400 Chestnut Street Tower II December 10, 1980
.2 EU
'A Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Licensing Branch No. 2 z
Division of Licensing
~
y U.S. Nuclear Regulatory Commission Washington, DC 20555 0
- -j
Dear Mr. Schwencer:
In the Matter of the Application of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 Your letter to H. G. Parris dated November 5, 1980, requested additional information on the Reactor Coolant System (RCS) Vent System which will be installed at Sequoyah Nuclear Plant. We consider the July 1, 1981, submit-tal date for design and analysis of the vent system as stated in NUREG-0737 to be applicable to both Sequoyah units 1 and 2.
Therefore, it is our intention to submit the RCS Vent System design and analysis and the response to your November 5, 1980, letter on or before July 1, 1981.
If you have any questions, please get in touch with D. L. Lambert at FTS 857-2581.
Very truly yours, TENNESSEE VALLEY AUTHORITY NN L. M. Mills, Manager Nuclear Regulation and Safety Sworn to and subscribed before me this
~ day of 1980
..-m Notary Public My Comission Expires -
Y post S ols 8012100M(
p
400 Chestnut Street Tower 3 December 10, 1980 4
n'l Dirtotor of Nuclear Reactor Regulation Attentions Mr. A. Schwenoer, Chief
=
Licensing Branch No. 2 M
u Division of Licensing u
U.S. Nuclear Regulatory Commission Washington, DC 20555 Dear Mr. Schweneers In the Hatter of the Application of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 Your letter to H. G. Parris dated November 5, 1980, requested additional information en the R uotor Coolant System (RC3) Vent System which will be installed at Sequoyah Nuclear Plant. We consider the July 1, 1981, submit-tal date for design and analysis of the vont system as stated in NUREG-0737 to to applicable to both Sequoyah units 1 and 2.
Therefore, it is our intention to submit the RC3 Yent Sy-tem design and analysis and the response to your November 5,1980, letter en or before July 1,1981.
If you have any questions, please get in touch with D. L. Lambert at FT3 857-2581.
Very truly yours, TENNESSEE VALLEY AUTHORITY
. s. u m s, er l
Nuclear Regulatica and Safety Sworn to and subscr3CM before as 1980 this_ ' day of
),
L'.
-n-:,,
notary Publio
^ i1 Hy Commission Expires
s 400 Chestnut Street Tower II December 10, 1980 Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 Dear Mr. Schwencer In the Hatter of the Application of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 Tour letter to H. G. Parris dated November 5,1980, requested additional information mi the Reactor Coolant System (RCS) Vent System which will be installed at Sequoyah Nuclear Plant. We consider the July 1, 1981, submit-tal date for design and analysis of the vent system as stated in NUREG-0737 to be applicable to both Sequoyah unita 1 and 2.
Therefore, it is our intention to submit the RCS Vent System design and analysis and the response to your November 5, 1980, letter on or before July 1, 1981.
If you have any questions, please get in touch with D. L. Lambert at FTS 857-2581.
Very truly yours, TENNESSEE VALLET AUTHORITT
. M. Mills, Manager Nuclear Regulation and Safety Sworn to and subscribed before me this I day of 1980
/