwarded to the Senior Vice President,' Energy Supply (SRVP, ES) within 14 days following completion of the review.
. c. Audit reports encompassed by Section 6.5.2.8 above shall be forwarded to the Senior Vice President, Energy Supply, (SRVP, ES) and to the management positions responsible for the areas audited within 30 days after completion of the audit.
125
i 6.6 REPORTABLE OCCURRENCE ACTION 6.6.1 The following actions shall be taken for Reportable
- Gecurrences
- ,
- a. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.12.
- b. Each Reportable Occurrence requiring 24-hour
+
notification to the Commission shall be reviewed by the PSC and submitted to the SRC and the Assistant Vice-President, Nuclear Operations by the General Manager.
6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:
i e
1 i
1 i
e e
4 i
a
~
126
5.0 ADMINISTRATIVE CONTROLS 5.1 Responsibility Corporate responsibility for implementation of the Environmental Technical Specifications, and for assuring that station operations are controlled to provide protec-tion for the environment has been assigned to the Senior Vice President, Energy Supply. ,
The ANO General Manager, through the Engineering and Tech-nical Support Manager, and Technical Analysis Superintendent shall be responsible for compliance with the Environmental
- Technical Specifications at the plant level.
The Manager of Technical Analysis shall be responsible for radiological analysis of environmental samples.
5.2 Organization
- Figure 5-1 shows the organization chart at both plant and corporate levels relative to environmental matters.
5.3 Review 5.3.1 The Plant Safety Committee The Plant Safety Committee (PSC) shall be responsible for review of the following:
- a. Proposed changes to the Environmental Technical Specifications and the evaluated impact of the changes.
- b. Proposed written procedures, as described in Specification 5.5, and' proposed changes thereto which affect the plant's environmental impact.
5-1
SENIOR VICE PRESIDENT EftERGY SUPPLY I
I I ASSISTAtlT VICE PRESIDENT DIRECTOR l;UCLEAR OPERATIONS TECH!tICAL A!(D Ef1VIR0iiMEliTAL SERVICES ARKANSAS NUCLEAR Ot1E MANAGER GENERAL MANAGER TECHNICAL ANALYSIS ARKANSAS NUCLEAR Ot1E CHEMISTS ENGIiEERING AilD TECHNICAL SUPPORT AND MANAGER BIOLOGISTS ARKANSAS NUCLE.AR ONE TECHtilCAL ANALYSIS SUPERINTENDENT l
[ l I ARKANSAS NUCLEAR OriE ARKAliSAS NUCLEAR ONE ARKANSAS NUCLEAR ONE EIV R i ENT L "" " " "
SUPERVISOR SUPERVISOR SUPERVISOR ARKANSAS POWER & LIGHT C0. ENVIRONMErlTAL SURVEILLAf4CE FIGURE fl0.
ARKANSAS NUCLEAR ONE ORGANIZATION CHART S-1 5- 9 AMENDMENT NO. 47