Forwards IE Info Notice 80-42, Effect of Radiation on Hydraulic Snubber Fluid. No Response Required
ML19345D523
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/24/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8012160003
Download: ML19345D523 (1)


Text

-

s

  1. " % o,%

UNITED STATES 8

  • ' p,,,

NUCLEAR REGULATORY COMMISSION

~ -

g G?

^/8 REGloN IV k

-, a#

ARLINGTON. TEXAS 76011 8

611 RYAN PLAZA DRIVE. SUITE 1000 b,,,

In Reply Refer To:

November 24, 1980 RIV fi Docket Nos. 50-498/IE Informtion Notice No. 80-42 50-499/IE Infornation Notice No. 80-42 g

[,

E...

Houston Lighting & Power Company L-M' JQ ATTN: Mr. G. W. Oprea, Jr.

O R

E3 Executive Vice President fi C5 Post Office Box 1700 0

G o

Houston, Texas 77001 m

Gentlemen:

The enclosed IE Information Notice is provided as an early notification of a possibly significant matter.

Recipients of this notice should review the infor-

oation for possible applicability to their facilities.

However, no specific acthn ce response is requested at this time.

If further NRC evaluations 50 indicate, an IE Circular or Bulletin will be issued to recomend or request specific licensee actions.

If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely, 1

gap ~

/

Aarl V. Seyfri Director

Enclosures:

1.

IE Information Notice No. 80-42 2.

List of Recently Issued IE Infomation Notices 80121000M g

SSINS No.:

6835 Accession No.:

UNITED STATES 8008220261 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Information Notice No. 80-42 Date:

November 24, 1980 Page 1 of 2 EFFECT OF P.ADIATION ON HYDRAULIC SNUBBER FLUID Descriotion of Circumstances:

On August 7,1980, Florida Power Corporation (FPC) filed a report in accordance with 10 CFR Part 21 that identified an upper cervice limit of 10 Mrad (megarad) of radiation on the General Electric Versilube F-50 fluid that was provided in Anker-Holth shock suppressors mounted on the reactor coolant pumps.

This upper limit was obtained from the results of a study performed for FPC by Rensselaer Polytechnic Institute (RPI).

These results contained two items of prime importance to the operation of the suppressors.

The first result was a significant increase of the viscosity of the fluid to the extent that incipient gelation of the fluid occurred at exposures of approximately 50 Mrad.

The viscosity increased linearly for exposures up.to 20 Mrad and then increased exponentially for exposures greater than 20 Mrad.

The second result showed that hydrochloric acid (hcl) was formed in significant quantities when the fluid was. subjected to radiation.

The following table lists the dose irradiation time and hcl formed.

Dose Irradiation hcl Formed (Mrad)

Time (ppm) 0 2.78

1. 2 1 minute 70.3
5. 8 5 minutes 329.
5. 8 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> 335.

18.5 11.2 minuts:

555 50.3 15.2 minutes 1592 l

One of the recommendations by the RPI personnel was that the fluid be replaced before a limit of approximately 6 Mrads was reached.

FPC reported that the fluid in service at Crystal River No. 3 plant had absorbed doses ranging from 2.3 to 3.6 Mrads, these values were determined by comparing the viscosity of the fluid in service to that of the test samples at RPI.

The Technical Instruction Manual that is provided by the vendor for these suppressors contains a recommendation that 12.5 Mrads should be the maximum service life for Versilube F-50.

IE Information Notice No. 80-42 November 24, 1980 Page 2 of 2 This IE Information Notice is provided as an early notification of a possibly significant matter that is still under review by the NRC staff.

Recipients should review the information for possible applicability to their facilities.

No specific action or response is requested at this time.

If NRC evaluations so indicate, further licensee actions may be requested or required.

No written response to this IE Information Notice is required.

If you have any questiores regarding this matter, please contact the Director of the appropriate NRC Regional Office.

i l

l i

l-i

IE Information Notice No. 80-42 November 24, 1980 LISTING OF RECENTLY ISSL'ED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.

Issued 80-35 Leaking and Dislodged 10/10/80 All categories G and

)

Iodine-124 Implant Seeds G1 medical licensees 80-36 Failure of Steam 10/10/80 A"1 nuclear power Generator Support Bolting reactor facilities holding Operating Licensees (OLs) or Construction Permits (cps) 80-37 Containment Cooler Leaks 10/24/80 All nuclear power and Reactor Cavity facilities holding Flooding at Indian Point power reactor Operating Unit 2 Licenses (OLs) or Construction Permits (cps) 80-38 Cracking in Charging 10/30/80 All Pressurized Water Pump Casing Cladding Reactor Facilities holding power reactor Operating Licenses (0Ls) and Construction Permits (cps) 80-39 Malfunctions Of Solenoid 10/31/80 All light water reactor Valves Manufactured By facilities holding Valcor Engineering Corporation power reactor Operating Licenses (0Ls) or Construc-tion Permits (cps) 80-40 Excessive Nitrogen 11/7/80 All power facilities Supply Pressure with an Operating License Actuates Safety-Relief (0L) or Construction Valve Operation to Permit (CP)

Cause Reactor Depressuriza-i l

tion 80-41 Failure of Swing Check 11/10/80 All power reactor Valve in the Decay Heat facilities with an Operating Removal System at David-License (0L) or Construction Besse Unit No. 1 Permit (CP) l Enclosure l

l i

l 1

l