Summary of 801125 Meeting W/Util at Site Re Plans for Emergency Response Facilities.Viewgraphs Encl
ML19345D533
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/02/1980
From: Kintner L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19345D534 List:
References
NUDOCS 8012160014
Download: ML19345D533 (5)


Text

- -._.

. - -. ~... - _ _..-_

7 r (2 A l

i I

!pa arag 1

o, UNITED STATES j

E\\

'i NUCLEAR REGULATORY COMMISSION

,c4 j

j WASHINGTON D. C. 20555 O

)

\\..v,/

d n

t c 02 880 0

0 Docket No. 50-341 g

~

p
r. '+ 2

. F1 j

a f._j

~

APPLICANT:

Detroiz Edison Company N

1;

.9 i

G cA G

bs,:LITY:

Fermi 2 m

SUBJECT:

SUMMARY

OF NOVEMBER 25, 1980 MEETING REGARDING OPERATING i

LICENSE REVIEW 3

The purpose of the meeting was to hear and discuss applicant's plans for a

building emergency response facilities. is a list of attendees.

i Enclosura 2 is the agenda and a copy of slides used in the meeting.

The technical support center (TSC) will be built adjacent to the service building and separated from the control room by the turbine house and the service building (Enclosure 2, Pages 7, 8, 9). Access between control room and TSC is through these buildings and requires about 3 minutes. The staff i

said it was uncomfortable with the distance of the TSC from the control room because it may result in the emergency director and his principal assistants j

staying in the control room, rather than thE ISC.

NUREG-0696 states that the TSC shall be located in close proximity to the control.roon, preferably within l

the same building.

The information system for the technical support center (TSC) will provide some of the required information by closed-circuit television from existing control room displays (Enclosure 2, Pages 14,16). The staff expressed a strong preference that closed-circuit TV not be used for instrumentation "equired to follow the courseof an accident, such as that required for variables j

.isted in Regulatory Guide 1.97 Revision 2.

NUREG-0696 requires that signals for these variables be input into a data acquisition processor for the TSC l

and other emergency facilities.

4 There are two additional facilities to be used in emergency operations: the emergency operations facility (EOF) and the recovery center, both to be located in the same building.

(Enclosure 2, Pages 6, 27, 28, 29).

For a l

long term emergency, the top level utility manager, Vice President - Nuclear Operations, and NRC manager would be in the recovery center, and an E0F coordinator would be the working level manager in the E0F. The E0F would be designed for a radiation protection factor of 50; however, the recovery center would not.

If necessary, persons in the recovery center could go to the E0F.

No displays of data are planned for the E0F because it was stated that such unanalyzed data may be misleading to people not familiar with the systems (Enclosure 2, Page 17). The staff said that data display, similar to that provided for the TSC, should be provided to the EOF also.

0M'

.go1216 F

1980 The emert,ency operations facility and recovery center would be located on the site, about 3/4 of a mile from the reactor building (Enclosure 2, Page 5).

The building ch they are located would also contain a simulator, training facilities,

' ices (Enclosure 2, Pages 28, 29).

The applica it had completed a draft of the upgraded Fermi 2 emergency plar to cor

' NUREG-0654, " Criteria for Preparation and Evaluation of r

Radiologica

.ncy Response Plans and Preparedness in Support of Nuclear Power Plant.

.ne draft upgraded plan is currently being reviewed for approval by apprcpriate managers in Detroit Edison. The approved upgraded emergency plan will be submitted by the end of the first quarter of 1981.

The staff said that Revision 1 to NUREG-0654, which incorporates public comments, was issued and should be considered in the approved plan, although revisions are believed minor.

Staff also requested that a draft of the upgraded emergency plan be provided prior to submittal of the approved plan.

>)

4.R h.

L. L. Kintner, Project Manager Licensing Branch No. 2 Division of Licensing

Enclosures:

As stated cc w/ enclosures:

See next page

Dr. Wayne H. Jens Assistant Vice President Engineering & Construction OEC 0 Detroit Edison Company 2D 2000 Second Avenue Detroit, Micnigan 48226 cc:

Eugene B. Thomas, Jr., Esq.

David E. Howell, Esq.

LeBoeuf, Lamb, Leiby & MacRae 21916 John R 1333 New Hampshire Avenue, N. W.

Hazel Park, Michigan 48030 Washington, D. C.

20036 Peter A. Marquardt, Esq.

Co-Coun:el The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Mr. William J. Fahrner Project Manager - Ferni 2 The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Mr. Larry E. Schuerman Licensing Engineer - Fermi 2 Detroit Edison Company 2000 Second Avenue Datroit, Michigan 48226 Charles Bechhoefer, Esq., Chairman Atomic Safety & Licensing Board Panel U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. David R. Schink Department of Oceanography Texas A & M University College Station. Texas 77840 Mr. Frederick J. Shon Atomic Safety & Licensing Board Panel V. S. Nuclear Regulatory Commission Washington, D. C.

20555

ENCLOSURE 1 ATTENDEES NRC - DETROIT EDISON MEETING NOVEMBER 25, 1980 REGARDING EMERGENCY PLANNING NRC P. Psomas E. Williams, Jr.

S. Ramos P. Byron C. Woodhead B. Zalcman L. Kintner J. Levine L. Beltracchi DETROIT EDISON W. Holland P. Marquardt E. Madsen N. Ewbank L. Schuerman C. Lusi W. Street l

l l

l l

I i

/-

ENCLOSURE 2 2 g,j9fe FERMI 2 0:: SITE EMEkcE;;CY pESPO::SE PACILITIES PROPOSE 9 AGE::DA I.

Ov e r v i e w........................................ L. E. S c h u e r m a n II.

General Arrangement..............................W.M.

Street A.

Site B.

Buildings

-- Technical Support Center

-- Emergency Operations Facility

-- Other Buildings III.

Information Systems (for Emergency Facilities)

E.

Lusis A.

Emergency Information Systems B.

Control Roon Review C.

Safety Parameter Display System D.

TSC Information Systems

~

E.

EOF Information Systems F.

NDL G.

Data Acquisition Syctems H.

Nchedule for Computer I;etwork IV.

Emergency Plan...................................N.M.Ewbank i

A.

Emergency Organization and use of site facilities B.

TSC Operation C.

EOF Operation m'

,