ML19345A271

From kanterella
Jump to navigation Jump to search
Forwards Technical Rept on Densification of LWR Fuels. Requests Analyses & Data for Determining Fuel Densification Consequences & Effects on Normal Operation,Anticipated Transients & Accidents,Including Loca.W/O Encl
ML19345A271
Person / Time
Site: Yankee Rowe
Issue date: 11/21/1972
From: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
To: Vandenburgh D
YANKEE ATOMIC ELECTRIC CO.
References
NUDOCS 8011180441
Download: ML19345A271 (2)


Text

si.

o._.

._._.....____m.....

t

{

bC E'

~

I

,g%y

?.

W

\\

u, nt; 2

NOV 2 D1972 f

Docket No. 50-29

$t.

t Ry Yankee Atomic Electric Conpany "h

NITh "r. Donald E. Vandenburs Vice PIncident 20 Tumpike Ibad kbstboro, Massachusetts 01581 Gentlemen:

The Co:mlission's &gulatory Staff has completed a Inview of fel L

3 densification and its effect on reactor cperation including transients and postulated loss-of-coolant accidents. She Staff's investications and calclusions are Inported in "1bchnical Ibport ai Densification of Li@t Water Pcactor Fuels" dated Novenber 14, 1972, a copy of which d< - :

is enclosed for your infornation and guidance. This report concludes that densification of fel may occur and that the resulting fon:ation LT of Ibal coltr::n gaps should be anticipated in all light water Inactor f

fuels. She report also provides the essential elemnts to be included g%

in calculational models used to account for the effects of fuel den-dj sification.

[:bY Nh

/.s we have indicated in our letter to you dated October 4,1972, the Mt Pegulaton Staff believes that the fuel in the Yankee Nuclear Poser ff-Station is susceptible to densification. We Inquest that your pending submittal include the necessan analyses and oth'r inlevant data for datencining the conseqences of densification and the effects on non-RV N.I mal o;>2 ration, anticipated tninsients, and accidants including the pos-3 tulated loss-of-coolant accid 2nt, consjeter;J with the.c uidance pInvided 3

in the enclosed report.

If the analyses indicate that changes in de-7 sign or operating conditians are necessan to maintain required mrgins, Q ?

you should submit proposed changes and operating limitations with the analyses.

'~

yi N

In order that the Pegulaton Staff can conduct an expeditious and Cn orderly review cf these matters for the Yankee Nuclear Pomr Station,

%y we request that you submit the analyses and additional inforration

!gg l;NL:

j d;'

~:v j ~'

y

.80111 " N

~

a:

4

g g

=

4 1

A L

Yankee Atomic Electric NOV 2 01972

![

l Capany within 45 days from the date of this letter. It is requested that II:

I this inforcation be pInvided with one signed original and thirty-nine additional copies.

. j 1.

sincerely, a

FUriginsi signed by'

~

A.r,ie-'-

uut A. Giambtr.sso, Deputy Director

'.s' for Feactor Projects 92 Dizvctorate of Licensing

- p 7

(

r

Enclosure:

f Y

Technical Peport on Densification (November 14',1972) 12-a r

^

Distribution

. T.,

i Dacket File.,_

.-9 ACRS (16)

HQ PDR D. J. Skovholt T. J. Carte" R. J. Scheml A. Burger S. A. Teets F2 Reading L Reading Branch Reading J. R. Buchanan, OE4L i

w T. W. laugn11n, DITE St R0(3) la Kauf:ran, OGC y

D. Knuth, L:PS (2) d R. Ibdesco, L:CS (2)

S. D. PacKay, IDR-1 4.

,z w

hq N

cy,,c,,lL:OR-1 L:0R-1 L:0R-1 lL:0R.

L:RP

[

PJ 1

DJ AGi o

_., ABuiger

__7 SD.' "

d

_..,1vuna j.. lusna int-n2 ive2 nen2 c.u. !

1 t

i,

~T-uc.m m....m ucuom r

__