Informs of Interim 10CFR50.48 Suspending Completion Dates for Previously Approved Fire Protection Mods.Revised 10CFR50.48 Will Contain Schedules for Completion of All Protection Mods
ML19345C997
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/17/1980
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Clayton F
ALABAMA POWER CO.
References
NUDOCS 8012080753
Download: ML19345C997 (5)


Text

.. __

p/eEA ft -%je UNITED STATES g

g NUCLEAR REGULATORY COMMISSION y

r, -

-l WASHINGTON, D. C. 20$55

.t

/

    • o*

November 17, 1980 g

h Docket No. 50-348

y;
j

&YM z:

M

~

w mm

=

"5 Mr. F. L. Clayton 2

s Senior Vice President 7

Alabama Power. Company Pos. Office Box 2641 Birmingham, Alabama 35291

Dear Mr. Clayton:

As you know, a proposed Section 50.48 and Appendix R to 10 CFR 50 has been pending since May 1980. The Commission has recently approved a revised final version of that proposed Section 50.48 and Appendix R to 10 CFR 50 v:hich will be published in the Federal Register shortly and will become effective 90 days af ter publication. This revised 10 CFR 50.48 will contain schedules for completion of all fire protection modifications.

One set of schedules will be applicable to features covered by Appendix R.

A similar set of schedules will be applicable to all other fire protection rodifications that have been approved by the NRC staff in a staff safety i

evaluation report. This latter set of schedules will require completion of modifications not covered by Appendix R by schedules specified in the revised rule or by the dates now specified as license conditions, whichever is sooner, unless an extension or exemption is approved by NRC.

Some of the completion dates discussed in the SER for your facility may be associated with modifications for which the NRC staff required additional information, such as design details or test results, to be subsequently reviewed and approved by the NRC staff prior to implementation.

To the extent that there are fire protection modifications such as this for your facility and the required additional information has not yet been approved by the staff as evidenced in a staff safety evaluation report, there is no present implementation requirement; consequently, completion of such items will be governed by the schedules in the revised rule.

In the interim, pending the effective date of the revised rule, the Commission has approved a new Section 50.48 of 10 CFR 50 suspending completion dates for fire protection modifications previously approved by the NRC staff.

This new section became effective upon publication in the Federal Register on October 29, 1980 (45 FR 71569). A copy of the new rule is enclosed for your information. This rule will be superseded by the revised rule when it becomes effective.

e 4

y_

s

~

Mr. F. L. Clayton 2-November 17, 1980 Alabama Power Company In the near future, we plan to contact you to identify specifically which fire protection features associated with your facility are covered by Appendix R and would thus be subject to one set of schedules, and which are previously approved items which are covered by a different set of schedules.

Sincerely,

\\

l 3

i 6.

1sen ut, 1 rector Division of Lscensing 1

Enclosure:

As stated cc: w/ enclosure:

See next page d

9 f

e 4

a

~

i a

r-y -

,,,~y,-~.

y.

--9--4-..

-r

--r

,,,,,y

.-.n3

-~---y,-

y.-mi-

?

A l

Mr. F. L. Clayton, Jr.

Alabama Power Company November 17, 1980 4

cc: Mr. W. O. Whitt Executive Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291 Ruble A.. Thomas,'Vice President Southern Company Services, Inc.

Post Office Box 2625 Birmingham,' Alabama 35202 George F. Trowbridge, Esquire i

Shaw, Pittman, Potts and Trowbridge 1

1800 M Street, N.W.

l Washington, D. C.

20036 Mr. Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Williams and Ward Post Office Box 306 Birmingham, Alabama 35201 i

Gecrge S. Houston Memorial Library 212...Burdeshaw Street l

Dothar., Alabama 36303 Resident _ Inspector 1

l U. S. Nuclear Regulatory Commission Post Office Box 1814 i

Dothan, Alabama 36302 i

I l

?

2 o

h l

~

[~,

  • Tcieral Register / Vol. 45. No. :11/ Wednescay. October 29. 1980 / Rules anJ Regulatie:s 71.569 published on October 1.1980. 45 FR perfor:ns the following speci51c earlier anticipated has been reg: red to s<r.45. Tne corrected i 0.01 is ; ublished functions:

be]ow.

prepare a final rde on fire prote:nce.

Although the final nde la asc EFFTCirYE D ATE: April 18.1980.

. in u.ams ru.om ass. ]

comp!etion, and will in:c.porate an frnplementation schedule difen:t from FoR FURTHER INFORW ATION CoNTAC atwi c cooe sman.#

Robert P. De Young. Private Radio that in the prcposed rule,it h.as :ot yet -

U#*

I been published and in any erut wocid Ao:REss: Federal Communications..

NpCLEAR REGU!ATORY not be effective until so days alte Co==ission. Washington. D.C. 20554.

N!SSION publication.

