Responds to 740104 Request That ECCS Analysis Be Submitted for Evaluation by 750101.Cycle 11 Contains Four Stainless Steel Clad Assemblies Not in Limiting Power Locations. Analysis of Cycle 11 Will Be Performed Prior to 750101
ML19345A789
Person / Time
Site: Yankee Rowe
Issue date: 05/30/1974
From: Vandenburgh D
YANKEE ATOMIC ELECTRIC CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
WYR-74-2, NUDOCS 8011250156
Download: ML19345A789 (3)


Text

l.

Tshphons bl7 366-90ll tvx 7tO-3 90-0739 YANKEE ATOMIC ELECTRIC COMPANY WYR 74-2 C

77 k' Ym$&

)

20 Turnpike Road Westborough, Massachusetts 01581

.~

meJs t

May 30, 1974 s,.y

.,3 0!

9 s![im bi i;

197.l. (;

jh. '

Mr. A. Giambusso, Deputy Director for Reactor Projects i,

i g[7

y

'y/

Directorate of Licensing

f-N[)'N

^

, ~%

U.S. Atomic Energy Commission

,7 h'ashington, D.C.

20545

'N

Subject:

ECCS Analyses for Power Reactors Using Stainless Steel Clad Fuel (License No. DPR-3, Docket 50-29)

A 1

C

References:

1) AEC DOL letter to Yankee Atomic Electric Company, g d

May 8, 1974, requesting ECCS Analysis Information 4 uun

  1. q JUN 0 7 1974
2) " Interim Acceptance Criteria for Emergency Core p

Cooling Systems for Light-h'ater Power Reactors",

[fg88 r

AEC Interim Policy Statement, June 19, 1971.

nem utu 4

3) " Yankee Nuclear Power Station Revised Loss of

[ g Coolant Analysis", January 15, 1972.

4) " Yankee Nuclear Power Station Revised Loss of Coolant Analysis for an Isolated Loop", October 26, 1972.

5) 10 CFR 550.46 and Appendix K " Acceptance Criteria for Emergency Core Cooling Systems for Light-h'ater Nuclear Power Reactors", dated January 4, 1974.

Dear Mr. Giambusso:

As you have indicated (I), pursuant to the Interim Policy Statement (2),

we are required to show that the Yankee Nuclear Power Station complies with the criteria and other requirements set forth in that statement by July 1, 1974. To this end, we submitted two reports (3) (4) in January and October of 1972, demonstrating full compliance. h'hile the reactor core did contain some stainless steel clad assemblies, it was conservatively assum-1 in the analyses that the' core consisted entirely of Zircaloy-clad assemblies.

In addition to the requirements set forth in the Interim Policy Statement, you have also requested "that relevant information and supporting analyses, based on the new ECCS regulation (5), be submitted to the AEC for review and REWLATORY DOCKETFILE' CO

~~

8011250/$f r

May 30, 1974 Page 2 evaluation by January 1, 1975".

Cycle XI of the Yankee Nuclear Power Station contains four stainless steel clad assemblies which are not in limiting power locations.

It is our intent to provide the Commission an ECCS evaluation for the Yankee Nuclear Power Station on or before January 1, 197S. Thisevaluagnwillbeperformedinlstrictaccordance with the new ECCS regulations Should you require additional informa-tion on this subject prior to our submittal, please feel free to contact us.

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY

.\\.

D. E. Vandenburgh Vice President

AEC DIST "UTION FOR PART 50 DOCP2T MATEP.L~

R

" o (TE-iPORARY F0?11)

CONTROL NO:

5055

,re-Q-ga rw.,

g.: r,

3,,n h Y,'

,a;

/

FILE: N6C s

FROM:

~*""e dDWnuCF DOC DATE REC'D LTR MEMO PJT OTHE!.

Yankee Atomic Electric Co.

Westborough, Massachu'setts D. E. Vandenburgh 5-30-74 6-7-74 X

TO:

ORIG CC OTER SENT AEC PDR XXX A

DR A. Giambusso 1 signed 39 CLASS t"; CLASS PROP INFO INPUT NO CYS PIC'D DOCKET NO:

XXX 40 50-29 DE3CRIPTION:

ENCLOSURES:

Ltr furn info re ECCS Analysis for Power ACH OWLEDGED Reactors Using Stainless Steel Clad Fuel

.DO NOT REMOVE PLANT Uf.ME : YANKEE-ROWE FOR ACTION /INFORMATION 6-8-74 GMC EUTLER(L)

SCI'JENCER(L)

ZIEMANN(L)

REGAN(E)

W/ C: pics W/ Copies W/ Copies W/ Copics CLA?J,(L)

STOLZ(L)

DICKER (E)

W/ Copies W/ Copies W/ Copies W/ Copies PARR(L)

VASSALLO(L) 13i1GHICN(E) u/ cepic:

17 / C:pic:

/ C:pic:

n/ C:pic:

ICTIEL(L)

,/ PURPLE (L)

YOUNGELOOD(E)

W/ Copiec W/ 9 Copies W/ Copies W/ Copies

-~-.s_

INTEF2;AL DISTRIFUT'G FIG FILE TECH REVTEU DENTON A/T TUD EC I'DR~

ENDRIE GRIMES LIC ASST ERAID'AN CGC, ECOM P-506A SCIE 10EDER G!2 2-IILL DICGS (L)

SALTZMAN B. WRT l'U';I2ING/ STAFF liACCARY KASTNER GEARIN (L)

CASE 12:IG11T BALLARD GOULEOURNE (L)

PLANS Gill:EUSSO PAWLICKI SPANGLER LEE (L)

MCDC:IAID ECYD SHA0 MAIGRET (L)

DUEE v/ Input i

MCCF2 (L)(~~;R)

STELLO ENVIRO REED (E)

INFO DIYCU';G (L)(Fi:R)

EDUSTON ITLLER SERVICE (L)

C. MILES SKOVMOLT (L)

NOVAK DIC12R SHEPPARD (L)

,/GOLLER(L)

/ROSS 10;IGHTON SLATER (E)

RENR EISENH"T P. COLLINS IPPOLITO YOU'.!G ELOOD SMITH (L)

DENISE TEDESCO REGA'i

/TEETS(L)

AOR FILE IG OPR LO3G PROJECT LDR WADE (E)

FILE 6 REGION (3)

LAINAS WILLIAMS (E)

D. THOWS05 (2)

MORRIS EENA20YA

-HARLESS gyngc3 (L).

VOLUiER EXT'?"?.i DIST21rU.C.

Is) 1 - LOCAL rDR

'/

I - TIC (AEER5hTHY)

(1) (2)' 10 }-NATIO'.iAL IJ E' S 1-PDR-SAN /LA/UY I

,/1 - M51C (3"Od*2AN) 1 -;.S LE N E/" T C:,b 529) 1-CE"ALD II.Lil CC.7 1 - ASL3 1-U. Pcn;INGT0", rm E-201 GT ERC0;i? AVE;I 'R!. '?.O I - P. R. DAVIS (.sEROJET NUCLEAR) 1-CGNSULTANT' S 1-AGMCD(Ru th - O:- m i 16 - CYS ACRS 4. C..,

UE'31 ARK / Ell".T /AGLABI Ali EM-B-12 7. GT.

Sent to Lic Asst Teets 6-10-74 1-CCRALD UITI"SCS.. 03NL 1-RD..MULILR.. N CE t 1-3 & M SWISEIROAD, F.= E-201 GT