ML19345B573

From kanterella
Jump to navigation Jump to search
Confirms 801016 & 17 Telcons Re Util Commitments to Perform Well Water Sampling & Analysis at Locations Around Site. Analyses Will Be Performed for Gross Alpha,Gross Beta & Tritium
ML19345B573
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 11/19/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8012020091
Download: ML19345B573 (3)


Text

Il L p tsg j.g jo UNITED STATES f

NUCLEAR REGULATORY COMMISSION 3

o E

REGION lli

\\ ***** g*['

Q 799 ROOSEVELT ROAD GLEN ELLYN,ILLINotS 60137 uc1io mo Docket No. 50-10 Docket No. 50-237 Docket No. 50-249 Commonwealth Edison Company ATTN:

Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

This refers to our letter of October 17, 1980, and the telephone discussions between Mr. J. Golden of your staff and Mr. C. Paperiello of this office on l

October 16 and 17, 1980, and between Mr. Bitel of your staff and Mr. Davis of this office on October 16, 1980.

At that time your staff agreed to perform well water sampling and analysis at various locations around Dresden Station.

These locations would include:

a well at the Dresden Lock and Dam; a well at the southeast corner of the site; and two wells in a housing development across the Kankakee River from the plant.

Mr. Golden requested the name and addresses of individuals whose wells might be sampled in the housing development. A list of individuals in this develop-ment who have contacted the NRC to request their wells be sampled is attached.

Analyses will be performed for gross alpha, gross beta, and tritium. Samples will be obtained monthly for three months and then quarterly for three quarters.

The first round of sampling should begin as soon as possible.

If our understanding of the above agreement with your staff is not correct, please notify us.

Please inform us of the location of the two wells in the housing development you chose to sample.

8 012 02 0 og g

[

f f

Commonwealth Edison Company

- flCV 13 1980.

Thank you for your cooperation in this matter.

Sincerely,

/

t A. B. Davis, Chief Fuel Facility and Materials Safety Branch

Attachment:

As stated cc w/ encl:

Mr. J. S. Abel, Director of Nuclear Licensing Mr. D. J. Scott Station Superintendent Central Files Reproduction Unit NRC 20b AEOL Resident Inspector, RIII PDR Local PDR i

NSIC 1

TIC Mr. Dean Hansell, Office of Assistant Attorney General 4

m n - - -

w e

-, - m

F.

ATTACHMENT Mr. Larry L. Wills Mr. R. J, Hickok 72 Teal Lane 140 Cottage Rd.

Wilmington, IL 60481 Wilmington, IL 60481 Mr.-Byron L. Sowen, Jr.

Mr. Robert Hegland 34 Teal Lane 30 Teal Lane Wilmington, IL 60481 Wilmington, IL 60481 Mr. Tony Marchus Ms. Peggy Graves Rt. 4 Pheasant Trail 1150 Patterson Wilmington, IL 60481 Morris, IL 60450 Mr. & Mrs. Michael Marchese Mr. & Mrs. Ned Conway Rt. 4 Teal Lane 3 Hallard Lane Wilmington, IL 60481 Wilmington, IL 60481 Mr. Kurt Liebermann

  • Mr. & Mrs. Gary G. Buis 74 Teal Lane 87 Teal Lane Wilmington, IL 60481 Wilmington, IL 60481 Mr. Ed Kubinski Mr. K. G. Pierce Rt. 4 Pheasant Trail Box 140A Cottage Road Wilmington, IL 60481 Wilmington, IL 60481 Mr. & Mrs. George Kosch 6 Mallard Lane. Rt. 4 Wilmington, IL 60481
  • Well sampled by NRC