b DA/RYLAND'
,.h COOPERAT/VE
- PO box 817 2615 EAST AV SOUTH
- LA CROSSE W!SCONSIN 54601 M
isc6) 78a4000
'=
};'
December 1, 1980 E
In reply, please refer to LAC-7257
'I DOCKET NO. 50-409 Mr. James G.
Keppler Regional Director U. S. Nuclear Regulatory Commission Directorate of Regulatory Operations Region III 799 Roosevelt Road Glen Ellyn, Illinois 6013;
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 REPORTABLE 3CCURRENCE NO. 80-15 Refert:nce:
(1)
LACBWR Technical Specifications, Section 3. 9. 2.a. (3).
(2)
LACBWR Technical Specifications, Section 5. 2.1. 3. (b).
Dear Mr. Keppler:
In accordance with Reference 1, this is to inform you of abnormal degradation discovered in the primary reactor containment during periodic Type C surveillance leakage rate testing while in a shut-down condition.
As a result of conducting periodic Type C leak tests on the Retention Tank Pump Discharge Valve, the leak flow rates determined from the Condensate Valve exceeded the permissible leak flow rates as defined in Technical Specifications (Reference 2).
The test leakage rate was determined to be between 0.56 and 4.0 SCFH.
The Acceptance Criteria is 0.375 SCFH.*
The test was performed on November 29, 1980.
Prompt notification of test results to the U. S. Nuclear Regulatory Commission was accom-plished at 1645 on November 29, 1980, by R.
J. Cota, LACBWR Duty Shift Supervisor.
- Shall not exceed 1% of leakage rate L where L is 37.5 SCFH.
pg po DEC' 3W tb 8012150 S
Mr. James G. Keppler, Regional Director LAC-7257 U.
S. Nuclear Regulatory Commission December 1, 1980 Repairs or adjustments to the Retention Tank Pump Discharge Valve will be accomplished and a retest will be performed.
If there are any questions concerning this report, please contact us.
Very truly yours, DAIRYLAND POWER COOPERATIVE
/?
,' Tit J
Frank Linder, General Manager FL:LSG:af l
cc:
Director, Office of Management Information and (3)
Program Control U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 l
l l
l
..