ML19345A669
| ML19345A669 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 07/15/1975 |
| From: | French J YANKEE ATOMIC ELECTRIC CO. |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| WYR-75-75, NUDOCS 8011240492 | |
| Download: ML19345A669 (3) | |
Text
-
G E
T:I:phorn bi7 366-9011
" L* M..
g
~
m 710-390-0739 i
YANKEE ATOMIC ELECTRIC COMPANY m a 's-,s
~
20 Turnpike Road Westborough, Massochusetts 01581
,Ya_}m{n,,e_s i
~
f,- h- }
July 15,1975 ' -
'N'./. s
/ s'.
\\',,%
, -};
u(
l
! ~~ :
i)
' '.. ')
-J United States Nuclear Regulatory Cormission p%
'~
-:l Washington, D. C.
20555 s
M/
.N/
/\\
2.
Attention: Office of Nuclear Reactor Regulation Division of Reactor Licensing y
k
Reference:
License No. DPR-3 (Docket No. 50-29)
Dear Sir:
In response to your request for information concerning licensing activities associated with the next plant refueling, we submit the enclosed attachment. Future annual updates of this type of information will be incorporated into the plant operating report.
We trust the enclosed information is responsive to your request and will aid you in scheduling your activities.
Should you require further information, do not hesitate to contact us.
Very truly yours, i
4 YANKEE A'IOMIC ELECTRIC COMPANY t
/
)
[
i? ig Manager of Operations f
j JLF/kg N
'qi 7 8
Enclosure f2 s
L.3:
'd
/igy-- '1 h
'b ' z_e.
a
\\f:',\\
~Q,]$*'cet jpf,'
v,x
/:
Y.; / /
g ('a/
.l p
.. J l
801124oppy g
J
C O
Refueling Information Request
- ame of facility - Yankee-Rowe Atomic Power Station (50-29) 1.
2.
Scheduled date for next refueling shutdown - October 17, 1975 3.
Scheduled date for restart following refueling - November 30, 1975 1:111 refueling or resumption of operation thereafter require 4.
a technical specif'_ cation change or other license amendment? -
Yes, it will involve changes to both the technical specifications An ant 'ysis of ti e mechanical, thermal-l and operating license.
hydraulic, physics and transient behavior of the fuel reload will be provided.
Scheduled date(s) for subr.itting proposed licensing action and l
5.
supporting information. - A report dealing with all but the los.=
j of ecolant accident will be submitted during the week of July 21, 1975.
A supplement containing the analysis of the loss of coolar '. accident will be submitted abhut September 1, 1975.
Important licensing considerations associated with refueling, e.g.,
6.
new cr different fuel design or supplier, unreviewed design or perforcance analysis nothods, significant changes in fuel design, l
new operating procedures - The reload fuel is an open lattice design supplied by Exxon Nucicar, whereas the reference cycle is a a
canned assembly supplied by Gulf-Unite'd Nuc1 car.
e h
-^-
p.
NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL
?
(TEMPORARY FORM)
~
CONTROL _ cP308 7608 i
j FILE:_
?
Yankee Atoctic Electric Cc eDATE OF DOC D ATE R EC'D LTR TWX RPT OTHER FROM:
I k'estborough, Mass J.L. French 7215-75 7-1,7-75 xxx I
TO:
gge 3-signed SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
50-29 xxxxxx DESCRIPTION:
ENCLOSURES:
1 Ltr trans the following:
Refueling Infor: nation Request p
- d*Jbg' s-,
A. v......v
.a Z _.. -
. _ _.: 0 V E I
PLANT ::AME:
Yankee Rowe FOR ACTIONi!NFORMATION 7-17-75 JGB BUTLER (L)
SCHWENCE R (L) ZIEMANN (L)
REG AN (E)
}
W/ Co:.ies W/ Copies W/ Copics W/ Copies CLARK IL)
STOLZ (L)
DICKER (E)
LEAR (L)
\\'S Copies W/ Copies W/ Copics W/ Copies PARR (L)
VASSALLO (L)
KNIGHTON (E) sms l'N C o. ics
_ h"/ Copies W/ Copics W/ Copies 1:N;EL('.)
FJP.PLE (L)
YOUNGBLOOD (E)
LP:t
}
t'u Copies W/(j'opies W/ Copies
\\W Copies INTERUAL DISTRICUTION
.oi..E TECH REVIEW DEN'fON l.lC ASST A/T IND -
..l s R SCHROEDER G R ii.'.ES R. DIGGS (L)
B R AITM AN vd3 0, T; C3.S P 506A MACCARY G AMidlLI.
H. GEARIN (L)
SALTZMAN GO5St CJ/STAF F KNIGHT KASTNER EcGOULB^ '9NE (L)
MELTZ CAS3 PAWLICK!
BALLARD P. KREUTP.E d (E) i GI A:.'EUSSO SHAO SPANGl 'lM J. LCE (L)
.P L ANS_
s BOYD STELLO M. n-cmc 02(L)
MCOONALD I!.03RE (L)
HOUSTON ENVIRO S. REED (G)
CHAPS.iAN DUBE (Ltrl i
DEYOU' G (L)
NOVAK IRTLIGIT
[M SERVICE (L)
SHEPPARD (L)
E. COUPE SKOVHOLT (L)
ROSS DICKER GOLLEi (L) (Ltr)
IPPOLITO
.KNIG!! TON M. SLATER (E)
PETERSON P. CO L L: :S TEDESCO YOUNGBLOOD H.-SM!TH (L)
HARTFIELD (2)
DE:: SE J.CO'.LIUS GAN S. TEETS (L)
KLECKER E.G O P R LAIN AS JECT LDR G. WI LLI AMS (E)
EISENHUT
[ FILE & 7EGION (2)
BE N A RO A
/M V. WILSON (L s WIGGINTON.
IIIrc VOLLMER
_H AR LESS R. INGRAM (L)
M. DUPO!.M'(yj EXTERNAL DIGTRIGUTION Li/__
[ LOCAL. PDR Grranfis1d Mass TIC (ABERNATI:Y) (d2)(10)- NATIONAL LABS.
1 - PDR SAN /L A/NY
/- NSIC (BUCHANAN) 1 W. PENNINGTON, Rrn E.201 GT 1 -- UROOKliAVEN NAT LAB 1 - ASLR 1 - CONSULTANTS 1 - G. ULRIKSON 0:iNL 1-NEWMARK/B UME/4GBAGI N
~
h N';.-ton A'uferson ACilS -useeiB4p/SENT 1
1]a gMth(M 5 O A.lu BET h
~
~