ML19345C966
| ML19345C966 | |
| Person / Time | |
|---|---|
| Site: | Hartsville |
| Issue date: | 10/16/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19345C952 | List: |
| References | |
| NUDOCS 8012080678 | |
| Download: ML19345C966 (2) | |
See also: IR 05000518/1980018
Text
.
. . _ -
_
_
_ _ _
_
~ . _ _ _ ._,
_
__.
[sa 6e
-
,
'
o,
UNITED STATES
8'
~t
NUCLEAT 'iGULATORY COMMISSION
,,
3*
" - :
E
REGION il
.g [i
f
101 MARIETTA sT., N.W., SulTE 31o0
\\/ /
AT LANTA, GEORGt A 30303
- ..+
,
OCT 161980
In Reply Refer _To:
RII:WBS
50-518/80-18
50-519/80-17
50-520/80-18.
50-521/80-16
.
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
'
Chattanooga, TN 37401
Gentlemen:
,
3:
This refers to the inspection conducted by W. B. Swan of this office on August 1
through 29, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-
,
150, CPPR-151, CPPR-152, and CPER-153, for the Hartsville facility, and to the
4
discussion of our findings held with R. T. Hathcote at the conclusion of the
inspection.
Areas examined durica the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
. selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
'
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (':i the
date whet. full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, TiGe
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, . it is
necessary that you make a written application within 20 days to this office to.
withhold such 'information from public disclosure. Any such application must
include a full statement of.the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified.in the application is contained in a separate part of the
document. If we do' not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
-
8012080
y
_
_
.
. . . . .
.
-
-
.
,
0CT 161980
Tennessee Valley Authority
-2-
s
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
<:
Q%
.cg[-
. _ >
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-518/80-18,
50-519/80-17, 50-520/80-18, and 50-521/80-16
cc w/ enc 1:
R. T. Hathcote, Project Manager
,
J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E. k' ills, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
.-
-.
-
-
,