Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station BVY-98-068, Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station BVY-98-053, Monthly Statistical Rept for Mar 1998 for Vynp1998-03-31031 March 1998 Monthly Statistical Rept for Mar 1998 for Vynp ML20248L1581998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Vermont Yankee Nuclear Power Station ML20217M7801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Vynp Station ML20198L6111997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Vynp Station BVY-97-161, Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station BVY-97-145, Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station BVY-97-126, Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station BVY-97-111, Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station BVY-97-098, Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station BVY-97-088, Monthly Operating Rept for June 1997 for Nynps1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Nynps BVY-97-074, Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station BVY-97-059, Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station BVY-97-042, Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station BVY-97-033, Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station BVY-97-021, Monthly Operating Rept for Jan 1997 for VYNPS1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for VYNPS BVY-97-001, Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station BVY-96-154, Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station BVY-96-138, Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station BVY-96-114, Monthly Operating Rept for Sept 1996 for Vynp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Vynp BVY-96-103, Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station BVY-96-095, Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station1996-07-31031 July 1996 Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station BVY-96-087, Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station BVY-96-072, Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station BVY-96-057, Monthly Operating Rept for Apr 1996 for VT Yankee Power Station1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for VT Yankee Power Station BVY-96-041, Monthly Operating Rept for Mar 1996 for Vynp1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Vynp BVY-96-018, Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station1996-02-29029 February 1996 Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station BVY-96-009, Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station BVY-96-001, Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station ML20095F6601995-11-30030 November 1995 Last Page of Monthly Operating Rept for Nov 1995 for Vermont Yankee BVY-95-131, Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station BVY-95-118, Monthly Operating Rept for Oct 1995 for Vynp1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Vynp BVY-95-106, Monthly Operating Rept for Sept 1995 for Vynp1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Vynp ML20092F5901995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Vermont Yankee Nuclear Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
O VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 80-11 FOR THE MONTH OF NOVEMBER , 1980 l
l l
1 8012160fdA
OPERATING DATA REPCRT DOCKET NO. 50-271 DATE 801209 COMPLETED ST D. Bernard I
TELEPHONE 617-366-8811, X2215 OPERATING STATUS Notes
- 1. Unit Name: Vermont Yankee
- 2. Reporting Period: November
- 3. Licensed Thermal Power (Wt): 1593
- 4. Nameplace Racing (Gross We): 540
- 5. Design Electrical Racing (Net We): 514(open)SO4(closed)
- 6. May h nm Dependable Capacity (Gross We): 535
- 7. Wmma Dependable Capacity (Net We): 504
- 3. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
- 9. ?over Level to Which Restricted,If Any(Net We):
- 10. Reasons For Restrictions, If Any:
This Month Tr-to-Date Cumulative
- 11. Hours In Reporting Period 720.00 8040.00 -
- 12. Nu=ber Of Hours Re.'ctor Was Critical 0.00 6266.89 57425.28
- 13. Reactor Reserve Shut town Hours 0.00 0.00 0.00 ,
- 14. Hours Generator On-Lit.S 0.00 6200.10 55527.88
- 15. Unit Reserve Shutdown Riurs 0.00 0,00 0,00
- 16. Cross Thernal Energy Gens raced (WE) 0.00 9347971.00 78572584.00 i 17. Gross Electrical Energy G6'erated(WH) 0.00 3136006.00 26105676.00 i
- 18. Net Electrical Energy Generc ed(W R) 0.00 2972808.00 24741173.00
- 19. Unit Service Factor 0.00 77.12 77.30
- 20. Unic Availability Factor 0.00 77.12 77.30 ,_
l 21. Unit Capacity Factor (Using MDC Net) 0.00 73.36 68.34
- 22. Unit Capacity Factor (Using DER Net) 0.00 71.94 67.01
- 23. Unit Forced Cutage Rate 100.00 4.31 6.28
- 24. Shut:fowr.s Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling in progress.
l l
- 25. If Shut Down At End Of Re. port Period, Esti=ated Date of Startup: Late December j 26. Units In Test Status (?rior to Cc:mnercial Operation): Forecast Achieved l
INITIAL CRITICALITY I
INITIAL ELECTRICITY COMMERCIAL OPERATION 1
l l
AVERAGE DAILY UNIT POWER LEYEL
~
DOCKET NO. 50-271 UNIT Vermont Yankee DATE ,.jp COMPLETED BY F.J. . ger TELEPHONE 802-257-7711.X137 MONTH vov mher DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P0hTR L3'IL (MWe-Net) (MWe-Net)
- 1. 0 17. n
- 2. 0 18. 0
- 3. 0 19. o
- 4. 0 20. 0
- 5. 0 21. 0
> 6. 0 22. 0
- 7. 0 23, o
- 8. 0 24. 0 0 25. 0 9.
0 26. 0 10.
0 27. 0 11.
0 28. 0 12.
- 13. 0 29. n
- 14. 0 30. n
- 15. 0 31.
- 16. O INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting :onth. Compute to the nearest whole megawatt.
1 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO 50 271 UNIT NAME Vermont Yankee j REPORT HONTH November '
COMPIETE B F Bur g TELEPIM)NE _ 802-257-7711,X137 j
i 07 m % ** o N Cause & Corrective No. Date g g g fg License g4 htion to IH 8 Re rtl "* " *" ""
- r: u O - - - -
80-21 800926 S 720 C 1 N/A RC FUElXX N/A 80-22 801124 F 162 A* 4* 80-37/IT CG PIPEXX The pipe cracking is believed to have been i
caus<d by ICSCC. The Sweep-0-Let is under-
- sang a failure analysis to determine the cause of the cracking.
