ML19345C741

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-454/80-20 & 50-455/80-19 on 801007-09.No Noncompliance Noted
ML19345C741
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/30/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19345C742 List:
References
NUDOCS 8012080279
Download: ML19345C741 (2)


See also: IR 05000454/1980020

Text

p

<jo ucoq'o$

,

UNITED STATES

8"

NUCLEAR REGULATORY COMMISSION

$

.E

REGION 111

'

e

o,

799 ROOSEVELT ROAD

GLEN ELLYN. lLLINotS 60137

%

o

OCT 3 01980

g

d

n,;

~

s.

-m

l

.]

us>

3

T

SS

-

-~

rn

Docket No. 50-454

__

~S

-

Docket No. 50-455

Id

-

.=5

v.

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed-

Vice President

Post Office Box 767

Chicago, IL 60690

This refers to the routine inspection conducted by Mr. C. M. Erb of this

office on October 7-9, 1980, of activities at Byron Station Units 1 and 2,

authorized by NRC Construction Permits No. CPPR-130 and No. CPPR-131 and

to the discussion of our findings with Mr. McIntire and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

.In accordance with_Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be'placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

considered p:oprietary, and should be prepared so that proprietary in-

formation identified in the application is contained in an enclosure to

the application.

i

8012080

277

_

e

.-

%

Commonwealth Edison Company

2-

-

007 3ct 080

We will gladly. discuss any questions you have concerning this

inspection.

1

-

Sincerely,

i

I

.< :.

.v$5eedYY

-

. G. Fiorelli, Chief

'

Reactor Construction and

Engineering Support Branch

,

Enclosure:

IE Inspection

Report No. 50-454/80-20

and No. 50-455/80-19

1

cc w/ enc 1:

Mr. J. S. Able, Director

of Nuclear Licensing

Mr. K. L. Graesser, Station

.

Superintendent

!

Central Files

Reproduction Unit NRC.20b

AEOD

Resident Inspectors, RIII

'

PDR

r

Local PDR

NSIC

TIC

I

Mr. Dean Hansell, Office of

Assistant Attorney General

i

i

4

J

s

1

i

i-

i -

!

4

f

,,.a,--

, .

n...

~ ..---

, - - - - ,

= = . . - - - , - ,

,

, , ,

.,n

, , ,

- - . , - - ~ .

-