ML19345D157

From kanterella
Jump to navigation Jump to search
Requests Addl Fees Re Transmitting Test Confirmation Rept on Seismic Qualification & Requesting Tech Spec Changes
ML19345D157
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/30/1980
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Whitmer C
GEORGIA POWER CO.
References
NUDOCS 8012120066
Download: ML19345D157 (2)


Text

'.

wnu

' d. '

o, UNITED STATES

\\

[];w 3 )

NUCLEAR REGULATORY COMMISSION wasmucron. o. c. :osss

, gg/j; s

g g.

/

g7,.

00CKET N0. 50-366 Georgia Power Company ATTN: Mr. Charles F. Whitmer Vice President - Engineering P.O. Box 4545 Atlanta, Georgia 30302 Gentlemen:

We have received a copy of each of the following items your Company filed with the Office of Nuclear Reactor Regulation (ONRR) for review:

1.

Letter dated October 10, 1980, trarsmitting a test confirmation report on Seismic Qualification of Generator Static Exciter Cabinet.

2.

Letter dated October 17, 1980, requesting Technical Specification changes for Cycle 2 operation with Reload 1 fuel inserted in the core.

A fee pursuant to 10 CFR Part 170.22 did not accompany item 1 above, but a Class III fee of $4,000 was received with item 2 above.

Based on information provided by the ONRR staff as a result of a preliminary review of each of the above items, it has been determined that:

a.

Item 1 requires ONRR staff review and approval which is considered to involve a single safety issue and requires a Class III fee of 54,000.

b.

Item 2 involves three separate safety issues in that a reanalysis of the Minimum Critical Power Ratio as required by license condition 2.C(3)(c) has to be performed; the Boiling Transition data required by license condition 2.C(3)(d) has'to be reviewed; and a fuel type not specifically included in the NRR approved version of NEDE-24011P has to be considered. Therefora, this application requires three Class III fees totalling $12,000.

In consideration of the above and pursuant to 10 CFR 170, it is requested that your Company remit a total of $12,000 to this office. This amount includes 54,000 for item 1 and an additional $8,000 for item 2 above. Although 10 CFR hW I

Georgia Pcwer Company --

170.22 categori:es several Class III's as recuiring a Class IV fee, it is our policy to enarse up to three Class III's as sing'le Class III's anc not as a Class IV.

For this reason, item 2 is not classified as recuiring a Class IV fee.

If the final resiew of your application by the CNRR staff reveals that these fees are incorrect, an adjust:nent will be made.

Sincerely, U;;cf. C. James Neasusy.,4,.

J / 'dilliam O. Miller, Chief 0/ License Fee sanagement sranch Office of Administration DISTRIBUTICN:

Occ.<ec File PCR LPDR LFMB Reactor File (2)

D. Verrelli, ORS-4 R. Ingram, ORS-4 R. Diggs, LFMS LFMB R/F (2) 9 DO3'l$:

.3O D

en n m

I LFMB:ACM l

LFM8:ACM i

LFM!i:)J;M i

l e, cc )..m..

.L...

- a...

ggA:ba,

EJHol i cway i

-R........'e,e.,'

.... - M.i l t.

c.

su o w s )...

CATE. /.

bM. i.

~ '

~

N8C r:mu ;;a.7.

43.ac. ::.c

~2. 3. 3, v t a N.c c 4

  • s o s NT No.g p r c g ; 3?9 259 167

..,