The Sweep-0-Let and piping are being replaced with materials which meet the 3
intent of Section II of NUREC 0313,Rev.1,
- dated October.1979.
i 4
)
i F: Forced Reason: Hethod: Exhthit G- Instructions S: Scheduled A-Equipment Failure (Explain) 1- Manual for Preparation of Data B-Haintenance or Test 2- Manual Scram Entry Sheets for I.icensee C-Refueling 3- Automatic Scram Event Report (I.ER) File D-Regulatory Restriction 4- Other (Explain) (NUREG 0161) 1 E-Operator Training & License Examination F-Administrative 5 Exhibit I - Same Source l G-Operational Error (Explain)
II-Other (Explain) i 7/80
DOCKET NO. 50-271 .
UNIT Vermont Yankee DATE 801209 COMPLETED BY F.J. Burger TELEPHONE 802-257-7711, X137 SAFETY RELATED MAINTENANCE ,
Page 1 of 3
- NATURE OF MALFUNCTION ER OR O WACE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Electrical Penetration Corrective N/A Worn Components Leakage Repaired By Vendor X101A MR 79-837 RilR Valves V10-34A Corrective N/A Set Point Drif t Valves Would Adjusted Torque Switch and 39A HR 80-352 , Not Go Fully Settings Shut Instrument Isolation Corrective N/A Worn Packing Leakage Repacked Valve Valve RV-12B MR 80-508 .
Contaliunent Atmosphere torrective N/A Worn "O" Rings Leakage Replaced "O" Rings Control Valve V16-20-20 , MR 80-975 MSIV 80-D Air Correctfve N/A Worn "0" Rings Air Leakage Replaced "O" Rings Pilot Valve Mk 80-1087 "B" Diesel Generator Corrective N/A Therraocouple Dirt in Selector Cleaned Switch
- 4 Cylinder Thu ocouple MR 80-1096 Switch Inoperable H.lR Service Water Corrective N/A Nonnal Operation Loose Nut, Tightened and Adjusted Pipe llanger 11-133 MR 80-1129 Excessive Hanger Movement IRM "C" Corrective N/A Failed Preamp Failed IRM Replaced Components MR 80-1145 e
DOCKET No. 50-271 UNIT Vermont Yankee DATE 801209 COMPLETED BY F.J. Burger TELEP110NE 802-257-7711, X137
[
SAFETY RELATED MAINTENANCE i
Page 2 of 3 NATURI: OF MALFUNCTION ER OR OW ACF.
EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION RPS/Analor, Trip System Corrective N/A Failed Component Failed Power Replaced Power Supply Power Supply 25-6A 32 MR 80-1152 Supply liCU 06-35 Corrective N/A Failed "0" Rings Leakage Replaced Accumulator MR 80-1172 Fuel Pool Coaling Corrective N/A Not Isolated During Needs Calibra- Calibrated Pressure Indicator MR 80-1173 Ilydro tion PI-69A
. I RilR lleat Exchanger Corrective N/A Failed Sasket Leakage Replaced Casket E-14-1A MR 80-1179 P,cactor Recircula*. ion Preventive N/A N/A N/A Repacked Valve V.lve V2-65A MR 80-1191 RCIC Valve V12-15 Corrective N/A Switch Broken N/A Replaced Switch Torque Switch MR 80 1197 While Preforming Maintenance on Valve Operator "B" Diesel Cencrator Corrective N/A Normal Operation / Faulty Indica- Repaired As Necessary Pyrometers #1 & #6 MR 80-1201 Vibration tion ;
t
.= - - .
DOCKET NO. 50-271 UNIT Vermont Yankee ,
DATE 801209 COMPLETED BY F. J. Burger TELEPHONE 802-257-7711, X137 SAFETY RELATED MAINTENANCE ,
Page 3 of 3 NATURE OF MALFUNCTION ER OR M AGE EQUIPsENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION "A" SBCT Corrective N/A Dirt High AP at Cleaned As Necessary MR 80-1211 Demister MSIV 80-D Corrsctive N/A Normal Operation Dry Bushings Lubricated Bushings MR 80-1216 "A" Diesel Generator Corrective N/A Worn Parts Air Leakage Replaced Valve Air Start System Relief MR 80-1218
~
Valve Service Air Valves Preventive N/A N/A N/A Disassembled and Cleaned V72-76 A & B, V72-78 A-D, MR 80-1222 Valves, Replaced Caskets V72-80 A-D, for the Diesel Generator Air Start System "A" & "C" RllR Service Corrective N/A Set Point Drift Leakage Disassembled & Cleaned Water Pump Relief Valves MR 80-1247 Valves, Replaced Parts as Necessary k
It e
DOCKET No. 50-271
.1 UNIT Ver:nont Yrnkee DATE 801209 COMPLETED BY F. J. Burger TELEPHONE 802-257-7711,X137 REPORT MONTH November
SUMMARY
OF OPERATING EXPERIENCES During the reporting period, the plant was shutdown for refueling and maintenance.
l I