C
-p.. g i
8
~t UNITED STATES
['
g NUCLEAR REGULATORY COMMISSION y
REGION I o
631 PARK AVENUE 4,
,d,c g,
KING OF PRUSSIA, PENNSYLVANIA 19406 November 21, 1980 Docket No. 50-213 Connecticut Yankee Atomic Power Company ATTN:
Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:
The enclosed IE Bulletin No. 80-24, " Prevention of Damage Due to Water Leakage Inside Containment (October 17, 1980 Indian Point 2 Event)" is forwarded to you for action.
A written response is required.
In order to assist the NRC in evaluating the value/ impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the report (s) required by the Bulletin.
Please estimate separataly the manpower associated with corrective actions following identification of problems through the Bulletin.
Ifeyou desire additional information regarding this matter, please contact E
this office.
ti, _
ev it Sincerely, e
=.
7 y
n-.
A fc?
8 ce H. Grier Director p
$nclosures:
1.
IE Bulletin No. C0-24 2.
List of Recently Issued IE Bulletins CONTACT:
D. L. Caphton (215-337-5266)
$01204'O SC O
Connecticut Yankee Atomic Power 2
Company j
cc w/encls:
R. Graves, Plant Superintendent D. G. Diedrick, Manager of Quality Assi' ance i
J. R. Himnelwright, Licensing Safeguards Engineer 4
1 e
/
s i
l 1
i 1
1 1
1 9
e f
I 3-,, --
y s-%y v
,--e+
w w--y---
-nm+
,-y r--- - * - * -
-~
r-*
en -, --
--v*
w-w
?
1-~
SSINS N3.:
6820-
-Acesssicn No.:
l 8008220270 IEB 80-24 UNITED STATES OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 c
D
<D November 21,'1980
' m
. e9 av es IE Bulletin No. 80-24: - PREVENTION OF-DAMAGE DUE TO WATER LEAKAGE INSIDE CONTAINMENT (OCTOBER 17, 1980 INDIAN POINT 2 EVENT)-
1 j
Description of Circumstances:
On October 24, 1980 IE Information Notice'No. 80-37 described an event that occurred at the Indian Point.Urit 2 (IP-2) facility.
On October 17, 1980, i
upon containment entry for repair to a nuclear instrument, it was discovered l
that several inches of water.had accumulated on the containment floor without the operators' knowledge. -This accumulation was later determined to have amounted to over 100,000 gallons which flooded the reactor vessel pit and wetted the lower nine: feet of the reactor vessel while the reactor was at operating temperature.
The flooded condition resulted from the following combination of conditions:
(1) There were significant multiple service water leaks.from piping and fan 1
j coolers onto the containment floor.
This system had a history of leakage; i
(2) Both containment sump pumps were' inoperable, one due to blown fuses and the other'due-to binding of its float switch; (3) The significance of two containment sump level indicating lights which indicated that'the water level was 4
continuously above the pump-down level was not recognized by the' operators;
~
(4) There was no high water level alarm and the range of' sump level indicating lights failed-to indicate the overflowing sump level; (5) The moisture level indicators for the containment atmosphere did not indicate high moisture levels, apparently due to an error in calibration and/or ranging which made them insensitive to the moisture levels resulting from relatively small cold water z
leaks; (6) The hold-up tanks which ultimately receive water pumped from the containment sump also received water from other sources (Unit 1 process water, l
lab drain water, etc).
These other water sources masked the effect of cessation of water flows from the Unit 2 sump; (7) The fan cooler condensate wier level measuring instruments were_not. properly calibrated; (8) There was no water level instrumentation in the reactor vessel pit and the pumpe were ineffective j
since they discharge to the containment floor for ultimate removal by the -
i containment sump pumps.
l This Bulletin is issued to enable the NRC staff to formulate requirements for long term generic corrective actions which will be the subject (s) of future NRC actions.
The-bulletin requires short term actions which will preclude IP-2 type events at other plants in the interim before the longer term generic ae' ions are accomplished.
4 f
-m
,ma43 p re-e--pu-
-a e-
=
ri-w+-
ce+-,
- ee--e eww w
,- c4 r-w-=r
e IEB 80-24 November 21,-1980 Page 2 of 3 Actions to be Taken by Licensees:
1.
. Provide a summary description of all open* cooling water systems present inside containment.
Your description of the cooling water systems must include:
(a) Mode of operation during routine reactor operation and in-F
-response to a LOCA; (b) Scurce of water and typical chemical content of
-water; (c) Materials used in piping and coolers; (d) Experience with' system leakage; (e) History and type of repairs to coolers and piping systems
'(i.e., replacement, weld, braze, etc.1; (f) Provisions for isolating portions of the system inside containment in the event of leakage including vulner-ability of those isolation provisions to single failure; (g) Provisions for testing isolation valves in accordance with Appendix J to 10 CFR 50 (h) Instrumentation (pressure, dew point, ' flow, radiation detection, etc.)
and procedures in place to detect. leakage; and (i) Provisions to detect radioactive contamination in <*rvice water discharge from containment.
