Forwards IE Insp Repts 50-518/80-13,50-519/80-13, 50-520/80-13 & 50-521/80-13 on 800601-28.No Noncompliance Noted
ML19344E730
Person / Time
Site: Hartsville  
Issue date: 07/28/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19344E731 List:
References
NUDOCS 8009110111
Download: ML19344E730 (2)


See also: IR 05000518/1980013

Text

.

f

/

4

UNITED STATES

8

%

NUCLEAR REGULATORY COMMISSION

!

C

5

E

REGION 11

"o,

101 MARIETTA ST., N.W., sulTE 3100

i

0

)

ATLANTA, GEORGIA So303

31. 2 8 E0

In Reply-Refe To:

IfWBS

0-518/80-13

50-519/80-13

'

50-520/80-13

0-13

' Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by W. B. Swan of this office on June 1

thru June 28, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville facility, and to

.

the discussion of our findings held with R. T. Hathcote at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard witbin

the specified period, the report will be placed in the Public Documeut. Room.

.

8009110/#

Q

.

.

..

-.

.

.

2-

01, 2 8 Q80

Tennessee Valley Authority

-

,

Should you have any questions concerning t.his letter, we will be glad to discuss

them with you.

Sincerely,

.

n

C. E. Murphy, Chie

Reactor Construction and Engineering

Support Branch

Enclosure:

'

Inspection Report Nos. 50-518/80-13,

50-519/80-13, 50-520/80-13 and 50-521/80-13

cc w/ encl:

R. T. Hathcote, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

.

J. E. Wills, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Revie< Staff

r

o

0

4

{

e

,

1

,

y

9

wg

, ,

y my

+-v^-

w'-

-M

  • -6yF

'--"-9'N

-

'-M

'*

U

'

'