Text
___
'
-f%,
.
.
4
UNITED STATES
8
k
NUCLEAR REGULATORY COMMISSION
L
j
REGION I
o
631 PARK AVENUE
g ***I* * ,@g
g
KING OF PRUSSIA, PENNSYLVANIA 19406
OCT 2 91980
Docket Nos. 50-245
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Combined Inspection 50-245/30-17 and 50-336/80-19
This refers to the inspection conducted by Mr. J. Shedlosky of this office on
September 7 through October 4,1980 at the Millstone Nuclear Power Station,
Waterford, Connecticut, of activities authorized by NRC License Nos. DPR-21
and DPR-65 and to the discussions cf our findings held by Mr. Shedlosky with
Mr. Mroczka and other members of your staff periodically during the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Dublic Document Room.
If this report contains
any information that you (or your contractor) believe to ba proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
i
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.
The infonnation sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
i
S012220 01 \\
.
. - .
..
. -
-
- - .
-
-.
.
- ..
.-
.
.
,
9
0
Northeast Nuclear Energy Company
2
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
- f
_
>
do
J. Brunner, Chief
Rea tor Operations and Nuclear
S port Branch
Enclosure: Office of Inspection and Enforcement Combined
Inspection Report Number 50-245/80-17 and 50-336/80-19
cc w/ encl:
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
.