ML19345A671
| ML19345A671 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 11/20/1975 |
| From: | Heider L YANKEE ATOMIC ELECTRIC CO. |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| WYR-75-133, NUDOCS 8011240503 | |
| Download: ML19345A671 (3) | |
Text
roposed Changa ro. 125 supplrm:nt No. 4 1
_~.... y-
_ y[c Telzphone 617 366-90ll t-~;.
M 750-390 0729 YANKEE ATOMIC ELECTRIC COMPANY WrR,5-122
/ m.Q3 20 Turnpske Road Westborough, Massachusetts 01581
.Ya,u xes, x.
N November 20, 197,5 S'
N '
/l/ [.,j, Enited States Nuclear Regulatory Commission s
Washington, D. C.
20555 s
ya k'.
Attention: Office of Nuclear Reactor Regulation f
& 'L G...'
Y,^.. '
Reference:
(1) License No. DPR-3 (Docket No. 50-29)
(2) Proposed Change No. 125 (July 14,1975)
N :[ -
(3)
Proposed Change No.125, Supplement No.1 (October 10, 1975) --_
(4)
Proposed Change :b. 125, Supplement No. 2 (October 28 1975) 4 (5)
Letter from R. A. Purple to R. H. Groce, dated October 30, 1975 regarding questions on Proposed Change No. 125.
(6)
Proposed Change No. 125, Supplement No. 5 (November 7, 1975)
Subject:
Core XII Analysis Cear Sir:
In response to discussions with the NRC technical review staff on Nove:-ber 14, 1975, the attached response is hereby transmitted to you.
We trust you will find this information satisfactory; however, should ycu desire additional information, feel free to contact us.
d.V 7'/ %
Very truly yours, N'
Q*[
ll,,
' ? ".,,
Yff.
l YANKEE ATOMIC ELECTRIC COMPQ Y
(
'/g 4,
84
- " 'p/
'.'?.
4 ouis H. Heider l
r U Assistant Vice President r
CC".MC:MEALTH OF MASSACHUSETTS) h
~O o
ll o
)ss, COUNTY OF WORCESTER
)
Chen personally appeared before me, Louis H. Heider, who being duly sworn, did state that he is an Assistant Vice President of Yankee Atomic Electric Cc:pany, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Yankee Atomic Electric Company, and that the statements therein are true to the best of his knowledea and belief.
O mN N
Armand R. Soucy Notary Public My Commission Expires September 9, 1977 WO 8011249 [g3 gy
('
~
I
.. ~.
.r m
. u-;
t N*
- N i
l i
i Question:
Ehat is Yankee's inspection program for the Exxon Nuclear Company fuel
)
at the next refueling:
Response
Yankee will conduct a post-irradiation examination of up to 5 of the Exxon reload assemblies during the next two refueling outages. Examinations
{
may also be performed during subsequent outages to insure the satisfactory operation of the Exxon fuel through the highest exposure levels expected.
Specific components to be examined include the top and bottom nozzles, j
the guide bars, the spacers and fuel tubes. The inspection of these components will include visual observations of weld integrity, inspection for distortion and abrasion, observation for bow, crud and discoloration, and other general characteristics to determine the effects of reactor.
operation. The results of these inspections will be evaluated and, if deemed appropriate, integrated into the design efforts for future reloads; any abnormalities observed will be reported tc the NRC within 10 days.
The final results of the inspections will be provided.to Ge NRC within 90 days of the completion of the efforts.
- 'm 4
s, t
A*
O
~
V u
NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL
- (TEMPORARY FORM)
CONTROL NO:
13274
/
I FILE:
a FROM: Yankee Atomic Elec. Co.
DATE OF DOC DATE REC'D LTR TWX RPT OTHER Westborough, Mass. 0158 11-20-75 11-21-75 XX L
F. Feider
- TO:
ORIG CC OTHER SENT NRC PDR XX NRC 3 signed 37 SENT LOCAL PDR XX
~
CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
40 XXX 50-29
~
DESCRIPTION: Ltr notarized 11-20-75 furn Supp
- ENCLOSURES:
Suppl #4 to Porposed Change No.
No. 4 to Proposed Change No. 125' &
125 consists of info on Yankee's inspectios trans the following:
program for the Exxon Nuc. Co. fuel at the next re fueling....
(40 cys enc 1 rec'ad) a iI PLANT NAME: Ycnkee Atomic bo.'~Nof Renloye
~~' -~ -
FOR ACTION /lNFCcRMATION DHL 11-26-75 BUTLER (L)
SCHWENCER (L) ZIEMANN (L)
REG AN (E)
REID(L)
W/ Copies W/ Copies W/ Copies W/ Copies W/ COPIES CLARK (L)
STOLZ (L)
DICKER (E)
LEAR (L)
W/ Copies W/ Copies W/ Copies,
W/ Copies
. PARR (L)
VASSALLO (L)
KNIGHTON (E)
SPIES W/ Copies W/ Copies W/ Copies -
W/ Copies KNIEL (L)
UURf LE (L)
YOUNGB LOOD (E)
LPK B u e /,e9 W/ Copies W(gpopies W/ Copies W/f Uopies -
(
INTERNAL DISTRIBUTION MGflLE)
TECH REVIEW DENTON LIC ASST A/T IND.
..~ - ~ ~ ~
FNRC PDR SCHROEDER GRIMES R. DIGGS (L)
BRAITMAN (CGC. ROOM P 506A MACCARY GAMMILL H.GEARIN (L)
SALTZMAN
. _ LtOSSICK/ STAFF vNIGHT KASTNER E. GOULBOURNE (L)
MELTZ j
CASE FPAWLICKl BALLARD P. KREUTZER (E) m GI AMBUSSO SHAO SPANGLER J. LEE (L)
PLANS BOYD STELLO M. RU3HEROO7(L)
MCDONALD 3
j MOORE (L)
HOUSTON ENVIRO S. REED (E)
CHAPMAN DEYOUNG (L)
NOVAK MULLER IV. SERVICE (L)
DUBE (Ltr)2 n i
SKOVHOLT (L)
ROSS DICKER
- 46. SHEPPARD (L)
E. COUPE <
GOLLER (* ) (Ltr)
IPPOLITO KNIGHTON M. SLATER (E)
PETERSON 1
P. COLLil.S TEDESCO YOUNGBLOOD H. F:AITH (L)
HARTFIELD (2) g
- DENISE J. COLLINS EGAN S. TEETS (L)
KLECKERn; ;
j
,,R E G O P R LAIN AS OJECT LDR G. 'NILLI AMS (E)
EISENHUT
]
FFILE & REGION (2)
BENAROYA Al..
V. WILSON (L)
WIGGINTON.
MIPC VOLLMER 4 A@_ESS R. INGR ' M (L)
].
5 M. DUNCAN W li EXTEi4NAL DISTRIBUTION
- LOCAL PDR Greenf t_ eld, Mass.
- TIC (ABERNATHY) (1)(2)(10) - N ATIONAL LABS 1 - PDR SAN /LA/NY
'i
- NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E.201 GT 1 - BROOKH AVEN NAT LAB 1 - G. ULRIKSON ORNL 1 - ASLB 1 - CONSU LTAN TS 1 - Newton Anderson NEWM ARK /B LUM E/AG BABl AN~
l}
g h ACRS 6 SENT Id [,g,
/,p, c.
QM i
1
~
u J
v