UNITED STATES
'^
E
NUCLEAR REGULATORY COMMISSION
n
,
O
aa
REGION lil
8
799 ROOSEVELT ROAD
GLEN ELLYN. ILLINOIS 60137
s
DUL 2 S wy
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. Richard P. C:ouse
Vice President
Nuclear
Edison Plaza
~300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the inspection conducted by Mr. K. D. Ward of this office on
July 8-9, 1980, of activities at Davis-Besse Nuclear Power Station, Unit 1,
authorized by NRC Operating License No. NPF-3 and to the discussion of our
findings with ifessrs. J. D. Lenardson and C. T. Daft at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the en-
closed inspection report will be placed in the NRC's Public Document Room,
except as follows.
If this report contains information that you or your
contractors believe to be proprietary, you must apply in writing to this
office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure. The application must include
a full statement of the reasons for which the information is considered
proprietary, and should be prepared so that proprietary information iden-
tified in the application is contained in an enclosure to the application.
i
8009150 y
__
..
p -:
,
'
Toledo Edison Company
- 2-
g g3
We will gladly discuss any questions you have concerning this
.
inspection.
. .
Sincerely,
e
A
r __
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
,
Enclosure:
IE Inspection
Report No. 50-346/80-21
cc w/ enc 1:
Mr. T. D. Murray, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Harold V. Kohn,. Power
Siting Commission
Helen W. Evans, State
of Ohio
.
Y
J
,
'
e
~
.
5-
w
g
gy
e
e
g.
g ,
, , - - ,
7-
-= .
y--p
g
--y99er-.e-p
p
e---
-e>v+*-vs-t-*'
-