ML19345C764
| ML19345C764 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 12/02/1980 |
| From: | Mayer L NORTHERN STATES POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19345C765 | List: |
| References | |
| NUDOCS 8012080319 | |
| Download: ML19345C764 (1) | |
Text
-
0 0
NSP NORTHERN STATES POWER COMPANY MIN N E APO L8 8. MIN N E SOTA 55409 December 2, 1980 Director of Nuclear Reactor Regulation U S Nup} ear Regulatory Commission gWashington, Dc3 20555 6
t.T
- G l' PRAIRIE ISLAND NUCLEAR GENERATING PLANT
- p. '
i
? Docket No. 50-282 License No. DPR-42
'2 0 '
50-306 DPR-60
,[:,
in
[l o
Revision No. I to E
License Amendment Request dated May 6, 1980 m
f' SI Actuation and Power Distribution Limits C
Attached are three originals and 37 conformed copies of a revision to a previously submitted request for a change of Technical Specifications, Appendix A, of Operating Licneses DPR-42 and 60.
This submittal proposes a revision to the changes in Section 3.10 of the Prairie Island Technical Specifications as a result of discussions with the NRC staf f.
Pages TS 3.10-1, 2, and 3 should le removed f rom the May 6, 1980 License Amendment Request and the attached pages in Exhibit B should be substituted.
Exhibit A describes the proposed changes, reasons for change, and safety evaluation.
Exh ibit B contains the revised Appendix A pages.
. O.
L 0 Mayer, PE Manager of Nuclear Support Services LOM/TMP/jh cc: J G Keppler G Charnoff NRC Resident Inspector MPCA Attn: J W Ferman At tachment s 8012080 3/9