ML19345A280

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-029/75-17 on 751207-11 No Noncompliance Noted
ML19345A280
Person / Time
Site: Yankee Rowe
Issue date: 01/06/1976
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML19345A281 List:
References
NUDOCS 8011180550
Download: ML19345A280 (2)


See also: IR 05000029/1975017

Text

_

..A

'

.

UNITED STATES

'

NUCLEAR REGULATORY COMMISSION

REGIONl

439 PARK AVENUE

KING of PRUSSI A. PENN5Yt.VANI A 19404

JNi 0

G6

Yankee Atomic Electric Company

License No. DPR-3

Attention:

Mr. Robert H. Groce

Inspection No. 75-17

Licensing Engineer

Docket No. 50-29

20 Turnpike Road

'teotborough, Massachuset ts

01581

.

Gentlemen:

This refers to the inspection conducted by Mr. J. Durr of this office on

December 7-11, 1975 at Rowe, Massechusetts of activities authorized by

NRC License No. DPR-3 and to the discussions of our findings held by

Mr. Durr with Mr. H. Autio of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

.

'

examinations of procedures and representative records, interviews with

. personnel, and observations by the inspector.

"ithin the secpc of this inspection, no itc a of noncompliance were

obseryed.

In accordance with See: ion 2.790 of the NRC's " Rules of Practice",

Part 2,-Title 10, Code of Feoeral Regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you

(or your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application cust

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

'

$o\\,uTIOL,.

- - . ,

N

~*

t

  • .

y

9 *t A

h.

U?6 *19N

18.0111go f E

.

_2_

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss

them with ycu.

Sincerely,

f .t

._

/i:02 la (. > S h M

Reiert T. Carlson, Chief

Reactor Conctruction and Engineering

Support Branch

Enclosure:

IE:I Inspection Report No. 50-29/75-17

cc:

H. Autio, Plant Superintendent

Donald G. Allen, Pre',ident

bec:

IE Mail 6 Files (For Appropriate Distribution)

PDB

Local PDR

NSIC

,

TIC

REG:I Reading Foon

P.cpion Directors (II, III, IV)(Report only)

State of Massachusetts

-

-

-- .

1