ML19345B609
| ML19345B609 | |
| Person / Time | |
|---|---|
| Issue date: | 11/17/1980 |
| From: | NRC COMMISSION (OCM) |
| To: | |
| Shared Package | |
| ML19290G239 | List: |
| References | |
| REF-10CFR9.7 SECY-80-486, NUDOCS 8012020209 | |
| Download: ML19345B609 (7) | |
Text
d' 4M t 0 t0 T,I O 8
~
$3 Lf)
B G
m W2 tz 20q
=
t=
CD l
l l
SUDE 2
^'
~
t
'f IIISTORY OF PAT-DOWN SEN01 ISSLE o PUBLICATION OF 10 CFR 73.55 3
o PUBUCATim 0F GUARD TRAINING REvalREMENTS o EXTENSims 0F PAT-DOWN RELIEF o Camissim DECISIm ON SCREENING PROGRAM I
g 4
SUDE 3 4
INTERIM SEARCil PROCEDURES i
o EauteMeur SEAncimS - tbST SITES o 2 RANDm PAT-b - NON-SITE fJiPLOYEES o ALL VISITmS PATrED-DOWN o 10-25 RANDm SEARCIES OF HON-SITE EMPLOYEES (MON Ecu!PMent Fiid o PAT-b 0F fliPLOYEES - WELL GROUNDED SUSPICION e
a l
SLIDE l G'
PROPOSEDSEARCilPROCEDURES
'1 0 InNDATmY EQUlmEtlT SEARCllES - Au. PERS0tlS l
0 Au VISITmS PARED-DOWN f
0 ALL PERSONS PATTED-DOWil (M0ft FAIWRE OF Au_ FIREARf4S OR FELOSIVEDETECTORS o PAT-DWN OF 04PLOYEES - (MON SUSPICI0tl t
9
9
- a. Ice 5 SEAROFS OF MRC FfPlDYEES o RESIDENT INSPECTORS TREATED As SITE EMPLOYEES O REGIONAL INSPECTORS CERTIFIED IN ADVANCE BY REGIONAL DIRECTOR TREATED AS SITE EMPLOYEES O ALL OmER NRC PERSONNEL TREATED AS VISITORS N
SUDE 6 I
1 SOEDlLE O AMENMEnts PuBuSHen DECBEER 1980 o ComENTS ANALYZED, FINAL RULE JUNE 1981 PUBLISHED, RULE EFFECTIVE o LICENSEES SUBMIT PLAN CHANGES JULY 1981 o PLANS APPRWED SEPTDEER-0CTOBER 1981 o SEARCHES IMPLEMENTED DECtruiER 1931 s
UNITED STATES NUCLEAR REGULATORY COMMISSION October 28, 1980 SECY-80-486 CONSENT CALENDAR ITEM For:
The Comissioners Frcm:
John G. Davis, Director
'N
/
Office of Nuclear Material Safety and Safeguards
)
4 Thru:
William J. Dircks, Executive Director for Operations
Subject:
RESOLUTION OF THE PAT-DOWN SEARCli ISSUE AT POWER REACTORS AND STATUS OF RELATED SAFEGUARDS ACTIVITIES
Purpose:
a.
To obtain Commission approval for proposed rule changes to implement search procedures at power reactor protected area entry portals (see Enclosure A).
b.
To extend the current relief from routine pat-down searches of employees from November 1, 1980 until licensees have implemented the revised search requirement of (a) above (see Enclosure B).
c.
To report on the status of other safeguards measures designed to improve protection against the insider threat.
Category:
A matter requiring Comission action.
Discussion:
Background
In response to SECY 79-598, the Commission decided to defer implementation of routine physical pat-down searches of regular employees at power reactors as well as other complementary and alternative measures for protection against insider sabotage.
This defer-ment was for t' a purpose of allowing NMSS and RES sufficient the to further study the insider threat problem at power reactors and to formulate recommenda-CONTACT:
tions for increasing the protection against the insider Tom R. Allen - SGRI threat (see 44 FR 65969).
The staff wishes to inform the Comission of a series of ongoing and planned actions in 42-74181 this area, and to seek Comission approval to publish lealing with entry searches at DUPLICATE DOCUMENT LI Entire document previously SECY,!
entered into system under:
ies which were distributed to Comission i-1980' i3 ANO kDMNO%M
!t No. of pages:
3 3--