ML19345A276
| ML19345A276 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Dresden, Palisades, Oyster Creek, Haddam Neck, Ginna, San Onofre, Yankee Rowe, La Crosse, Big Rock Point |
| Issue date: | 09/21/1978 |
| From: | Desiree Davis Office of Nuclear Reactor Regulation |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8011180486 | |
| Download: ML19345A276 (12) | |
Text
I I
pm "c%
g-fo, usireO srArts
., c;}) e f j NUCLEAR REGULATORY COMMisslON y
WASHINGTON. D. C. 20555
'S,
/
September 21, 1978 Docket Hos. 50-29, 50-244 50-409, 50-219, 50-213, 50-255, 50-155, 50-245 MEMORANDUM FOR:
D. G. Eisenhut, Assistant Director for Systems
& Projects, DOR FROM:
D. K. Davis, Chief, Systematic Evaluation Program Branch, D0R
SUBJECT:
SYSTEMATIC EVALUATION PROGRAM (SEP) SCHEDULE MEETINGS WITH INDIVIDUAL LICENSEES On July 18,19, and 20,1978, meetings were held between the hRC staff and representatives of the following SEP utilities:
Date Licensee Facility Docket 8 7/18 Yankee Atomic Electric Yankee Rowe 50-29 7/19 Rochester Gas & Electric Ginna 50-244 7/19 Dairyland Power Cooperative La Crosse 50-409 7/19 Jersey Central Power & Light Oyster Creek 50-219 7/20 Ccnnecticut Yankee Atomic Haddam Neck 50-213 7/20 Consumers Power Palisades 50-255 7/20 Consumers Power Big Rock Point 50-155 7/20 Northeast Nuclear Energy Millstone 1 50-245 7/25 Comonwealth Edison Dresden 1 & 2 50-10 &
50-237 7/27 Southern California Edison San Onofre 1 50-205 The meetings were called to discuss the scheduling of SEP activities and to infonn the licensees of reviews which are anticipated to be initiated shortly and may require substantial licensee effort. Attendance lists for eacn of the meetings are attached.
8011130 g 6
..=-
y --
~
u
!' T :'.
2-September 21, 1978 D. G. Eisenhut y
- ~. ' 7.
J Licensee coments on the draft SEP schedule book were received. Major
== J comments, which will be corrected during the course of future book revisions, are:
- = 1. -
l 1.
book difficult to read, logic hard to follow
== :S 2.
difficult to determine when licensee input is required or when
- ]
licensee will be expected to review documents 3.
schedules for topic reviews should be plant-specific, not generic as shown now g;
4.
many minor changes to the schedule book will be incorporated as a result of licensee coments.
=
l Tha NRC response to the SEP Owners Group suggestions for documentation
.=s=
procedures was given to the licensees, as was the staff doctanentation b.==
of seven topics considered essentially complete by the staff. The g==r staff requested that the licensees review these documents and provide any coments to the Project Manager.
[.:. --.
The staff also requested that each licensee review the infomation
[
~
regarding leak detection systems to assure the information describing each facility was current and correct. Some licensees were also re-g =. '
quested to review information regarding seismic and quality group
- . ~ %
classifications and were asked to provide additional infomation in certain areas.
[
r Each topic discipline manager (reactor systems, electrical /instrumenta-tion and control, mechanical / materials, seismic, structural, plant
=;
systems, and site hazards and radiological) presented the schedule 4
i for review and outlined the effort which would be required from the l
licensees. Two areas of concern were unifomly noted by each licensee.
Both topics (seismic review and pipe break inside containment) may require substantial effort from licensees. Because of the need for cooperation in the perfonnance of these reviews and the need for joint
}. ~ ~
discussion of review guidelines and data, and because of the probable
~
availability of additional infomation not presently docketed, the staff p.....
