ML19344E646

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 80-20, Failures of Westinghouse, Type W-2 Spring Return to Neutral Control Switches. Review Suspended During Feasibility Study for Facility.Review Will Be Resumed If Study Indicates Continuance of Nuclear Units
ML19344E646
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/27/1980
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
690, IEB-80-20, NUDOCS 8009020399
Download: ML19344E646 (1)


Text

August 27, 1930 Mr. James P. O'Reilly, Director Serial No. 690 Office of Inspection & Enforcement PSE&C/SGE:bmt U. S. Nuclear Regulatory Comnission Region II Docket Nos. 50-404 101 Marietta Street, Suite 3100 50-405 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

IE BULLETIN NO. 60-20 FAILURES OF WESTINGHOUSE TYPE W-2 SP9ING 9ETUPN TO NEUTPAL CONTROL 5 WITCHES As you know, Virginia Electric snd Pcwer Cermany is perfanning a feasibility study of.iorth Anna Units 3 and 4.

For the duration of this study, we have cur-tailed our activities, most notably in nuclear related areas. Therefore, we have suspended our review of the subject Sulletin. We will resume our review of this Bulletin if the study indicates continuing with North Anna Units 3 and 4 as nuclear units.

If there are any questions, please contact us.

Very truly yours, San C. Cro$n, Jr.

Senior Vice President - P:wer Station Engineering and Construction ec: ;4r. Victor Stallo, 01 rector Office of Inspection $ Enforcement "r. Harold 't. Denten, Director Office of 4uclear Reactor Regulation l

l I

?>m/

s ll0 l

l 8009020 399

'Df"]D S D DfiB

' M A @ul]"M@L]A/nl3 AA

_.