o
/%
~
\\J TWO NORTH N!N T H ST R E E T, A L L E N TOW N, PA. 18101 P H o N E : (215) 8 21 5151 e
NCRVAN W C;JATIS vice Pferdent Engmee9eg & Carstracttcn-Nwctear August 19, 1980
/
Mr. Darrell G.
Eisenhut, Director
,/7/
Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 SUSQUEHANNA SES CCNSTRUCTION COMPLETION ESTIMATE AND TARGET FUEL LOAD DATE ER 100450 PLA 526 File 841-2
Dear Mr. Eisenhut,
The following is in response to your July 11, 1980 request for our best estimate of 'tel load dates for the Susquehanna plant.
For the past two months we have been conducting a comprehensive review of our project construction schedule including an evaluation of remaining work to complete the project and redefinition of work required to incorporate new features resulting from TMI.
Since prior estimates included substantial schedule contingency for additional TMI related plant additions which are not necessary to support fuel load, we are revising the percentage of completion of Unit #1 upward to 85%.
Our schedule for Susquehanna is now as follows:
Unit 1 Unit 2 Target Fuel Load June 1, 1991 Sept. 1, 1982 The primary system fill and flush of Unit #1 was completed on July 26, 1980.
The system hydro and reactor internal vibration tests are expected to be completed by September 16, ' ' 10.
Both of these dates are essentially on schedule with respect to milestone dates established over 5 months ago and are dates which were reviewed with the NRC Forecast Panel last March. With over 65% of plant systems in startup and critical milestones being completed on schedule, we firmly believe that a completion date of June, 1981, is realistic and will be achieved. This assessment is supported by historical experience of 40 weeks from hydro to fuel load.
It is obvious that there is a significant discrepancy between your committed schedule to complete the license of Unit 1 and our assessment of the completion of work at the site.
I would like to resolve this schedule mismatch as promptly as possible.
I believe it would be productive for our top management representatives to meet with you and other appropriate NRC representatives in the next week.
P E N N 5 Y LV A NI A Po wtR & LtGHTCoMPANY 8009120 M
-D Mr.'Darrell Eisenhut page 2 August 19, 1980 I will contact you by phone in the next day or so to arrange such a meeting.
Sincerely, A
I z
N. W. Curtis i
/kh t
h I
r i
i i
a 4 '
4
.i 4
I i
4 l-i 4
e
--,.-ne.--~=w-,
e-. +,
.,n.
-.-.-..a,-
-,--,,n.---,,,,--..,,n,_,,-,n,,wn,n,m-,,--,,,w-.--,----
,,---wr,-,
w n
,,-,--m,-,--w,-----
s.
.=
Mr. Norman W. Curtis Vice President - Engineering and Construction Pennsylvania Powr and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 cc: Mr. Earle M. Mead Mr. E. B. Poser Project Engineering Manager Project Encineer Pennsylvania Powr & Light Company Bechtel Power Corporation 2 North Ninth Street P. O. Box 3965 Allentown, Pennsyl vania 18101 San Francisco, California 94119 Jay Silberg, Esq.
Matias F. Travieso-Diaz, Esq.
Shaw, Pittman, Potts &
Shaw, Pittman, Potts &
Trowbridge Trowbridge 1800 M Street, N. W.
1800 M Street, N. W.
Washington, D. C.
20036 Washington, D. C.
20036 Mr. William E. Barberich, Dr. Judith H. Johnsrud Nuclear Licensing Group Supervisor Co-Director Pennsylvania Powr & Light Company Environmental Coalition on 2 North Ninth Street Nuclear Power Allentown, Pennsylvania 18101 433 Orlando Avenue State College, PA 16801 Edward M. Nagel, Esquire General Counsel and Secretary Mr. Thomas M. Gerusky, Director Pennsylvania Power & Light Company Bureau of Radiation Protection 2 North Ninth Street Department of Environmental Allentown, Pennsylvania 18101 Resources Commonwealth of Pennsylvania Bryan Snapp, Esq.
P. O. Box 2063 Pennsylvania Power & Light Company Harrisburg, PA 17120 2 North Ninth Street Allentown, Pennsylvania 18101 Ms. Colleen Marsh Box 538A, RDf4 Robert M. Gallo Mountain Top, PA 18707 Resident Inspector P. O. Box 52 Mrs. Irene Lemanowicz, Chairperson Shickshinny, Pennsylvania 18655 The Citizens Against Nuclear Dangers Susquehanna Environmental Advocates P. O. Box 377 c/o Gerald Schultz, Esq.
RD#1 500 South River Street Berwick, PA 18503 Wilkes-Barre, PA 18702 Mr. J. W. Millard John L. Anderson Project Manager Oak Ridge National Laboratory Fail Code 394 Union Carbide Corporation General Electric Comoany Bldg. 3500, P. O. Box X 175 Curtner Avenue Oak Ridge, Tennessee 37830 San Jose, California 95125
',o MEETIflG NOTICE DISTRIBUTION
'I E Docket File J. Stol z NRC PDR S. Hanauer Local PDR P. Collins TIC D. Vassallo NSIC D. Ziemann Branch File R. Mattson H. Denton R. Schroeder E. Case K. Kniel
-D. Eisenhut D. Skovholt R. Purple G. Knighton T. Novak M. Ernst S. Varga R. Baer T. Ippoli to E. Adensam R. A. Clark A. Thadani R. Reid ACRS (16)
R. Tedesco Attorney, OELD J. Youngblqod 0IE (3)
A. Schwencer OSD(7)
F.. Miraglia Project !ianager R. M. Stark J. R. Miller Licensing Assistant M. Rushbrook G. Lainas Receotionist D. Crutchfield r: TERA 4 -
W. Russell J. LeDoux, I&E J. Olshinski R. Vollmer IAE Headauarters R. Bosnak
-I&E Region I F. Schauer I&E Region II R. E. Jackson ISE Region III G. Lear I&E Reaion IV V.-Noonan.
I&E Region V S. Pawlicki V. Benaroya NRC
Participants:
Z. Rosztoczy W. Haass D. Eisenhut, R. Tedesco, B. J. Youngblood, D. iluller R. M. Stark R. Ballard W. Regan J. D. Saltzman D. Ross P. Check l
R. Satterfield l
- 0. Parr bcc: Applicant & Service List F. Rosa W. Butler W. Kreger R. W. Houston T. Murphy l
W. Gammill L. Rubenstein l
T. Sneis W. Johnston l
B. Grimes H. Collin' F. Pagano l
Emergency PreDaredness Development Branch i
.. -.