. suggested'that individual licensee meetings be scheduled in the near
[1; future to-discuss the two topics in detail.
j p.=
==
--i&
(
.y?-
1
%v,.*+-
?e-gp.a7v--+t w
~-3 w-
- + =
- r 60' C
/
g-SEPTEMBER
- 1 1970 Each licensee presented to the staff a list of topics which were either not applicable to the particular facility or which, in the licensee's opinion, could be resolved quickly and with minimal effort on the part of the staff and the licensee. This dis:ussion also covered any ongoing licensing actions which could possibly have an impact on the SEP review and schedule.
The staff requested that licensees be aware that, although credit say eventually be allowed for non-safety-related systems in lieu of safety-related systems or to impmve safety margins such sredit could not be untiaterally assumed by the licensee without prior NRC review and approval.
The staff concluded by stressing that licensee input is both valued and necessary.
Origkial signed by peg K. Davis Don K. Divis, Chief Systematic Evaluation Program Branch Division of Operating Reactors Attachments:
As stated cc:
See attached
'//Y./
t DOPQPC/S&P DOR:0RB #2 g Q gj3gp g
p DKDavis: rj
~ DLZiemann RPSnaider Ak,q ratr >
)
b N
' C TOFJi 318 (9 76) NRCM C240 W u. s. novaa=wrar painri=a orrice. eve - eausa
[
=
D. G. Eisenhut September 21, 1978
=
Each licensee presented to the staff a list of topics which were either
=
not applicable to the particular facility or which, in the licensee's opinion, could be resolved quickly and with minimal effort on the part 3C of the staff and the licensee. This discussion also covered any ongoing licensing actions which could possibly have an impact on the SEP review and schedule.
The staff requested that licensees be aware that, although credit may eventually be allowed for non-safety-related systems in lieu of safety-related systems or to improve safety margins such credit could not be unilaterally assumed by the licensee without prior NRC review and approval.
The staff concluded by stressing that licensee input is both valued and necessary.
t I
l Don K. [hvis, Chief Systematic Evaluation Program Branch f"
Division of Operating Reactors Attachments:
As stated CC:
See attached
'l
ATTENDANCE LIST i
YANKEE R0WE 7/18/78 9.i-N. Anderson, NRC/ DOR /SEPB K. Jabbour, NRC/ DOR /SEPB
=:-
F. B. Litton, NRC/ DSS H. Fontecilla, NRC/ DOR /SEPB P. A. DiBenedetto, NRC/ DOR /SEPB R. Snaider, NRC/ DOR /SEPB H. Levin NRC/ DOR /EB R. Schaffstall, KMC J. McEwen, KMC A. Burger, NRC/ DOR / ORB #2
..s H. Schierling, NRC/ DOR /SEPB G. Bagchi, NRC/RES P. Sobel, NRC/DSE A. Cardone, NRC/DSE D. Mcdonald, NRC/ DOR /SEPB i:.
T. Kohli, EES, Inc.
i :.
S. Bryan, NRC/ DOR /SEPB h.
R. Rumble. LLL D. A. Hansen, Yankee Atomic 7~-~ '
D. K. Davis, NRC/ DOR /SEPB i
T. Greene, NRC/ DSS /CSB E~
E. W. Roberts, EG&G
\\;
L f
a.'
l t
')
ATTENDANCE LIST GINNA 7/19/78 O. K. Davis, NRC/ DOR /SEPB N. Anderson, NRC/ DOR /SEPB B. Saffell, EG&G R. Schaffstall, KMC G. Wrobel, RG&E R. E. Smith, RG&E R. C. Mectedy, RG&E J. Shea, NRC/ DOR /0RB #2 G. Bagchi, NRC/RES J. Arthur, RG&E E. Cohen. LeBoeuf, Lamb, Leiby & MacRae K. Jabbour, NRC/ DOR /SEPB D. Mcdonald, NRC/ DOR /SEPB E. W. Roberts.EG&G R. Colmar, NRC/ DOR /PSB D. L.'Ziemann, NRC/ DOR / ORB #2 H. Fontecilla NRC/ DOR /SEPB
::T' i
.i i
1 p-y-
y 9
9
-T
>g y
_ _l ATTENDANCE LIST LA CROSSE
==
-7/19/78 R. P. Snaider, NRC/ DOR /SEPB P. A. DiBenedetto, NRC/ DOR /SEPB W. T. Russell, NRC/00R/0RB #2
