ML19345C530

From kanterella
Jump to navigation Jump to search
Advises That Schedule for Testing Adequacy of Electrical Distribution Sys Voltage,As Detailed in ,Will Not Be Completed Until 810131.Data Will Be Compared to Analysis, W/Results Submitted to NRC by 810331
ML19345C530
Person / Time
Site: Brunswick  
Issue date: 12/02/1980
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NO-80-1780, NUDOCS 8012050436
Download: ML19345C530 (1)


Text

.

pp9 6IQil 3 cr.a z-we s'.antc w.::,,

December 2, 1980 File: NG-3514(B)

Serial No.:

NO-80-1780 Office of Nuclear Reactor Regulation ATTENTION:

Mr. T. A. Ippolito, Chief Operating React.rs Branch No. 2 United States Nuclear Regulatory Comctission Washington, D. C.

20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 ADEQUACY OF STATION ELECTRICAL DISTRIBUTION SYSTEMS VOLTAGE

Dear Mr. Ippolito:

In our letter of October 15, 1980, Serial No. NO-80-1548, Carolina Power & Light Company (CP&L) provided a schedule for testing the adequacy of the Brunswick Steam Electric Plant's (BSEP) electrical distribution system voltage. Due to a delay in the delivery of required test equipment and the unexpected need to calibrate parts of this equip-ment, this test will not be completed until January 31, 1981. Following this, the test data vill be compared to the analysis and the results will be submitted to the NRC by March 31, 1981.

Yours very truly, E.

E'. Ut ep

' n,f Executive Vice President Power Supply and Engineering & Construction RMP/DCS/je (2738) o/5-S lo b

3 A

e

,.M M

M g,

(

Q 8012050 \\

O

]

'