Revised Tech Specs Reflecting 810101 Administrative Changes & Reorganization of Energy Supply Dept.Two Organization Charts Encl
ML19345E596
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/30/1981
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19345E588 List:
References
NUDOCS 8102050261
Download: ML19345E596 (8)


Text

'

O ANO-1 BASIS FOR CHANGE This Technical Specification change is required.as a result of the January 1,1981 reorganization of the Arkansas Power & Light Company's Energy Supply Ocpartment and the promotions of two executives. This -

Technical Specification change is totally administrative in nature and will have no effect on plant operations.

4 e

^

8202 0 sa 261 - ._

55

$( -

ARKANSAS POWER & LIGHT COMPANY ARKANSAS NUCLEAR ONE E

U

}

SENIOR VICE PRESIDENT ENERGY SUPPLY SAFETY REVIEW COMMITTEE i i i l l I l

DIRECTOR DIRECTOR ASSISTANT DIRECTOR DIRECTOR DIRECTOR DIRECTOR GENERATION FOSSIL VICE-PRESIDENT GENERATION PROJECTS TECHNICAL & ADMINISTRATION TECHNOLOGY OPERATIONS NUCLEAR ENGINEERING MANAGEMENT

' ENVIRONMENTAL SERVICES &

OPERATIONS

  • SERVICES PROJECT SUPPORT I

E

~

GENERAL MANAGER - PLANT E! SAFETY gj OMMITTEE

!5 Figure 6.2-1 Management Organization Chart C

g. Review of facility operations to detect potential nuclear safety hazards.
h. Performance of special reviews, investigations and reports thereon as requested by the General Manager.
i. Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the General Manager.

J. Review of the Emergency Plan and implementing pro-cedures and shall submit recommended changes to the General Manager.

AUTHORITY 6.5.1.7.1 The Plant Safety Committee shall:

a. Recommend to the General Manag'er written approval or disapproval of items considered under 6.5.1.6(a) '

through (d) above.

1

b. Render determinations in writing with regard to whether or not each item considered under 6.S.I.6(a) through (e) above constitutes an unreviewed safety question.
c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Assistant Vice-President, Nuclear Operations and the Saf-ty Review Con.mittee of disagreement between the PSC and the General Manager; however, the General Manager shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.

RECORDS 6.5.1.8 The Plant Safety Committee shall maintain written minutes of each PSC meeting that, at a minimum, document the results of all PSC activities performed under the responsibility and authority provisions of these technical specifications.

Copies shall be provided to the General Manager and Chairman of the Safety Review Committee.

6.5.2 Safety Review Committee (SRC)

FUNCTION 6.5.2.1 The Safety Review Committee shall function to provide in-dependent review and audit of designated activities in the areas of:

a. nuclear power plant operations
b. nuclear engieeering
c. chemistry and radiochemistry 122

- - - . _ - . . - . - - .- - _ - _ - _ - - _ - _ _ _ . - . . . _ _ _ - - - _ _ . . . - . - _ . . . - - _ . - . . . - - - - . . . - ~ . - _ . , - _ - _ _ . _ _ - - . - _ - - - . . . - - . . _ . _ - - - . - - - . . _ - . _ _

f

d. metallurgy
e. instrumentation and control
f. radiological safety
g. mechanical and electrical engineering
h. quality assurance practices COMPOSITION 6.5.2.2- The SRC shall be composed of the:

Chairman: Director, Technical and Environmental Services Member: Assistant Vice-President, Nuclear Operations Member: Director, Generation Technology Member: Manager, Quality Assurance Member: Arkansas Nuclear One Plant Safety Committee Chairman Member: Manager, Technical Analysis Member: Arkansas Nuclear One Plant Analysis Superintendent Member: Director, Generation Engineering Member: Manager, Electrical Engineering Member: Manager of System Nuclear Operations

  • The Chairman shall designate in writing the alternate chairman in the absence of the SRC Chairman.

ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the SRC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting mem-bers in SRC activities at any one time.

CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the SRC Chairman to provide expert advice to the SRC.

MEETING FREQUENCY 6.5.2.5 The SRC shall meet at least once per calendar quarter during the initial year of facility operation following fuel loa--

ding and at least once per six months thereafter.