~
J. D. Parkyn, Dairyland Power R. Milos, NES, Inc.
=
S. Ramos, NRC/ DOR /0RB #4
- r-J. W. Taylor, Dairyland Power R. E. Shimshak, Dairyland Power N. Anderson, NRC/ DOR /SEPB E. Tremel, Dairyland Power H. Schierling, NRC/ DOR /SEPB -
=
K. Jabbour, NRC/ DOR /SEPB G. Bagchi, NRC/Research S. Bryan, NRC/ DOR /SEPB T. Kohli, EES, Inc.
=2 H. Fontecilla, NRC/ DOR /SEPB W. Roberts, EG&G R. Rumble. LLL
@s
/
==
'd.
ATTENDANCE LIST OYSTER CREEK 7/19/78
' R. P. Snaider, NRC/ DOR /SEPB D. K. Davis, NRC/00R/SEPB K. Jabbour, NRC/DCR/SEPB H. Schierling, NRC/ DOR /SEPB J. Knubel, Jersey Central T. Tipton, Jersey Central W. R. Schmidt, MPR Associates J. McEwen, KMC P. O'Connor, ORB #2 R. J. Kiessel, DSS /MEB J. R. Rayan, DSS /MEB P. A. DiBenedetto, NRC/ DOR /SEPB D. Shum, NRC/ DOR /PSB T. Greene, NRC/ DSS /LSB W. Roberts, EG&G H. Fontecilla, NRC/ DOR /SEPB N. Anderson, NRC/ DOR /SEPS
- 0. Mcdonald, NRC/ DOR /SEPB S. Bryan, NRC/ DOR /SEPB
=
G. Baschi, NRC/ DOR /SEPB F
e w -
- A i
1
~^
==
- f,-
- -==
t-".:r '.
U ;;.
ATTENDANCE LIST
="
BIG ROCK POINT & PALISADES 7/20/78 ai=
i.=r--
S. Bryan, NRC/ DOR /SEPB
==
B. Beckius, Consumers Power J. Beer, Consumers Power
=
J. Shea, NRC/ DOR / ORB #2 D. Bixel, Consumers Power
~
J. McEwen, KMC.
.l~"
..2..
H. Schierling, NRC/ DOR /SEPB G. Sagchi, NRC/RES D. Mcdonald, NRC/ DOR /SEPB
- s::
K. Jabbour NRC/ DOR /SEPB
- ==.
H. Fontecilla, NRC/s0R/SEPB zw==
N. Anderson, NRC/ DOR /SEPB
~ J.yj:
~
- E '":
T. Kohli, EES, Inc.
!!E:=
j W. Roberts. EG&G is R. Rumble, LLL
[2 i
- f. = :,
E b
44 f,
in e
4 i
=:
a
~l. :
4
'I
,l a
..j
.L:.
~
+
'.7 "
ATTENDANCE LIST HADDAM NECK & MILLSTONE 1 7/20/78 4
K. Jabbour, NRC/ DOR /SEPB N. Anderson, NRC/ DOR /SEPB R. Rumble, LLL H. Fontecilla, NRC/ DOR /SEPB B. Ilbenman, NUSCO W. Russell, NRC/ DOR / ORB #2 R. Schaffstall, KMC B. Saffell, EG&G H.~Schierling, NRC/ DOR /SEPB D. Mcdonald, NRC/ DOR /SEPB G. Bagchi, NRC/RES T. Kohli, EES, Inc.
R. L. Guinness, NUSCO-1~ ~ :
9 4
U.
