O OPERATING DATA REPORT DOCKET NO. 50-3 3 3 DATE DECEMBER 1980 COMPLETED BY E. ZUFELT TELEPHONE ( 216 ) ? h 2-3840 OPERATING STATUS Fit:: Patrick Notes
- 1. Unit Name:
- 2. Reporting Period:
801101-8011JO 2430
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
883
- 5. Design Electrical Rating (Net MWe):
821
- 6. Maximum Dependable Capacity (Gross MWe): 870 810
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restric! ions.If Any:
This Month Yr.-to-Data Cumulative 720 8040 46873
!I. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 720 5539.8 72170
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 720 5420.8 31158.8
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gruss Thermal Energy Generated (MWH) 17h7216 1127o608 62327802
- 17. Gross Electrical Energy Generated (MWH) 608850 1861200 2121h000
- 18. Net Electrical Energy Generated (MWH) 590000 3739280 20529855
- 19. Unit Service Factor 100%
67.4%
66.M 20 Unit Availability Factor 100%
67.4%
66.5%
101.2%
Sc.1%
59.%
- 21. Unit Capacity Factor (Using MDC Net) 99.o%
5o.6%
53.3g
- 22. Unit Capecity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0 ",
uq
,A,g
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Scheduled Sne.bher Tnsrection and Mnintannnna Out wa in 7,nnn*7 1981 For Arr-oximately 10 Days.
- 25. If Shut Down At End Of Report Period. Fstimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION If D 12160$M4
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.
50-333 UNIT JAFNPP DECEMBER DATE COMPLETED BY TELEPHONE (315)342-3800 NOVEMBER 1980 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE C.48LY POWER LEVEL (htWe Nc0 (MWe-Net) 822 823 37 2
821 is 822 3
814 19 822 4
819 20.
823 818
' 21 820 5
6 821 22 821 7
820 23 821 818 321 s
24 823 822 73 822 821 10 26 11 821 27 822 822 821 12 28 13 822 827 2,
g4 821 768 30 is 821 3:
822 l
SUMMARY
Unit operated at 100% rated thermal power for this reporting period with no outages or reductions.
l 4
p g.
-,-n- -., -,
},.
l l
No N
S:
n o
e SF t
o hr ec de ud el d
D at e
2 W;g, -
lG F E D C. B.AR l- - - - -
- e OOAORRMEa tp dp ee aqs heneg fiu o er ur u u n i n.
e tp r a a
l
( t nt ail ennm
$3$
Eoti ot i s r o ae x nr rg pl a a Ty nn Ig?
ct a
i r lt a e
iEv iR F
) r ene oa nr is fi r
g i Tul o
nt r 5j3 r
e e
&ct s
(
E i
t(
o E
Ln m
x pl ci pl jjy.
U e
ai n
a n
)
e ni ggY N
s
)
6g 53E.e E
IT xa S
mi R
i l
n U
E at R
L O
D i
P T
o e Eci R
O n
p v oe
,t T
W r nt w M
N t
S a
e ON A
T N
1 D
3 1
P N
O 4321M mg E O
W OAMMe O?g V
E t
t uaah E
R ht nno eo uud f
R 4
r maa.
B F
(
ll Eat S E
D xic gE E
R U
pc r
lSa C
icm O."
a T
1 I
nra.
9 O
)
m 8
N 0
S 5
4 CO P
C M
D r
E 0EEfE e
a T
o v
u E P U O x
1 vn x
e L
N C r
n^s L
h 6et l
e E
b 1nr Pu I
P T T K t
- E i
t y r b R"&
i
)
ei E
t R Sp t H E D N T u"C ehaG ec o
O D I
A A per N
'r N8TM r
ea -
S ot t I r
EYEE.O "ce r si r
a t
on e
m fns n
t
(
o e
Lr ort c
i v
S E
u e
e EDd 5
Lfct 3
(
o RiDi c
EA 0
u
)
r ea o 1
F c
Fnt n E'
a e
is s
5 2
3 I
I le M P 3
e e
)
U I
N 3
PB P
3 4 EE U
R 2 LH E
T.
G.
2 1
4 9
0 8 0
- s
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NOVEMBER, 19P0 During this reporting period, the unit operated at 100%
rated thermal power, 845-850 MWe gross, resulting in the highest monthly generation achieved at FitzPatrick to date.
i POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT l
SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE
SUMMARY
t WORK REQlEST#
REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME g,
HOURS 16 OCT 10 8394 Operations
%ne Valve disassembled, internal conditions 48 RilR-42A satisfactory, seat G disc inspected.
No problem located.
27 OCT 24 9186/11643 Operations Improper Operation Repaired latch mechanism and interlock 8
Track Bay solenoid of Reactor Building Track Doors Bay Doors.
