Forwards IE Insp Repts 50-424/80-12 & 50-425/80-12 on 800909-11.No Noncompliance Noted
ML19345B251
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/09/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19345B252 List:
References
NUDOCS 8011260422
Download: ML19345B251 (2)


See also: IR 05000424/1980012

Text

'

y. /

. [%/1

k

~

UNITED STATES

,

- "Y

7

,

NUCLEAR REGULATORY COMMISSION

3

{'3,

E

REGION 11

15

~,

t

n

c.

,,

q

,

.

p 4

101 MARIETTA sT., N.W.. sulTE 3100 '

"

'33

'

$

ATLANTA, G EoRGIA 30303

'3

.

d

4

.....

In Reply Refer To:

0CT 0 91980

-

u,

y

3

=.

RII:MDH _

'

9

x

50-424/80-12

)

g

4

,

Q0-35/10_-12 /

_

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by M. D. Hunt of this office on

September 9-11,

1980, of activities authorized by NRC Construction Permit

Nos. CPPR-108 and CPPR-109 for the Vogtle facility, and to the discussion of our

findings held with K- M. Gillespie at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inst ection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate parc of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

i

4

'

C. E. Murp

, Chi

Reactor Construction and Engineering

I

Support Branch

l

j

Enclosure:

(See Page 2)

!

.

8911seO N

Q

L

_ _ . _ _ _ . . . . _

_ _ . _ - . . . _ . . _ _ _ _ _ _ .

_ . . . .

J

!

.

Georgia Power Company

-2-

OCT o 31880

..

.

Enclosure:

Inspection Report Nos. 50-424/80-12

and 50-425/80-12

cc w/ encl:

K. M. Gillespie, Construction

-Project Manager

E. D. Groover, QA Site Supervisor

D. E. Dutton, Proje et General Manager

.)