ML19344E520

From kanterella
Jump to navigation Jump to search
Ack Receipt of from JW Cook Transmitting Rept on Reactor Pressure Vessel Support Mod
ML19344E520
Person / Time
Site: Midland
Issue date: 08/11/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8009020165
Download: ML19344E520 (1)


Text

TIQ4 1

UNITED STATES s>R "812 g NUCLEAR REGULATORY COMMISSION g

REGION itt g

,1 o

O I' f 799 ROOSEVELT ROAD

  • g otEn ELLvn. ILLINOIS 60137 TAUG 1 1 880 Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN: Mr. Stephen H. Howell Senior Vice President 1945 West Parnell Road Jackson, MI 49201 Gentlemen:

Thank you for the letter from J. W. Cook dated July 24, 1980, trans-mitting the report on the reactor pressure vessel support modification.

We will transmit this report to our headquarters for their review.

Your cooperation with us is appreciated.

Sincerely, W

Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc'w/ltr dtd 7/24/80:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen Michigan Public Service Commission Myron M. Cherry, Chicago S009000kb>

i-1 Consumers Power e

James w cook O

Vice President, Msdland Project Generet offscos. 1945 West Pernett Road, Jackson, Michs en 49201 (517) 788-0640 e

July 24, 1980 Mr J G Keppler, Regional Director Office of Inspection and Enforcement US Nuclear Regulatory Comission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT -

UNIT NO 1, DOCKET NO 50-329 UNIT NO 2, DOCKET NO 50-330 REACTOR PRESSURE VESSEL SUPPORT MODIFICATION FILE:

0.h.9.35 UFI:

73*10'01, 02111 (S) 21114 (E) SERIAL: 9330 As agreed during the May 23, 1980 meeting at Bethesda, Maryland, we are submitting a report entitled " Reactor Pressure Vessel Support Modification for Midland Nuclear Power Plant, Midland, Michigan, Preliminary Report No.

1."

This report describes the proposed modification including the design allowable stresses for the reactor vessel anchor bolts and other design criteria.

This report also describes the current schedule for the support modification.

Per this schedule, we vill submit a final report to the NRC by October 1980 describing the final design loads and detailed analytical techniques to be used. We request that the NRR staff and all other NRC groups as. appropriate review this material in a timely manner. We would appreciate having NRC review and concurrence with these modifications by December,1980 in order to complete this work on a schedule compatible with the overall project schedule.

a A w 'tJ W JWC/blt g

go0 W Od

^

~ ~

-.+..v.

- ~.

2

Enclosure:

(1) Report entitled " Reactor Pressure, Vessel Support Modification for Midland Nuclear Power Plant, Midland, Michigan, Preliminary Report No. 1."

Director, Office of Inspection & Enforcement CC:

Att Mr Victor Stello, US!;EC (38)

Director, Office of Management Information & Pro 6 ram Control, USNRC (1) 1 e

4 f

4 4

4 4

8 w

-*,*~~e.mw y e..._y._..~_y r_,.,

REACTOR PRESSURE VESSEL SUPPORT MODIFICATION FOR MIDLAND NUCLEAR POWER PLANT MIDLAND, MICHIGAN PRELIMINARY REPORT NO. 1 JULY 1980 m.

+

.1 _:

-7 4

DUPLICATE DOCUMENT j

,j

~*

i Entire document previously i

entered into system under:

.b d D

ANO

.4 No. of pages:

[h yn.

}i;.~,

4, < ain,dib a:;-

,u 8F.%.

.d N A sYNs. 5.+.

e

'. + n s's 4

,