Forwards Revised Page 509:2 to Proposed Change 116 to Tech Specs,Incorporating Surveillance Requirement for Portions of Safety Injection Sys Re Routine Mechanical Tests
ML19345A461
Person / Time
Site: Yankee Rowe
Issue date: 10/04/1974
From: Vandenburgh D
YANKEE ATOMIC ELECTRIC CO.
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
WYR-74-28, NUDOCS 8011210660
Download: ML19345A461 (3)


Text

'

Propoud Change No. 116

{-

upplcornt No. 2

\\

p T' ' '~~

Telephone bl7 366-900 TW1 710*390 0739 YANKEE ATOMIC ELECTRIC COMPANY ugra ".

k 20 Turnpike Road Westborough, Mossachusetts 0158 E' O d fg [

KE October 4, 1974 United States Atomic Energy Ccemission u g,EGST Washington, D. C.

20545 gig Attention: Directorate of Licensing g

ggcy,

erence:

1) Yankee Atomic Electric Company Proposed Change No. 111, S

Diverse Initiation of Safety Injection g

w'

(/

License No. DPR-3 (Docket No. 50-29)

U

[~3 D

2) Yankee Atomic Electric Company Proposed Change No. 116, N

P Revision of Technical Specifications and Proposed Final 3Jgg > J Safety Analysis Report.

p 3)

Supplement No. 1 to Yankee Atcmic Electric Company Proposed Change No. 116, dated August 30, 1974 d@e

4) Telephone conversation with Mr. Leo McDonough on 9/25/74 A. a..c.</\\

s Sir:

Reference No. 3 transmitted a revised page 509:2, for replacement in the Facility Hazard Sur:: mary Report (FHSR) for the Yankee Atomic Electric Plant at Rowe, Massachusetts.

The revised page incorporated surveillance requirement for portions of the Safety Injection System, reference No. 1.

l In our preparation of the revision, we inadventently used a draft page prepared for submittal to the AEC some years ago. The draft, however, was never formally submitted. We are including with this Supplement a new page 509:2, based on the current page dated 9/15/59, and revised to include the l

surveillance requirement for portions of the safety injection system.

1 We trust you will find this information satisfactory; however, should l

you desire additional information, feel free to contact us.

Respectfully submitted, YANKEE ATOMIC ELECTRIC COMPANY 44k k.

Donald E. Vandenburgh Vice President COMMONWEALTH OF MASSACHUSETTS)

)ss.

COUNTY OF WORCESTER

)

Then personally appeared before me, Donald E. Vandenburgh, who being duly sworn, did state that he is a Vice President of Yankee Atomic Electric Company, that he is duly authorized to file, execute and sign the foregoing request in the name and on the behalf of Yankee Atomic Electric Company, and that the statements therein are true to the best of his knowledge and belief.

10 s o n no dEO f 0J0 my

/[ Armand R. Souc5y Notary Public

509:2 I.

i (I

b rhkh

~

Routine-Mechanical Tests $" IgJ 1 d,

G hgp0 k

iso 4

Centrol Red Serm - Circuit Cheek - Daring plant operation it is All indicatiens that not advisable to nake any tests in the scran circuitry.

are available will be noted at least cnce per shift, and adjustnents will be At no tine will the scran circuitry be discennected made only if necessary.

during operatien.

All red scran tests will be nada during scheduled reactor shutdcwn er during varicus energency shutdcwns.

Safety Injectien Systen - Weekly, during pcwer cperatien, all of the punps and valves of the safety injecticn systen will be operated individ-ually frcu the safety injecticn centrol panel in the centrol reca to determine their serviceability and correct light positien indicaticn. The punps will be operated cnly en by-pass to the safety injectien-shield tank cavity water stcr-Loop fill valves will only be opened with the injection valve closed age tenk.All locked-cpen and Iceked-closed valves cutside the vapor centainer tight.

will be checked at the conclusicn of the tests to verify their correct pcsitien.

Whenever the reacter plant is shutdown and depressurized, the entire s'ysten operatien will be checked by na=al eperatien of the safety injection centrcl Surveillance switch provided en the nuclear secticn of the nain centrol board.

of the Safety Injecticn Actuatien Signal (S!AS) Initiatica Channels will include:

2.

a channel a cenparisen of the separate pressure indicatiens by each shift; 1calibration each refueling by applying known pressures to esch senscr; 3 a sys-ten functienal test each refueling by application of test signals to each channel to verify systen capability; h.

a nonthly operational check of the two centain-cent air pressure switches.