- =
ATTENDANCE LIST DRESDEN UNITS 1 & 2 7/25/78
=.. -
P. O'Connor, NRC/ DOR /0RB #2 J. Wujciga CECO /D-2 R. Jungk, CECO /D-1 N. Smith, CECO /SNED J. White, CECO /SNED P. Clark, CECO /NSC J. Abel, CECO /SNED M. Turbak, CECO /SNED R. Janacek, CECO /SNED J. McEwen, KMC G. Bagchi NRC/ DOR /SEPB M. Fletcher, NRC/ DOR /SEPB K. Jabbour, NRC/ DOR /SEPB D. Davis, NRC/ DOR /SEPB D. Mcdonald, NRC/ DOR /SEPB H. Schierling, NRC/ DOR /SEPB H. Fontecilla, NRC/ DOR /SEPB e
e
i
~
ATTENDANCE LIST SAN ONOFRE UNIT 1 7/27/78
= -
- =-
== :. -
~ n.2=r
=2
.. Marsh, NRC
.i. Anderson, NRC
..=
- 0. Nunn, SCE M. Wilber, NRC/IE
..?
W. Moody, SCE
~"
=
J. Rainsberry, SCE P. H. Renseyres, SCE L. A. Watson, NRC J. C. Sarenson, SCE C. A. Carossino, SCE
=.:=.
.M. P. Short, SCE G. T. McLandrich, SCE
- .:::.::=::
R. P. Rumble, LLL
=::=:
G. Krellenstein, NRC J. Reeder, SCE
.=
O O
o
,v-S i
=.
i O
.y.-
,_c
-m..-c r.,c4..~
m
MEETING
SUMMARY
DISTRIBUTION 50-206 Mets 50-29, 50-244, 50-409, 50-219, 50-213, 50-255, 50-155, 50-245,-50-10,150-237 NRC PDRs n
SEP Reading NRR Reading E. G. Case V. Stello B. Grimes T. Ippolito J. Arthur, RG&E R. Reid E. Cohen, LeBoeuf, Lamb, Leiby, MacRae G. Knighton R. Colmar, 00R V. N6onan J. D. Parkyn Dairyland Power D. Eisennut R. Milos, NES, Inc.
A. Schwencer S. Ramos, ORB #4 D. Ziemann J. W. Taylor, Dairyland Power D. X. Davis R. E. Shimshak, Dairyland Power G. Lainas E. Tremmel, Dairyland Power P. Check J. Knubel, Jersey Central T. J. Carter T. Tipton, Jersey Central L. Scinto, OELD W. R. Schmidt, MPR Associates 01&E (3)
R. J. Kiessel, MEB H. Smith J. R. Rayan, DSS 1
~
R. Fraley, ACRS (16)
D. Shum, PSB T. B. Abernathy B. Ilberman, NUSCO J. R. Buchanan R. L. Guinness, NUSCO SEPS Members (10)
T. Marsh, NRC J. McEwen, KMC D. Nunn, SCE Licensees M. Wilber, I&E ORB !2 Branch Members W. Moody, SCE F. B. Litton, DSS J. Rainsberry, SCE H. Levin, EB P. H. Renseyres, SCE R. Schaffstall, XMC J. C. Sarenson, SCE J. McEwen, KMC C. A. Carossino, SCE P. Sobel, DSE M. P. Short, SCE A. Cardone, DSE G. T. McLandrich, SCE T. Kohli, EES, Inc.
J. Reeder, SCE R. Rumble LLL J. Wujciga, CECO /D-2 D. A. Hansen, Yankee Atomic R. Jungk, CECO /D-1 T. Greene, DSS N. Smith, CECO /SNED E. W. Roberts, EG&G J. White, CECO /SNED B. Saffell, EG&G P. Clark, CECO /NSC G. Wrobel, RG&E J. Abel, CECO /SHED R. E. Smith, RG&E M. Turbak, Ceco /SNED R. C. Mectedy, RG&E R. Janacek, CECO /SNED H. Denton
.