I 2.
For plants with open cooling water. systems inside containment take the following actions:
4 a.
Verify existence or provide redundant means of tetecting and promptly alerting control room operators of a significant accumulation of water in containment (including the reactor vessel pit if present).
- =
b.
Verify. existence or provide positive means for control room operators to determine flow from containment sump (s) used to collect and remove
-water from containment.
c.
Verify or establish at least monthly surveillance procedures, with appropriate operating limitations, to assure plant operators have I,
at least two methods of determining water 1evel in each location where
~
water may accumulate.
The surveillance procedures shall assure that at least one method to remove water from each such location is available during power. operation.
In the event either the detection or removal systems become inoperable it is recommended that continued power
]
operation be limited to seven days and added surveillance measures j
be instituted.
1 l
- d. Review leakage detection systems and procedures and provide or verify ability to promptly detect water leakage in containment, and to isolate the leaking-components or system.
Periodic containment entry to inspect
- An Open system utilizes an indefinite volun-such ar a river, so that leakage from the system could not be detected by insentory d -cease.
In addition, a L
. direct radioactive pathway might exist to outside cont.inment in the event of a LOCA simultaneous with a-system leak inside containment.
A closed system utilizes a~ fixed, monitored volume such that leakage from the system could be detected from inventory decrease and a second boundary exists to prevent loss of containment integrity as a result of a system leak inside containment.
i l
1 o.
IEB 80-24 Novemb3r 21, 1980 Page 3 of 3 for leakage should be considered.
e.
Beginning within 10 days of the date of this bulletin, whenever the reactor is operating and until the measures described in (a) through (d) above are implemented, conduct interim surveillance measures.
The measures shall include where practical (considering containment atmosphere and ALARA considerations) a periodic containment inspection or remote visual surveillance to check for water leakage.
If containment entry is impractical during operation, perform a containment inspection for water leakage at the first plant shutdown for any reason subsequent to receipt of this bulletin.
f.
Establish procedures to notify the NRC of any service water system leaks within containment via a special licensee event report (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with written report in 14 days) as a degradation of a ccanainment boundary.
3.
For plants with closed cooling water systems inside containment provide a summary of experiences with cooling water system leakage into containment.
4.
Provide a written report, signed under oath or affirmation, under the provi-sions of Section 182a of the Atomic Energy Act of 1954, in response to the above items within 45 days of the date of this bulletin.
Include in your report where applicable, your schedule for completing the actions in response to items 2 (a) through (d).
Your response should be sent to the Director of the appropriate Regional Office with a copy forwarded to the Director, NRC, Office of Inspection and Enforcement, Washington, D.C.
20555.
If you desire additional information regarding this matter please contact the appropriate IE Regional Office.
Approved by GAO, B180225 (R0072); clearance expires November 30, 1980.
Approval was given under a blanket clearance specifically for identified generic problems.
IE Bulletin No. 80-24 November 21, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.
80-23 Failures of Solenoid 11/14/80 All holders of a Valves Manufactured by power reactor OL Valcor Engineering or CP Corporation 80-22 Automation Industries, 9/12/80 All holders of a Model 200-520-008 Scaled-radiography license Source Connectors 80-21 Valve Yokes Supplied by 11/6/80 All holders of a Malcolm Foundry Company, Inc.
power reactor OL or CP Revision 1 Boron loss from 8/29/80 All holders to 79-26 BWR Control Blades of a BWR power reactor OL Revision 1 Failures of Mercury-8/15/80 All holders of a to 80-19 Wetted Matrix Relays ia power reactor Reactor Protective OL or CP Systems of Operating Nuclear Power Plants Designed by Combustion Engineering 80-20 Failures of Westinghouse 7/31/80 All holders of a Type W-2 Spring Return to power reactor OL Neutral Control Switches or CP 80-19 Failures of Mercury-7/31/80 All holders of a Wetted Matrix Relays in power reactor OL Reactor Protective Systems or CP of Operating Nuclear Power Plants Designed by Combustion Engineering 80-18 Maintenance of Adequate 7/24/80 All holders of a Minimum Flow Thru PWR power reactor Centrifugal Charging Pumps OL or CP Following Secondary Side High Energy Line Rupture Supplement 3 Failure of Control Rods 8/22/80 All holders of a to 80-17 to Insert During a BWR power reactor Scram at a BWR OL or CP
.