Forwards IE Insp Repts 50-245/80-17 & 50-336/80-19 on 800907-1004.No Noncompliance Noted
ML19345D923
Person / Time
Site: Millstone  
Issue date: 10/29/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19345D925 List:
References
NUDOCS 8012220071
Download: ML19345D923 (2)


See also: IR 05000245/1980017

Text

___

'

-f%,

.

.

4

UNITED STATES

8

k

NUCLEAR REGULATORY COMMISSION

L

j

REGION I

o

631 PARK AVENUE

g ***I* * ,@g

g

KING OF PRUSSIA, PENNSYLVANIA 19406

OCT 2 91980

Docket Nos. 50-245

50-336

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Combined Inspection 50-245/30-17 and 50-336/80-19

This refers to the inspection conducted by Mr. J. Shedlosky of this office on

September 7 through October 4,1980 at the Millstone Nuclear Power Station,

Waterford, Connecticut, of activities authorized by NRC License Nos. DPR-21

and DPR-65 and to the discussions cf our findings held by Mr. Shedlosky with

Mr. Mroczka and other members of your staff periodically during the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Dublic Document Room.

If this report contains

any information that you (or your contractor) believe to ba proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

i

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.

The infonnation sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

i

S012220 01 \\

.

. - .

..

. -

-

- - .

-

-.

.

- ..

.-

.

.

,

9

0

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

f

_

>

do

J. Brunner, Chief

Rea tor Operations and Nuclear

S port Branch

Enclosure: Office of Inspection and Enforcement Combined

Inspection Report Number 50-245/80-17 and 50-336/80-19

cc w/ encl:

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

.

^+7

w

    1. r-n-y

ga.p

-p<-+m

---

.-ar-+-t

,m,

tw--

y

9e

we.

--m9-.

g.

m-w-9we-L

+-

-' ---

+w'-

-~+=-e-a

se