Requests Addl QA Info Re Review & Audit of Feb 1973 Operational QA Manual, Sections 3 & 4 & Proposed Tech Specs Submitted on 730405
ML19345A791
Person / Time
Site: Yankee Rowe
Issue date: 06/19/1974
From: Purple R
US ATOMIC ENERGY COMMISSION (AEC)
To: Andognini G
YANKEE ATOMIC ELECTRIC CO.
References
NUDOCS 8011250162
Download: ML19345A791 (4)


Text

$

DISTRIBUTION:

I. Docket AEC-PDR Do.D ORB-1 Reading RAPurple ABurger JUN 191974 STeets ko ol t Docket lio.,50-29 RVollmer SCummings Mr. G. Carl Andognini, Assistant harter to the Vice President Yankee Atomic Electric Company

[R }(l6) 20 Turnpike Road ha" "

Westboro, Massachusetts 01581

,n t y

Dear Mr. Andognini:

We have reviewed Yankee Atomic Electric Company's " Operational Quality Assurance Manual" dated February 1973 and Sections III and IV of the Operational Quality Assurance Manual and proposed technical specifications for review and audit which you submitted by letter dated April 5,1973.

=

We find that the additional infomation, identified in the attachment to this letter, is needed to complete our evaluation of your Quality Assurance Program for the operations phase of the Yankee Rowe Plant.

We request that you provide an original and thirty-nine copies of the additional infomation by July 26, 1974.

z_

We suggest a meeting with Yankee quality assurance personnel to discuss the current Regulatory requirements for an acceptable Quality Assurance Program for the Yankee Rowe Plant.

Sincerely.

. [

Origin 01 Signed by:

nottrt A. Wrph Robert A. Purple, Chief Operating Reactors Branch #1 Directorate of 1.icensing

Enclosure:

Request for Additional Quality Assurance Information for the Yankee Rowe Plant cc w/ encl:

Mr. Donald G. Allen, President Yankee Atomic Electric Company 20 Turnpike Road Westboro, Massachusetts 01581[

L:0R L:0RB-1 g nc e,.

ABurger: esp.

RAPufple

_ 4,_

,c.m,.

/

6/jg/74 6/jg/74....

_,., m,

) n p pq g _

cava

  • lo-m MC.3's mee. 9 53) MC! 0240 i w. s. oo<cewzur.

y Edipr4-tas.4 i ;.j [ 4 ** q 8011250i[2

[

hhk hiiVSNdb,~ m

i

(

(

REQUEST FOR ADDITIONAL QUALITY ASSURANCE INFORMATION

. : ;.Y YANKEE R0WE PLANT

~

YANKEE ATO'4IC ELECTRIC COMPANY DOCKET NO. 50-12 The Yankee Atomic Electric ~ Company's (YAEC) description of its Quality Assurance (QA) Program for Operation for the Yankee Rowe Plant is inadequate because sufficient detailed infonnation was not provided to permit evaluation of how the 18 criteria of Appendix B to 10 CFR 50 are beino

_.j implemented.

~

In accordance with AEC Regulation 50.34 (b) (6) (ii) " Contents of 1

Application:

technical information" YAEC is required to include in the Yankee Rowe FSAR a description of how the applicable requirements of

< = -

Appendix B will be satisfied. Guidance on the required description

=

of a Quality Assurance Program for Operation is contained in the " Orange

=

Book", " Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants", dated October 26, 1973. The description should be submitted in the fonnat of and satisfy the content requirements of Section 17.2 of the " Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants" issued October 1972. The QA Program controls relative.to the activities of operation, refueling, maintenance, modification, and repair must be adequately described.

l The following infomation is required from YAEC to facilitate evaluation of its QA Program for the operations phase of the Yankee Pawe Plant.

1.

Provide current organizational charts which clearly show those individual (s)and/orgroup(s)(both"onsite"'and"offsite")

responsible for implementing all QA related activities required by Appendix B of 10 CFR Part 50 for the functions related to operation, maintenance, repair, modification, and refueling of tM Yankee Rowe Plant.

2.

Describe the duties, responsibilities, and authority of the individual (s) and group (s) identified by the charts above within YAEC for formulating, establishing, and implementing QA related policies, procedures, and instructions for the operational phase of the Yankee Rowe Plant.

3.

Describe the qualification requirements for the individual position that manages, controls, and directs the YAEC QA Program.

= :

C*OCt M s.=w a wr e oatt

  • Terra MC 3 26 Gev. 9-53) AICM 0240 W u. s. GOVERNMENT PRINTING OFFICES 1974 826-150

L

(..

= 4.

Identify the individual (s) and/or group (s) assigned the responsibility g:

and authority to review and approve YAEC's QA Program and QA Manual E.~~

procedures.

5.

Identify the individual (s) w./or group (s) within YAEC who review

[....

and concur with or approve the QA Programs and QA Manuals for major i..eE contractors and vendors.

=

c:

6.

Describe the authority and independence of those individuals or

[

groups within YAEC, both "onsite" and "offsite", who perform the

~

~

QA functions of review, acceptance inspection, and audit.

Include

~

a discussion of stop work authority.

Identify the individual positions a

which have stop work authority and describe the process and procedures for implementation of this QA control function.

L

=E 7.

Describe how the QA Program is documented by written policies, procedures, or instructions and how it will be implemented in accordance with these policies, procedures, or instructions.

Include a listing

~~'

of the QA Program procedures which implement the QA Program for F

operational, maintenance, repair, modification, and refueling activities.

Identify which criteria of Appendix B to 10 CFR Part

.....?

50 each procedure implements.

Include identification of the organiza-5e tions that originate, review, and approve each procedure.

Specifically,

%=~

show the QA interfaces which demonstrate independent review and approval by the QA organization, both "onsite" and "offsite". A demonstration of "offsite" QA guidance and control of the "onsite" QA activities is of particular importance.

8.

Describe the fomal indoctrination and training program which has been or will be established for all those personnel performing QA related activities in accordance with the criteria of Appendix B of 10 CFR Part 50.

If a formal training program does not exist which includes all personnel performing QA related activities, provide a date for implementation. The purpose of this training program is

=

to assure proficiency of implementation of QA procedures and requirements and changes thereto in accordance with Appendix B to 10 CFR Part 50.

9.

Provide a list of the safety related structures, systems, and components of the Yankee Rowe Plant controlled by the QA Program.

10.

Describe those provisions within YAEC's QA Program for the Yankee Rowe Plant which demonstrate compliance with the guidance presented in the '!0 range Book", " Guidance on Quality Assurance Requirement During the Operations Phase of fluclear Power Plants", dated

+

Cctober 26, 1973.

Commit to the Regulatory Guides and Af;SI Standards contained within the " Orange Book" or identify any 1"5 exceptions to this guidance and describe acceptable alternates "T

and justifications.

mue s

(.

/

3-t::.

11.

Describe those provisions which assure that all responsible organiza-tions and individuals are infomed that quality policies, manuals, and procedures are mandatory requirements which must be implemented and enforced.

12. Describe those provisions which provide for management to regularly assess the scope, implementation, and effectiveness of the YAEC QA Program for the Yankee Rowe Plant to assure that they are meaningful and effectively complying with the YAEC policy and with 10 CFR 50 Appendix B.
13. Amend the audit description listing presented in YAEC's " Operational Quality Assurance Manual" description, dated February 1973, to include b

the proposed frequency of report distribution and organizational positions

[

perfoming the audits.

If need be, update this listing.

=