ML19345C966

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-518/80-18,50-519/80-17, 50-520/80-18 & 50-521/80-16 on 800801-29 & Notice of Violation
ML19345C966
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 10/16/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19345C952 List:
References
NUDOCS 8012080678
Download: ML19345C966 (2)


See also: IR 05000518/1980018

Text

.

. . _ -

_

_

_ _ _

_

~ . _ _ _ ._,

_

__.

[sa 6e

-

,

'

o,

UNITED STATES

8'

~t

NUCLEAT 'iGULATORY COMMISSION

,,

3*

" - :

E

REGION il

.g [i

f

101 MARIETTA sT., N.W., SulTE 31o0

\\/ /

AT LANTA, GEORGt A 30303

  • ..+

,

OCT 161980

In Reply Refer _To:

RII:WBS

50-518/80-18

50-519/80-17

50-520/80-18.

50-521/80-16

.

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

'

Chattanooga, TN 37401

Gentlemen:

,

3:

This refers to the inspection conducted by W. B. Swan of this office on August 1

through 29, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-

,

150, CPPR-151, CPPR-152, and CPER-153, for the Hartsville facility, and to the

4

discussion of our findings held with R. T. Hathcote at the conclusion of the

inspection.

Areas examined durica the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

. selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

'

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (':i the

date whet. full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, TiGe

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, . it is

necessary that you make a written application within 20 days to this office to.

withhold such 'information from public disclosure. Any such application must

include a full statement of.the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified.in the application is contained in a separate part of the

document. If we do' not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

-

8012080

y

_

_

.

. . . . .

.

-

-

.

,

0CT 161980

Tennessee Valley Authority

-2-

s

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

<:

Q%

.cg[-

. _ >

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-518/80-18,

50-519/80-17, 50-520/80-18, and 50-521/80-16

cc w/ enc 1:

R. T. Hathcote, Project Manager

,

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. k' ills, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

.-

-.

-

-

,