Text
-
, 9 .*
,
s
d iscoq'o
UNITED STATES
!4 3g[g
NUCLEAR REGULATORY COMMISSION
,
g
f,
s
REGION ll
o
1o1 MARIETTA sT., N.W., SUITE 310o
ATLANTA, GEORGIA 3o3o3
.....
In Reply Refer To:
RII: WAR
50-348/80-14
50-364/80-16
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers O the inspection conducted by W. A. Ruhlman of this office on
June 9-13 and June 16-20, 1980, of activities authorized by NRC License No. NPF-2
and Construction Permit No. CPPR-86 for the Farley facility, and to the discussion
of our findings held with W. G. Hairston, III on site and with you and members
of your staff at the Company offices at the conclusion of the inspection.
This inspection was a comprehensive examination of your management and quality
assurance controls related to licensed activities. Inspection was conducted in
selected key areas of responsibility at both the plant site and the Company
offices. Areas exat6fdEd1Gring Lne inspeccion amT OUT fiHdiGgr3rE115 cussed'iD-
-
the enclosed inspection report. Within these areas, the inspection consisted of
selective exeninations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During this inspection it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent raquirewnts are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken 1y you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved. : lith regard to Item C, corrective
actions to prevent recurrence were completed puor to conclusion of this inspection;
therefore, a reply is not requested for thf s item.
Six new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,.
Title 10, Code of Federal Re - lations, a copy of this letter and the enclosed
inspection report will be p ..ed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
6 0 0 912 0045 ^
9
.
.
.
.
o'
.
.
.
.
Alabama Power Company
-2-
P
it is claimed that the 4.nformation is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
)?. C".
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Icspection Report Nos. 50-348/30-14
and 50-364/80-16
cc w/ encl:
A. R. Barton, Executive Vice President
F. L. Clayton, Jr., Senior Vice President
H. O. Thrash, Manager-Nuclear Generation
O. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-0perat.lons
Quality Assurance
W. G. Hairston, III, Plant Manager
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
,