Pressuri:cr Scra-r Systen - In erder to assure reliable performance,

~

the pressuricer surge anc circula:ica spray systens will be tested pariedically, While maintaining nornal cpor-prefecably during the normal startup cperation.

ating conditicns in the nain ecolant systen cnd the pressure control and relief systen, that is with surge spray doenergized,. it is deter:.ined that correct c'rculation spray exists (hand centrol valve initially positiened so as to nain-tain pressuri:cr equilibriun cond'.tiens) by noting fregency of heater cycling Verification of surge spray while maintaining prescurizer at nernal values.

operation will be accenplished by cbtaining naxi=un spray flew and observing the resultant pressurizer pressure decrease, tenperature increase of water flowing threugh the surge line, and c anges in pressurizer heater cycling.

b Pressuricer Solenoid Relief valve - The pressurizer solenoid relief valve, which is prev:.ced to limit tne cuty of the pressuriser safety valves, will be tested after refueling er after cenpletien of =aintenance en this valve.

The set pressure and the bicwdown pressure shall be observed during After the test cperatien and shall be compared with the design conditions.

the valve has discharged, note the dcunstress pipe tenperatures to assure that the valve disc has prcperly rescated.

The stean pressure required to test the solenoid relief valve is ob-tained by operation of the pressuricer heaters.

Scran Alar =s Check Pcints and Instru~entatien Calibration Checks -

In crder to assure safe operaticn of the planc, certain instrumentaticn checks Only those checks that can be nade withcut will be perforned periodically.

No discennecting the scran circuit during plant cparatica vill be perferned.

tests or checks will be nade en any equipnent if there is a pessibility of All eclibration vill be nade before starting er dur-initiating a false scr=.

ing scheduled shutdown periods, except where calibration is required at a power level.

Pros sed Change No. 116

o AEC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)

CONTRO L NO:_.10%B_.__

FILE:

FROM: Yankee Atnmic Electric DATE OF DOC DATE REC'D LTR TWX RPT OTHER Westborough, Mass 0158 10-4-74 10-9-74 7XX D E Vandenbursth TO:

ORIG CC OTHER SENT AEC PDR YY AEC 1 signed SENT LOCAL PDR XX CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXXXX 1

50-29 DESCRIPTION:

ENCLOSURES:

Ltr notarized 10-4-74..trans the following:

Additional Info, Supplement 2, to Proposed change to Tech loecs

  1. 116............

DO NOT RD10VE EI(([$)U 2-(25 cpys enci rec'd)

~~

PLANT N AME: Yankee Rowe FOR ACTION /INFORMATION 10-24-74 ehf BUTLER (L)

SCHWENCER (L) ZIEMANN (L)

REGAN (E)

W' Copies W/ Copies W/ Copies W/ Copies CLAR K (L)

STOLZ (L)

DICKER (E)

LEAR (L)

W/ Copies W/ Copies W/ Copies W/ Copies PAR R (L)

VASSALLO (L)

KNIGHTON (E)

W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) yPUpPLE (L)

YOUNGBLOOD (E)

W/ Copies W$opies W/ Copies W/ Copies INTERNAL DISTRIBUTION LE TECH REVIEW DENTON llc ASST A/T IND to ev GRIMES BRAITMAN GC, ROOM P 506A SCHROEDER GAMMILL DIGGS (L)

SALTZMAN UNTZING/STAF F MACCARY KASTNER G6ARIN (L)

8. HURT CASE KNIGHT BALLARD GOULBOURNE (L)

GI AMBUSSO PAWLICKl SPANGLER KREUTZER (E)

PLANS BOYD SHAO LEE (L)

MCDONALD MOORE (L) (BWR)

STELLO ENVIRO M AIG RET (L)

CHAPMAN DEYOUNG (L) (PWR)

HOUSTON MULLER REED (E)

DUBE w/ input SKOVHOLT (L)

NOVAK DICKER SERVICE (L)

E. COUPE

/GOLLER (L)

ROSS KNIGHTON SHEPPARD (L)

P. CO LLINS IPPOLITO YOUNGBLOOD SLATER (E)

D. THOMPSON (2)

DENISE TEDESCO REGAN SMITH (L)

KLECKER PRO.

TEETS (L)

EISENHUT

/Nul LECT LDR f EG OPR LONG le.,P (

WILLI AMS (E)

/ QM HA R LESS.2.)

FTLE & REGION (3)

LAIN AS WILSON (L)

MORRIS BENAROYA STEELE VOllMER EXTERN AL DIST RIBUTION k"

1 LOCALPDR TIC (ABERNATHY) (1)(2)(10) - N ATION AL LABS 1 - PDR-SAN /LA/NY

- NSIC (BUCHAN AN) 1 - ASLBPIE/W Bldg. Rm 529) 1 - BROOKHAVEN NAT LAB 1 - ASLB 1 - W. PENNINGTON, Rm E 201 GT 1 - G. U LRIKSON, O RN L 1 - Newton Anderson 1 - B&M SWINEBROAD, Rm E 201 GT 1 - AGMED (RUTH GUSSMAN) v'117-ACRS HOLDING SM T8 1 - CONSU LTANTS Rm B 127 GT 3.ac. A ss7' 51 *f f er 1 N EWM AR K/BLUME/AGB ABI AN 1 - R. D. MUELLER, Rm E-201 4