QUORUM 6.5.2.6 The minimum quorum of the SRC necessary for the performance of the SRC review and audit functions of these technical specifications shall consist of the Chairman or his desig-nated alternate and at least 4 SRC members including alter-nates. No more than a minority.of the quorum shall have line responsibility for operation of the. unit.

  • Middle South Services 123- _. .-- . -
d. The Facility Emergency Plan and implementing procedures at least once per two years.
e. The Facility Fire Protection Program and implementing precedures at least once per two years.
f. The Facility Security Plan and implementing procedures at least once per two years.
g. Any other area of facility operation considered appro-priate by the SRC or the Senior Vice President, Energy Supply (SRVP, ES).
h. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified off-site licen-see personnel or an outside fire protection firm.

AUTHORITY 6.5.2.9 The SRC shall report to and advise the Senior Vice President, Energy Supply, (SRVP, ES) on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.

i RECORDS 6.5.2.10 Records of SRC activities shall be prepared, approved and distributed as indicated below:

a. Minutes of each SRC meeting shall be prepared, approved and forwarded to the Senior Vice President, Energy Supply (SRVP, ES) within 14 days following each meeting.
b. Reports of reviews encompassed by Section 6.5.2.7 above shall be prepared, gpproved and forwarded to the Senior Vice President,' Energy Supply (SRVP, ES) within 14 days following completion of the review.

. c. Audit reports encompassed by Section 6.5.2.8 above shall be forwarded to the Senior Vice President, Energy Supply, (SRVP, ES) and to the management positions responsible for the areas audited within 30 days after completion of the audit.

125

i 6.6 REPORTABLE OCCURRENCE ACTION 6.6.1 The following actions shall be taken for Reportable

Gecurrences
,
a. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.12.
b. Each Reportable Occurrence requiring 24-hour

+

notification to the Commission shall be reviewed by the PSC and submitted to the SRC and the Assistant Vice-President, Nuclear Operations by the General Manager.

6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:

i e

1 i

1 i

e e

4 i

a

~

126

5.0 ADMINISTRATIVE CONTROLS 5.1 Responsibility Corporate responsibility for implementation of the Environmental Technical Specifications, and for assuring that station operations are controlled to provide protec-tion for the environment has been assigned to the Senior Vice President, Energy Supply. ,

The ANO General Manager, through the Engineering and Tech-nical Support Manager, and Technical Analysis Superintendent shall be responsible for compliance with the Environmental

  • Technical Specifications at the plant level.

The Manager of Technical Analysis shall be responsible for radiological analysis of environmental samples.

5.2 Organization

Figure 5-1 shows the organization chart at both plant and corporate levels relative to environmental matters.

5.3 Review 5.3.1 The Plant Safety Committee The Plant Safety Committee (PSC) shall be responsible for review of the following:

a. Proposed changes to the Environmental Technical Specifications and the evaluated impact of the changes.
b. Proposed written procedures, as described in Specification 5.5, and' proposed changes thereto which affect the plant's environmental impact.

5-1

SENIOR VICE PRESIDENT EftERGY SUPPLY I

I I ASSISTAtlT VICE PRESIDENT DIRECTOR l;UCLEAR OPERATIONS TECH!tICAL A!(D Ef1VIR0iiMEliTAL SERVICES ARKANSAS NUCLEAR Ot1E MANAGER GENERAL MANAGER TECHNICAL ANALYSIS ARKANSAS NUCLEAR Ot1E CHEMISTS ENGIiEERING AilD TECHNICAL SUPPORT AND MANAGER BIOLOGISTS ARKANSAS NUCLE.AR ONE TECHtilCAL ANALYSIS SUPERINTENDENT l

[ l I ARKANSAS NUCLEAR OriE ARKAliSAS NUCLEAR ONE ARKANSAS NUCLEAR ONE EIV R i ENT L "" " " "

SUPERVISOR SUPERVISOR SUPERVISOR ARKANSAS POWER & LIGHT C0. ENVIRONMErlTAL SURVEILLAf4CE FIGURE fl0.

ARKANSAS NUCLEAR ONE ORGANIZATION CHART S-1 5- 9 AMENDMENT NO. 47