Certain NRClicensees,howeve are suPPLEMDi rARY INFORMAT1oN:

0 CFR Part 50 '

at present operating underli:ense In the Matter of amendment of Pa:t 0 conditions or technical speciSaJoss to transfer authonty for ce= mon carrier Fire Protection Schedules for thereto which include the Nove=her 1 j

- matters :nvolving public coast stations Operating Nuclear Power Plants deadline or other dates whien w.:~.

If the Prisate Radio Bceau.

acENer:U.S. Nuclear Regulatory pre:ede the effective date of the SA!

Rejeased: August 19.198o.

Commission.

rde.To the extent that-these lice = sees i

have been u::able to complete aD of the 3

.In the Order in the above-captioned Action: Final rule.

.-- =stier. FCC 03-179 released April 7.

fire prote: tion measures to whi:h these i

  • 'P I

' *P#'

tr.c. Sedon 0.91 of the rules was suuuaRn The Nuclear Regulatorv

~

a= ended to reDect a transfer of function Commission (NRC)is amending its would violate th'e beense conn:ti:=s.

5 Sm the Co= mon Carrier Becau to the regdations to te=porarily suspen-The vidden wedd ed edpc Pdvate Radio Bureau (45 FR 5399. April completion schedules for certam fire 6 final rde bem e5m m 5

protection features in operatmg nuclear g g7, g agog,gg.g

.g g

gg I

in the final rule will supersede

Se: hen 0.91 of the rules was also,

P *"15 P'" "8 C ON' ** E8 "W8 incensistent license conditiens.

E

.--emended by Order. FCC 7ME:.

The Com:nission has dete ised.

~

re:essed March 7.197s0. to reflect the rul.

tg u

ns en s rt: ganirabon of the Co= men Carner.

necessary because some NRC licensees -

b".'."P.*"*

  • U#' #'

'd E

__3eeau. Tr_ ough taa dvertence. our an die 2 r met fire promedm te tr.is rwe:2aking. $at re.' *,5: these ue.

Order of Apdl 7. amended the language gg,.mudon deadines containd i1 license c n itien= 3s appropdate g

g cf the rde p-ict to its havi=; been licensed conditions.The Commission pen ng pr%gatmn of the Enal me on s-- nded by oe Order of March 7.19e:

its fou:d that fire proteden measures - - nre pr tection ap$ cable to aM g

(45 FR4sts';. March 13.1980).

al.eady implemented giv<: reasonable II*' 55'E***"*I"'II#*P'***C:IC:

E 2.To cvre:: this situation. Section assuran:e of safety, and that no heahh

".sures have already bec g

c.s-is a= ended as set forth in the and safety interest would be served by impamented at aU operating pla==5ne implementat,ca schedule of the fi::al g

attached appencix. to amend the fcrcing eertain licensees to shut dow:

i 3

win be unRor= end co=p ehe:sive.

==

cir ently eSective language of the rule.

deing the bdef period between the ru

"" *IU 'PNT I' "" *P*#8-I M.*&.

license condition deadlines and the

15 5

Fe:ieral Cc:.=unications Cs - 'ission.

efa:tiveness of the final fire protectica inc ng H

d ere:1 ses, es g

(sc:s.4.s:2. 4a 5 tat as amenu.f.1oos.1oe:: 'rde.

  • * ** I"'

I" * * " * * * * "

  • E G

4r U.S.C. m. 3:31 EFrucityt o Air.: October 29.1980.

public health and saferv interest would

~

=

C'* W^^ ***

be se ved by forcing only these

=

FoR FURTHER INFoRMATioN CoNTACTt licensees unable to meet *dtadines k

Secec?F

  1. ~

William Shields. Office of F_xecutive preceding the effectiveness of de f=al 5

Part o of Chapter I of Title 47 of the Legal Dire: tor. U.S. Nuclear Regdate y rule to shut down for the bdef i:te-i=.

E Code of Federal Regulations is ' amended Com=ission. Washington. D.C. :0535.

as follows:

phone h 492-8695.

To the contrary the !!re p ::e -de:

2 measures already i=

5 reasonable assurance %eme:te.d give In 10.91 the introductory textis SUPPt.EM ENTARY INFoRMATroN:On May that an operating revised to read as follows:

23.1980, the Commission published in '

cn: lear plants may continue to op rate E

' the Federal Register (45 FR 3608 ) a

. safely even though the final rue w'I E

I C.S t Functions of the Beareau.

Notje, c{ proposed Rulemaking entitled require additional fire prote:nas 5

Tne Cc= mon Ca.rierBureau

." Fire Proteden Program for Nuclear measures at many plants.

E develops.re:ommends and administers Plants Operating Prior te january 1.

