Forwards IE Insp Repts 50-245/80-10 & 50-336/80-07 on 800601-0705.No Noncompliance Noted
ML19344F290
Person / Time
Site: Millstone  
Issue date: 07/14/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19344F291 List:
References
NUDOCS 8009150082
Download: ML19344F290 (2)


See also: IR 05000245/1980010

Text

-

- - - - - - - -

..

'Y

k

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

o

O

j

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA 19406

JUL 141980

Docket Nos. 50-245

50-336

Northeast Nuclear Energy Company

,

ATTN: Mr. W. G. Counsil

i

Senior Vice President - Nuclear

t

Engineering and Operations

!

P. O. Box 270

l

Hartford, Connecticut 06101

.

Gentlemen:

,

Subject: Combined Inspection 50-245/80-10 and 50-336/80-07

j

This refers to the inspection conducted by Mr. J. Shedlosky of this office on

June 1 through July 5,1980 at the Millstone Nuclear Power Station,

Waterford, Connecticut, of activities authorized by NRC License Nos. DPR-21

and DPR-65 and to the discussions of our findings held by Mr. Shedlosky with

Mr. Mroczka and other members of your staff periodically during the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

j

and representative records, interviews with personnel, measurements made by the

l

inspector, and observations by the inspector.

'

'

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

I

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any infomation that '/ou (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Comission as listed in subparagraph (b)(4) of Section 2.790.

The infomation sought to be withheld shall be incorporated as far as possible

,

into a separate p'rt of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

8009150 0 8 2

I

_.

z.

I

Northeast. Nuclear Energy Company

2

.

No reply to this' letter is required; however, if you should have any

V questions.concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

!

__ s

-

-

El o [Brunner, Chief

Rea or Operations and. Nuclear

Support Branch

Enclosure:

Office of Inspection and Enforcement Combined

Inspection Report Number 50-245/80-10 and 50-336/80-07

cc w/ encl:

J. F. Opeka, System Superintendent Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

. .

.

-

.

.

. . - -

. . - - .