ML19345D666

From kanterella
Jump to navigation Jump to search
Submits Interim Rept in Response to IE Bulletin 79-17, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. Six Welds Remain on Repair/Replacement List & Will Be Completed by End of Yr
ML19345D666
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/12/1980
From: Hukill H
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
IEB-79-17, TLL-622, NUDOCS 8012160446
Download: ML19345D666 (2)


Text

-

Metropolitan Edison Company Post Office Box 480 g

Middletown. Pennsylvania 17057 717 944-4041 Writer's Direct Dial Numcer December 12, 1980 TLL 622 Office of Nuclear Reactor Regulation N

Attn:

R. W.

Reid, Chief 7

Operating kcactors Branch No. 4 U.S. Nuclear Regulatory Comission b.3, Washington, D.C.

20555

4 g

v:

Dear Sir:

0 t.a Three ! file Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 IGSCC Investigation / Bulletin 79-17 Our previous response, submitted October 14, 1980 (TLL 514), stated an interim report would be submitted by November 14, 1980 listing the welds with required corrective 2ctions completed from the IGSCC repair program submitted previously.

To date, six (6) welds remain on the repair / replacement list.

It is anticipated that these welds will be completed by the end of the year. Attached is a summary of corrective actions completed to date.

Sincerely,

. D.

ukill Director, TMI-l HDH: DCD: hh Attachment ec:

B. H. Crier H. Silver D. DiIanni J. T. Collins B. J. Snyder M

O

'st l Metroco'. tan Ecson Compancs a Memtwr of the General Puohc Utit'es System 8012160 %

Q

attachment TLL Interim summary TMI-l Intergranular Stress Corrosion Cracking (ICSCC)

Investigation / Corrective Actions, November 21. 1980.

s No. of Welds Welds Renairs Pending

  • Deleted Spent Fuel 12 6

7 Make Up 0

0 1

Building Spray 3

0 5

Decay Heat 8

0 2

BWST Suction **

O O

1 Total 23 6

16

  • Deletions based upon nondestructive examinations / reinvestigations discussed at on-site meeting with NRR 4/17/80. Deleted welds will be included in the surveillance program discussed in our previous submittal March 31, 1980 (TLL 136).
    • Weld identified M-40 in original list.