ML19345A010
| ML19345A010 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/29/1980 |
| From: | Jay Collins Office of Nuclear Reactor Regulation |
| To: | Harold Denton, Snyder B Office of Nuclear Reactor Regulation |
| References | |
| CON-NRC-TMI-80-129 NUDOCS 8009150532 | |
| Download: ML19345A010 (4) | |
Text
..
1 Yi j,,
g>m Alciq
' UNITED STATES '
y,
(%,
NUCLEAR REGULATORY COMMisslON
,[
j.],-
WASHINGTON. D. 20$$5
{#g C+
August 29, 1980 NRC/TMI-80-129 MEMORANDUM FOR:
H. R. Denton, Director, Office of Nuclear Reactor Regulation B. J. Snyder, Program Director, TMI Program Office FROM:
J. T. Collins, Deputy Program Director, TMI Program Office
SUBJECT:
NRC TMI PROGRAM 0FFICE WEEKLY STATUS REPORT Enclosed is the status report for the' week of August 24-29, 1980.
I Q
i
, f. ~l..
. L ' - :. i....
' John T. Collins Deputy Program Director TMI Program Office
Enclosure:
As stated cc:
{
Comissioner's Technical Assistants NRR Division Directors g
NRR A/D's Regional Directors IE Division Directors X00S X0MA r
HEW.
EPA.
RO&NS Branch Chief, Region I Public Affairs, Region :I T. Elsa:,ser TMI Program Staff 1
i k
o 84091 5_0 63j
!i
C NRC TMI PROGRAM 0FFICE WEEKLY STATUS REPORT Week of August 24-29, 1980 Plant Status Core Cooling Mode:
Cyclic natural circulation in tia "A" reactor coolant
' system (RCS) loop via the "A" once through steam generator (OTSG), steaming to the main condenser, and RCS loop-A and 8 cyclic natural circulation to-reactor building ambient.
1 Available Core Cooling Modes: 0TSG "B" to the main condenser; icag-tenn cooling "B" (OTSG-B); decay heat removal.
RCS Pressure Control Mode: Standby Pressure Control (SPC) System.
Backup Pressure Control Mode: Makeup system in conjunction with letdown flow (Emergency use only due to suspected leaks in the seal injection system).
Major Parameters (As of 0500, August 29,1980) (approximate values)
Average Incore Thermocouples:
138 F Maximum Incore Thermocouple:
183*F RCS Loop Temperatures:
A B
' Hot Leg ~
135 F 137 F Cold Leg (1) 85*F 80*F (2) 84 F 83 F RCS Pressure:
95 psig (DVM)
Pressurizer Temperature: 90 F Reactor Building:
Temperature:
84*F Water level: Elevation 290.4 ft. (7.9 ft. from floor) via penetration 401 manometer-Pressure:
-0.4 psig (H ise)
Concentration:
1.4 x 10- uCi/cc (Kr-85)
Environmental & Effluent Information 1.
Liquid effluents from TMI-l released to the Susquehanna River, after processing, were within the limits specified in Technical Specifications.
2.
No liquid effluents were discharged from TMI-2.
3.
Results from EPA monitoring of the environment around the TMI site were:
4 l
2 The EPA measured Kr-85 concentrations (pci/m3) at several 1
environmental monitoring stations and reported the following results:
~
Location
@ gust 15-22,1980 (pC1/mJ)
Bainbridge 30 Goldsboro 28 Observation Center 33 Middletown 27 Hill Island 26 All of the above levels of krypton-85 are considered to be background levels.
EPA environmental stations registered background levels for air particulate and water samples.
Gama scan results for all sampling locations were negative.
4.
NRC Environmental Data The following are the NRC air sample analytical results for the onsite continuous air sampler:
I-1 31 Cs-137 Sample Period (uCi/cc)
(uCi/cc)
HP-230 August 20 - August 27, 1980
<6.7 E-14 <6.7 E-14 5.
Radioactive Material and Radwaste Shipments were as follows:
On Monday, August 25,1980, a 40 ml Unit 2 reactor coolant sample was shipped to Babcock & Wilcox (B&W), Lynchburg, Virginia.
On Wednesday, August 27, 1980, smear samples and various samples of glass and metal from the Unit 2 containment entry on August 15, 1980, were shipped to Exxon Nuclear Laboratories, Idaho Falls, Idaho.
-On Thursday, August 28, 1980, one shipment of Unit I non-compacted waste was sent to Chem-Nuclear System, Incorporated, Barnwell, South Carolina.
Major Activities 1.
EPICOR II System The system is presently in an outage condition.
Startup of this system is expected to occur next week.
t I
l
~
i
d.
3 2.
Reactor Building Status Purging of the reactor building was not accomplished this week due to the relatively low currie content.
3.
Mini Decay Heat (MDH) System Preoperational testing'of the MDH pumps started this week. System operational readiness date was not finalized.
Meetings Held 1.
- 8. Snyder and J. Collins conducted a news conference at 10:30 a.m.,
on Monday, August 25, 1980, in the NRC Middletown office to discuss and answer questions about the staff's draft Programmatic Environ-mental Impact Statement (PEIS) for the decontamination and defueling of TMI-2.
2.
On Thursday, August 28, 1980. J. Collins was interviewed by radio station WKBO, Harrisburg, cracerning the staff's PEIS.
The program will be aired on Sunday, ".agust 31,1980, at 8:30 a.m. as part of the station's public service program.
Future Meetings 1.
On Wednesday, September 3,1980, J. Collins and B. Snyder will brief local elected officials, citizens, and the press on the i
contents of the PEIS. The meeting is being hosted by the PA l'
Department of Environmental Resources and will be held at the Forum j
Building, Harrisburg, beginning at 9:00 a.m..
Representatives of i
EPA will also be in attendance at this meeting.
j 2.
On Friday, September 5,1980, J. Collins and EPA representatives will brief members of the Susquehanna River Basin on the contents of the PEIS.