E Tr g tT5 Fs m M M
CON!WS 2.1MOMM
,
,
. O ,e? "~%
u~i1Eo er*re
g
^^
g
NUCLEAR REGULATORY CcMISSION
g
g
n e
REGION 11
o,,
!
88
101 MARIETTA sT., N.W..sulTE 3100
g %,#.....j
ATLANTA, GEORGIA 3o3o3
In Reply Refer To:
RII: CDP
SEP 121980
50-335/80-29
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
Advanced Systems and Technology
P. O. Box 529100
Miami, FL 33152
Gentlemen:
This refers to the inspection conducted by C. D. Perny of this office on August 19
through 22, 1980, of activities authorized by NRC Operating License No. DPR-67
at St. Lucie and to the discussions of .ur findings held with C. M. Wethy at the
conclusion of the inspection.
Areas examined during this inspection included your physical security program as
implemented under the provisions of Title 10, Code of Federal Regulations, Part
73, " Physical Protection of Plants and Materials" and the specific requirements
of your approved Security Plan. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, performance tests, and observations by the ing;pector.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved. Details of activities involving
safeguards and security measures are exempt from disclosure in accordance with
10 CFR 2.790(d). Therefore, your response should be incorporated in a separate
paper and referenced in your reply.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 3
Title 10, Code of Federal Regulations, activities involving safeguards and
security measures are exempt from public disclosure; therefore, the enclosures
to this letter with the exception of the report cover page, which is an inspection
summary, will not be placed in the Public Document Room.
-8012120$ %
MATHIAllltANSMITTG MM
coNTAttis 2.7saistoRMATl0N
.
_.
.
.
- - - .
_--
- - _ - - -
.
.
-
.
-
samtmNsWTTG HEEWITil
cox1Aixs 2.190INFORMATION
SEP 121980.
.
.
Florida Power and Light Company
-2-
,
l
Should you hav:. any questions concerning this letter, we will be glad to discuss
them with you.
.
Sincerely,
/
/
w
I
. Kenh[, Chief
Safeguard / Branch
Enclosures:
1.
Appendix A, Notice of Violation
(Exempt from Disclosure)
.
2.
Inspection Summary
I
(Not Exempt)
3.
Inspection Report No. 50-335/80-29
(Exempt from Disclosure)
cc w/ encl:
,
C. P Wethy, Plant Manager
Nat Weems, Assistant QA
Construction Manager
<
'