7 NOV 10 10237 Operations Worn Packing Adjusted packing - checked motor 6
MOV-26B current 7 NOV 27 11645 Visual None. Suspected counter SSS had Operations check valve setpoint 2
VB-4 weights set wrong.
per ST.
12 NOV 93 8039 Operations I, caking relief valve -
Replaced valve 2
RV-101D weakened spring, dirty seat.
t
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCF.
SUMMARY
NOVEMBER 1480 T&C "E "ES A E CO PONENT LFUNC ON MAL C ION 0
DATE SYSTEM HOW DETECTED p
N S
11/7 02-3 9152 OPS N/A Poor response Performed ISP-2.0 L1-USA 3-5 satisfactor /
11/3 03 11431 OPS N/A Had to be bypas-Found 3.0 t
RPI sed for S/U satisfactory 11/17 06 10195 I&C Valve manifold Unable to Used rack valve.110.0 LT-52c age /use calibrate LT for isolation WHFT; uritton 9/24 07 8189 OPS Unknown Drifting Ran I-V Curve &
1.0 LPRM 04-29B performed IMP 7 ??
OPS Drifting High output N/A 1.0 10/27 07 9357 LPRM 12-37B 10/27 07 11555 OPS Low level B Had to be Returned to 0.0 APRM "D" LPRM's input bypassed service after testine l?-77B 11/14 07 9228 OPS Unknown Drifting Performed IMP 4.0 LPRM 28-45A returr.ed to cervice 11/14 07 9360 OPS Unknown Drifting Performed IMP 4.0 LPRM 44-29B returned t o 2ntvica 11/14 07 11536 OPS Unknown Drifting Performed IMP 4.0 LPRM 12-37D returne' to nor v1 <
11/14 07 11649 OPS Unknown Drifting
< m uino 11/19 07 11602 OPS Age /use Plotter not Cleaned /
5.0 TIP "A"
working adjusted switch
POWER AUTHORITY OF THE STATE OF NE V YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE 5UMMARY MOVFynFR 198n TtC ACTION TAKEN REPAIR WORK REQUEST #
CAUSE OF RESULTS OF COMPONENT #
MALFUNCTION MALFUNCTION TO PRECLUDE TIME DATE SYSTEM H
DUEMED RECURRENCE HOURS 11/25 07 10351 OPS Unknown Drifting IMP 7.22 2.0 LPRM 20-21A Returned to nervice 11/.;
07 10352 OPS Unknown Drifting IMP 7.22 P.0 LPRM 36-45B Returned to servien 11/14 13 10193 C&C N/A N/A Repair spare 2.0 h50kNN SNfN h 11/7 16 11646 JPS Unknown Low Nitrogen Recharged 10.0 X-104D pressure Y_1nR_ 1060 11/10 17 9240 3PS Unknown N/A Performed 30 RM-251D ISP-64-1 11/10 17 11529 I&C Age Out of Replaced unit 30.0 RM-150B tolerance calibrated 11/12 17 11606 JPS Use Readings Calibrated d.0 TB Vent flow high returned to nervino 11/14 17 11612 RES N/A Readings not Performed ISP-5.0 RM-150 A/B the same 19 results met-enntnr7 8
11/25 17 5418 OPS Use Sample not Replaced sample ?2.0 working valve RM-460 11/25 17 10425 3PS Use li-Hi pot Adjusted pot 2.0 RM-350 stuck 12/6 17 10461 OPS Age /Use Constant alarm Replaced /
18.0 RM-351 repaired pre-amn l
I
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
NOVEMBER 1980 T&C ACTION TAKEN REPAIR WORK REQUEST #
CAUSE OF RESULTS OF COMPONENT #
MALFUNCTION MALFUNCTION TO PRECLUDE TIME DATE SYSTEM H
DUECTED RECURRENCE HOURS Performed ISP-4.0 11/3 70 11560 RES N/A No indication DPIS-107A4 antis fac tory 11/3 70 11561
~
RES N/A No indication Performed ISP-DP1S-107B4 '~
3atisfactory 4.0 11/3 76 11552 OPS Low motor volt-Timer not func-Adjusted motor 8.0 CO -PNL-5 age, motor run-tioning properly '/oltage & cams 2
ninc slow 11/3 76 11604 OPS Low motor volt-Alarm bell 1djusted motor 12.0 CO -PNL-3 age, motor run-timers not foltage & cams 2
ninc slow 2orrect 11/19 92 9224 OPS Loose lead leater not Pightened lead /
6.0 UH 3B/3D 3perating
- hecked ok 11/24 93 5314 I&C Test equipment
'l/A Jalibrated 10.0 PS-3A/3B found out of calibration i
m
,