ML19344F378

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Deviation Noted in QA Program Insp Rept 99900109/80-01.Requests Addl Info
ML19344F378
Person / Time
Issue date: 06/02/1980
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mueller A
PITT-DES MOINES, INC. (FORMERLY PITTSBURGH-DES MOINES
Shared Package
ML19344F374 List:
References
REF-QA-99900109 NUDOCS 8009150200
Download: ML19344F378 (1)


Text

-

m

')

UNITED STATES

/pA 880 %,

NUCLEAR REGULATORY COMMISSION

[

)

..7,. '* 6 1 }

611 RY AN P 0 IVE. SulTE 1000 AnUNGTCN. TEXAS 76012

% 7f, JUN 02 sto Occket No.

99900109/80-01 Pittsburgh-Des Moines Steel Co.

Eastern Division; Neville Island At*m: Mr. A. J. Mueller QA Manager Neville Island Pittsburgh, PA 15225 Gentlemen:

Thank you for your letter of May 20, 1980, in response to our letter dated April 17, 1980. As a result of our review, we find that additional infonnation, as discussed with you during a telephone call on May 30, 1980, is needed.

Specifically, your answer to deviation A does not address the failure to include the tamporary attachment operation on the FCL for airlock 303L, as required by your QA Manual, Section 13, subpara-graph 13.1.1.

Please provide this additional information within twenty (.20) days in order that we may complete our review in a timely manner.

Sincerely E,

/ h%

UldisPotapovs,dhiefi Vendor Inscection Branch 8009150$00