ML19344F290
| ML19344F290 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/14/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19344F291 | List: |
| References | |
| NUDOCS 8009150082 | |
| Download: ML19344F290 (2) | |
See also: IR 05000245/1980010
Text
-
- - - - - - - -
..
'Y
k
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
O
j
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA 19406
JUL 141980
Docket Nos. 50-245
50-336
Northeast Nuclear Energy Company
,
ATTN: Mr. W. G. Counsil
i
Senior Vice President - Nuclear
t
Engineering and Operations
!
P. O. Box 270
l
Hartford, Connecticut 06101
.
Gentlemen:
,
Subject: Combined Inspection 50-245/80-10 and 50-336/80-07
j
This refers to the inspection conducted by Mr. J. Shedlosky of this office on
June 1 through July 5,1980 at the Millstone Nuclear Power Station,
Waterford, Connecticut, of activities authorized by NRC License Nos. DPR-21
and DPR-65 and to the discussions of our findings held by Mr. Shedlosky with
Mr. Mroczka and other members of your staff periodically during the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
j
and representative records, interviews with personnel, measurements made by the
l
inspector, and observations by the inspector.
'
'
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
I
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any infomation that '/ou (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Comission as listed in subparagraph (b)(4) of Section 2.790.
The infomation sought to be withheld shall be incorporated as far as possible
,
into a separate p'rt of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
8009150 0 8 2
I
_.
z.
I
Northeast. Nuclear Energy Company
2
.
No reply to this' letter is required; however, if you should have any
V questions.concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
!
__ s
-
-
El o [Brunner, Chief
Rea or Operations and. Nuclear
Support Branch
Enclosure:
Office of Inspection and Enforcement Combined
Inspection Report Number 50-245/80-10 and 50-336/80-07
cc w/ encl:
J. F. Opeka, System Superintendent Nuclear Operations
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
. .
.
-
.
.
. . - -
. . - - .