Order Postponing Scheduling of Prehearing Conference Originally Set for 801216 Until Conclusion of Hearing Originally Scheduled to Commence on That Date.Also Modifies Limited Appearance Schedule
ML19345C617
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/25/1980
From: Bechhoefer C
Atomic Safety and Licensing Board Panel
To:
DAIRYLAND POWER COOPERATIVE, NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
References
ISSUANCES-SC, NUDOCS 8012080009
Download: ML19345C617 (2)


Text

~

~

fdOY,7f IWO e

- 3 w

UNITED STATES OF AMERICA t

NUCLEAR REGULATORY COMMISSION d

, ;.' f!"

2 C 33

  1. 3 A

ATOMIC SAFETY AND LICENSING BOARD UWC H

NOV 2 512 > ?

Charles Bechhoefer, Chairman DY:0E3 Dr. George C. Anderson omee g the W

'\\

'3d Ralph S. Decker Dochstint &*

S597 @

b N0Y 2 619N 4

In the Matter of DAIRYLAND POWER COOPERATIVE

)

Docket No. 50-409-SC

)

Prov. Op. Lic. DPR-45 (La Crosse Boiling Water Reactor)

)

ORDER CHANGING SCHEDULE OF PREHEARING CONFERENCE AND EVIDENTIARY HEARING (hovemoer D, 1900)

Reflecting information provided by telephone to the Board, notice is hereby given that, to accommodate the schedule of a witness for the NRC Staff, the prehearing conference scheduled for December 16, 1980 (see 45 Fed. Reg. 76557, November 19,

-1980), is postponed until the conclusion of the hearing scheduled to commence on that same date.

The hearing (which concerns a discrete issue separate and apart from the matters to be con-sidered at the prehearing conference) will commence at 9:30 a m.

on December 16, 1980.

(The prehearing conference is therefore not likely to commence until December 17 or 18.)

To the extent c.,....--

it deems necessary, the NRC Staff will be permitted to present'.

one or more witnesses at the outset of the hearing; other NRC Staff witnesses will follow the witnesses of the Licensee and i

)50 1

~

the intervenors.

i i

The schedule for oral limited appearance statements is

/ Q s

modified to provide that such statements will be heard-l 8 012680cey l

i beginning at 9:00 a.m. on~ December 17, 1980.

(No opportunity will be provided for statements on December 16, 1980, as previously scheduled.)

At the evidentiary hearing, the parties should address the following question (in addition to those specified in the Licensing Board's Memorandum and Order dated November 12, 1980):

6.

How long will it take to design a site dewatering system, have it approved by the NRC Staff, and install and make it operational?

At the prehearing conference, the parties should be prepared to discuss, in addition to matters specified in the November 12, 1980 Memorandum and order, discovery and scheduling.with respect to the issue involving the magnitude of the Safe Shutdown Earthquake (as authorized by ALAB-618, dated November 17, 1980).

In all other respects, the Memorandum and Order: dated November 12, 1980, and the Notice of that same date (45 Fed. Reg. 76557, November 19, 1980), remain unchanged.

IT IS SO ORDERED.

FOR THE ATOMIC SAFETY AhT LICENSING BOARD Ys~}?2

%l mbH Cfiarles Becnnoefer, Chairman l

Dated at Bethesda, Maryland l

this 25th day of November 1980.