The Administrative Procedure A:t 5

policies and progrr.. s for the regulation 19 3.'Tae proposed rule provided that provides that a rule may be e5e.:ttre 5

cf sarvices fa:11!ues, rates and practices au fire protection modifications except upon. publication when tlist rt.M ' c ants E

of entitiertexcluding public coast altemate or dedicated shutdown or recognizes an exception er rehens a E'

stations is the maritime mobile service) capability would Web sired to be restriction." 5 U.S.C. 553[d) :). -:is rule 5i which fumish interstate or foreign i=Nemented b* 4 i 4 en.ptr 1.1SBO.

relieves certain NRClicensees 5:

,':E 1 communi:ations se vice for hire-

.unless the C stait ica yprove as

. license conditions or techni:a!

EE whether by wire. radio, cable or satellite extensie-V g.' ause.This deadine -.spe:!!ications thereto in regud to fre 5

facilities-and of an fUary cperations was s'io er A ' -

.e Commission's proteden implementation deadlines.

E:

related to the provisions or use of such May2 % v. yandum and Order and will therefore be effeedve =po:the 5

suvices.Le Bureau also regulates the on the t; Mien of Cenc ted Scientists

-.date of publication in the Federal iE rates. terms and conditio:s for cable-Petitien for Emer2:ncy drf T.tmedia!-

' Register. Furthermore, as noted abere.

5 te'.2 vision and se:h a tta:h=e= pole attachments. where Action.11 NRC 707. 719.

the proposed rule stated that eme=sto=s EE t

ts are not regulated by a Many of the commenters on the from the November 1. dead!ise wo-d be IE l

stste and est p.ovided by railroads or proposed rule contended that the considered for good cause.Exte= sin 15,

j

  1. ovemmentaliy-or cooperatively November I deadline was unachievable. public comment was received te ths Ei i swmed utilities.De Bureau also Moreover.much more time than was
  • IIect that the deadline was u=realstic 55 '

Deu l

~.*.*=*

m -.

=-

71..570

[cdercl Register / Vcl. 45. N2. 211 / W:dnesd y. Oct:ber :9.1980 / Rules and Reguhtions E:-E and should be revised. Under these r=

circums: ::es the Co==ission believes E

that there is good cause for an extension 5

cf the lice:se c ndition sehedules pending eI~ectiveness of the finalrule on 6'0 D (Laj q

1 EE d[} DJ- @f Ere prote:te:.

The rule prevides that all co=pliance U' I E

U b dates cc tained in license conditions or J u't La gg te _ sical s;e:L'i:ations for required nre E

protection measures are suspended '

E E

pending h-&er action by the Co==issics. As is clear from the above EE discussio:. that further a etion will be premdgati:: of the final rule on Sie E

protectic=.~ne Co::=ission intends that E

lica: sees au-ted by this rule should E

use best efo :.s to complete all required 35 neasures as soo: as possible despite

!EE the suspe:sion cf the deadlines for this E

brief peried E=

Pursaar: to the Atomic Energy Act of EE 1954, as a= ended. the Energy Rao ga.i:ation Aet of1974.as amended.

!Es and Se:*.ic.s 55* and 553 of Title 5 of the

-'EI United States Code, cotice is hereby E

give: that Se following amendment te

E;=

Title Ic. Chapter 1. Coce of Federal E:

Rigt.lati::s. Part 50 is published a s a 5:

do::=est subje:t to codiScation.

E.E. E E.

PART SO.-DOMESTIO LICENSING OF fr:

PRODUOOOH AND UTILIZATION

.r. :.

"-u=

FAO:LITIES

= -
1. A tew Se: tion o0.48 is added to EEE read as icliows:

E f Sc.a8 Fee twotection schedules.

'E i To the extent dat a::y facility's.

lict se c..ditions or te:hrical

~

specif!:a:: s in:o porate compliance EEEE dates f: ::odiS:ations necers'ary to

~~-

provide S e p t:tien features prep: sed h.a:ensee and accepted by

==

the SW s:aff as satisfying se

,.rosisic.s of Appendix A to Branch

~.G Te:inica ?:siti:n ETP/ APCS 3 S.5-1

~

' :=

and refle::ed in 5'RC s:aff Fire Protecti:: Safety Eva! cation Reports

=n-Issued p.-i:r to the effectWa date of this Z. ".-

rule. these dates are hereby suspended pendi.; hrther a: tion by the li i:E Co--a ic s

(Se:. tt.E Ab. Law 83 '/.3. sa S!st S4a; Sec.

1. NL Law Q-4:! 84 Stat.1:42 [C U.S.C.
010:). 584:

Dated a1 Washir.3 ton.L.: this.-,$ day of 0:::ber ISM 7.. a F:::he 2: lear Regulato y Commission. S.amuel C. CCc. Se:re:.::. c.':.he Comtnission. --.a in,sor. - rc.a u u e m u I ar.1 Joe 3 CCoi ?Hr e$.48 -~ .g l

:.'/ T. 5..
.~ O ~.

l .. :}}